Tworóg-Kędzierzyn gas pipeline (Q86120)

From EU Knowledge Graph
Revision as of 08:41, 24 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q86120 in Poland
Language Label Description Also known as
English
Tworóg-Kędzierzyn gas pipeline
Project Q86120 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    147,118,170.52 zloty
    0 references
    32,704,369.31 Euro
    13 January 2020
    0 references
    219,250,004.55 zloty
    0 references
    48,739,276.01 Euro
    13 January 2020
    0 references
    67.1 percent
    0 references
    1 January 2015
    0 references
    31 December 2020
    0 references
    OPERATOR GAZOCIĄGÓW PRZESYŁOWYCH GAZ-SYSTEM S.A.
    0 references
    0 references

    50°20'43.8"N, 18°14'41.3"E
    0 references

    50°21'34.9"N, 18°24'29.9"E
    0 references

    50°27'18.4"N, 18°31'5.2"E
    0 references

    50°30'32.0"N, 18°36'45.0"E
    0 references

    50°31'54.8"N, 18°43'7.3"E
    0 references
    Przedmiotem projektu jest budowa gazociągu Tworóg - Kędzierzyn o średnicy DN1000 i maksymalnym ciśnieniu roboczym MOP 8,4 MPa, węzła przesyłu gazu Tworóg wraz ze śluzą uniwersalną nadania i odbioru tłoka inspekcyjnego wraz z infrastrukturą towarzyszącą, liniowych zespołów zaporowo-upustowych z układami obejściowymi wyposażonymi w kolektory umożliwiające podłączanie nowych stacji/odbiorców (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Polish)
    0 references
    The subject of the project is the construction of the Tworóg – Curtain with DN1000 diameter and maximum operating pressure of the ILO 8.4 MPa, the Tworóg gas transfer node with the universal lock of the inspection piston, along with the accompanying infrastructure, linear firewalls with bypass systems equipped with collectors to connect new stations/receivers (ZZU, Blachownia). (English)
    14 October 2020
    0 references
    L’objet du projet est la construction du gazoduc Tworóg — Kędzierzyn avec diamètre DN1000 et pression maximale de travail MOP 8,4 MPa, le nœud de transmission de gaz Tworóg ainsi que la serrure universelle pour la transmission et la réception du piston d’inspection, ainsi que l’infrastructure d’accompagnement, d’unités de barrage linéaires avec systèmes de dérivation équipés de collecteurs pour le raccordement de nouvelles stations/récepteurs (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (French)
    30 November 2021
    0 references
    Gegenstand des Projekts ist der Bau der Gaspipeline Tworóg – Kędzierzyn mit Durchmesser DN1000 und maximalem Arbeitsdruck MOP 8.4 MPa, der Gasfernleitungsknoten Tworóg zusammen mit dem Universalschloss für die Übertragung und den Empfang des Prüfkolbens zusammen mit der dazugehörigen Infrastruktur von linearen Stauwerken mit Bypass-Systemen, die mit Verteilern für den Anschluss neuer Stationen/Empfänger (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice) ausgestattet sind. (German)
    7 December 2021
    0 references
    Het doel van het project is de aanleg van de gasleiding Tworóg — Kędzierzyn met diameter DN1000 en maximale werkdruk MOP 8,4 MPa, het Tworóg-gastransmissieknooppunt samen met het universele slot voor de transmissie en ontvangst van de inspectiezuiger, samen met de bijbehorende infrastructuur, van lineaire dam-up-eenheden met bypasssystemen die zijn uitgerust met spruitstukken voor het aansluiten van nieuwe stations/ontvangers (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Dutch)
    16 December 2021
    0 references
    Oggetto del progetto è la costruzione del gasdotto Tworóg — Kędzierzyn con diametro DN1000 e pressione massima di esercizio MOP 8,4 MPa, il nodo di trasmissione del gas Tworóg insieme alla serratura universale per la trasmissione e la ricezione del pistone di ispezione, insieme all'infrastruttura di accompagnamento, di unità di smorzamento lineari con sistemi di bypass dotati di collettori per il collegamento di nuove stazioni/ricevitori (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Italian)
    16 January 2022
    0 references
    El objeto del proyecto es la construcción del gasoducto Tworóg — Kędzierzyn con diámetro DN1000 y presión máxima de trabajo MOP 8,4 MPa, el nodo de transmisión de gas Tworóg junto con la cerradura universal para la transmisión y recepción del pistón de inspección, junto con la infraestructura de acompañamiento, de unidades de presa lineales con sistemas de derivación equipados con colectores para conectar nuevas estaciones/receptores (ZZU Blachownia, ZZU Poniszowice, ZZU Gajowice). (Spanish)
    19 January 2022
    0 references
    Emnet for projektet er opførelsen af Tworóg â EUR gardin med DN1000 diameter og maksimalt driftstryk af ILO 8.4 MPa, Tworóg gasoverførsel node med den universelle lås af inspektion stemplet, sammen med den ledsagende infrastruktur, lineære firewalls med bypass-systemer udstyret med samlere til at forbinde nye stationer/modtagere (ZZU, Blachownia). (Danish)
    26 July 2022
    0 references
    Αντικείμενο του έργου είναι η κατασκευή του κουρτινιού Tworóg â EUR με διάμετρο DN1000 και μέγιστη πίεση λειτουργίας του ILO 8,4 MPa, του κόμβου μεταφοράς αερίου Tworóg με την καθολική κλειδαριά του εμβόλου επιθεώρησης, μαζί με τη συνοδευτική υποδομή, γραμμικά τείχη προστασίας με συστήματα παράκαμψης εξοπλισμένα με συλλέκτες για τη σύνδεση νέων σταθμών/δέκτη (ZZU, Blachownia). (Greek)
    26 July 2022
    0 references
    Predmet projekta je izgradnja Tworóg âEUR Zavjesa s promjerom DN1000 i maksimalnim radnim tlakom ILO-a 8.4 MPa, čvora za prijenos plina Tworóg s univerzalnom bravom inspekcijskog klipa, zajedno s pratećom infrastrukturom, linearnim vatrozidima s obilaznim sustavima opremljenim kolektorima za povezivanje novih postaja/prijemnika (ZZU, Blachownia). (Croatian)
    26 July 2022
    0 references
    Obiectul proiectului este construirea Cortinei Tworóg cu diametrul DN1000 și presiunea maximă de operare a OIM 8.4 MPa, nodul de transfer de gaz Tworóg cu blocarea universală a pistonului de inspecție, împreună cu infrastructura însoțitoare, firewall-uri liniare cu sisteme de bypass echipate cu colectoare pentru a conecta noi stații/receptoare (ZZU, Blachownia). (Romanian)
    26 July 2022
    0 references
    Predmetom projektu je výstavba opony Tworóg s priemerom DN1000 a maximálnym prevádzkovým tlakom MOP 8.4 MPa, prevodného uzla plynu Tworóg s univerzálnym zámkom kontrolného piestu, spolu so sprievodnou infraštruktúrou, lineárnymi firewallmi s obtokovými systémami vybavenými kolektormi na pripojenie nových staníc/prijímačov (ZZU, Blachownia). (Slovak)
    26 July 2022
    0 references
    Is-suġġett tal-proġett huwa l-kostruzzjoni tal-Purtiera tal-EUR Tworóg b’dijametru DN1000 u pressjoni operattiva massima tal-ILO 8.4 MPa, in-nodu tat-trasferiment tal-gass Tworóg bil-lock universali tal-pistun ta ‘spezzjoni, flimkien mal-infrastruttura ta’ akkumpanjament, firewalls lineari b’sistemi ta ‘bypass mgħammra b’kolletturi biex jgħaqqdu stazzjonijiet/riċevituri ġodda (ZZU, Blachownia). (Maltese)
    26 July 2022
    0 references
    O objeto do projeto é a construção do Tworóg âEUR Cortina com diâmetro DN1000 e pressão máxima de funcionamento do OIT 8.4 MPa, o nó de transferência de gás Tworóg com o bloqueio universal do pistão de inspeção, juntamente com a infraestrutura de acompanhamento, firewalls lineares com sistemas de derivação equipados com coletores para conectar novas estações/recetores (ZZU, Blachownia). (Portuguese)
    26 July 2022
    0 references
    Hankkeen aiheena on rakentaminen Tworóg âEUR Verhoon DN1000 halkaisija ja maksimi käyttöpaine ILO 8.4 MPa, Tworóg kaasunsiirtosolmu universaali lukko tarkastus mäntä, sekä siihen liittyvä infrastruktuuri, lineaarinen palomuurit ohitusjärjestelmät varustettu keräimillä yhdistää uudet asemat/vastaanottimet (ZZU, Blachownia). (Finnish)
    26 July 2022
    0 references
    Predmet projekta je gradnja zavese Tworóg s premerom DN1000 in največjim delovnim tlakom ILO 8.4 MPa, vozlišče za prenos plina TworÃg z univerzalno ključavnico inšpekcijskega bata, skupaj s spremljajočo infrastrukturo, linearnimi požarnimi zidovi z obvodnimi sistemi, opremljenimi z zbiralniki za povezavo novih postaj/sprejemnikov (ZZU, Blachownia). (Slovenian)
    26 July 2022
    0 references
    Předmětem projektu je výstavba opony Tworóg s průměrem DN1000 a maximálním provozním tlakem MOP 8,4 MPa, uzel pro přenos plynu Tworóg s univerzálním zámkem inspekčního pístu spolu s doprovodnou infrastrukturou, lineárními firewally s obtokovými systémy vybavenými kolektory pro připojení nových stanic/přijímačů (ZZU, Blachownia). (Czech)
    26 July 2022
    0 references
    Projekto objektas yra Duróróg â EUR uždanga su DN1000 skersmens ir maksimalaus darbinio slėgio TDO 8.4 MPa, Duróróg dujų perdavimo mazgas su universalia spyna tikrinimo stūmoklio, kartu su pridedama infrastruktūra, linijinės ugniasienės su aplinkkelio sistemos įrengta kolektoriai prijungti naujas stotis/imtuvus (ZZU, Blachownia) statybos. (Lithuanian)
    26 July 2022
    0 references
    Projekta priekšmets ir būvniecība Tworóg â EUR Aizkars ar DN1000 diametru un maksimālo darba spiedienu SDO 8.4 MPa, Tworóg gāzes pārvades mezgls ar universālo slēdzeni inspekcijas virzuļa, kopā ar pievienoto infrastruktūru, lineārās ugunsmūri ar apvedceļa sistēmām, kas aprīkotas ar kolektoriem, lai savienotu jaunas stacijas/uztvērēji (ZZU, Blachownia). (Latvian)
    26 July 2022
    0 references
    Предмет на проекта е изграждането на завесата Tworóg â EUR с диаметър DN1000 и максимално експлоатационно налягане на МОТ 8,4 MPa, възел за пренос на газ Tworóg с универсалната ключалка на инспекционното бутало, заедно със съпътстващата инфраструктура, линейни защитни стени с байпасни системи, оборудвани с колектори за свързване на нови станции/приемници (ZZU, Blachownia). (Bulgarian)
    26 July 2022
    0 references
    A projekt tárgya a kétkerekű függöny DN1000 átmérőjű és maximális üzemi nyomása az ILO 8,4 MPa, a Tworóg gázátviteli csomópont az univerzális zár az ellenőrző dugattyú, valamint a kapcsolódó infrastruktúra, lineáris tűzfalak bypass rendszerek felszerelt gyűjtővel, hogy csatlakoztassa az új állomások/vevők (ZZU, Blachownia). (Hungarian)
    26 July 2022
    0 references
    Is é ábhar an tionscadail ná tógáil an â EUR â 3³g â EUR âEUR Curtain le trastomhas DN1000 agus brú oibriúcháin uasta an EIS 8.4 MPa, an nód aistrithe gáis Tworóg leis an glas uilíoch an loine cigireachta, chomh maith leis an mbonneagar a ghabhann leis, ballaí dóiteáin líneach le córais seachbhóthar atá feistithe le bailitheoirí chun ceangal stáisiúin nua/Glacadóirí (ZZU, Blachownia). (Irish)
    26 July 2022
    0 references
    Ämnet för projektet är byggandet av Tworóg â EUR Gardin med DN1000 diameter och högsta drifttryck ILO 8.4 MPa, Tworóg gasöverföringsnod med den universella lås av inspektion kolven, tillsammans med tillhörande infrastruktur, linjära brandväggar med förbifartssystem utrustade med solfångare för att ansluta nya stationer/mottagare (ZZU, Blachownia). (Swedish)
    26 July 2022
    0 references
    Projekti teema on ehitus Tworóg âEUR kardin läbimõõduga DN1000 ja maksimaalne töörõhk ILO 8.4 MPa, Tworóg gaasi ülekandesõlm koos universaallukk kontrolli kolb, koos kaasneva infrastruktuuri, lineaarsed tulemüürid ümbersõidu süsteemid varustatud kollektorid ühendada uusi jaamad/vastuvõtjad (ZZU, Blachownia). (Estonian)
    26 July 2022
    0 references
    WOJ.: OPOLSKIE, POW.: kędzierzyńsko-kozielski
    0 references
    WOJ.: ŚLĄSKIE, POW.: gliwicki
    0 references
    WOJ.: ŚLĄSKIE, POW.: tarnogórski
    0 references

    Identifiers

    POIS.07.01.00-00-0008/17
    0 references