Improvement of water and sewage management in the City and the Municipality of Piwniczna-Zdrój (Q85226)

From EU Knowledge Graph
Revision as of 09:01, 21 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Import item from Poland)
Jump to navigation Jump to search
Project Q85226 in Poland
Language Label Description Also known as
English
Improvement of water and sewage management in the City and the Municipality of Piwniczna-Zdrój
Project Q85226 in Poland

    Statements

    0 references
    4,009,756.24 zloty
    0 references
    891,368.81 Euro
    13 January 2020
    0 references
    4,717,360.29 zloty
    0 references
    1,048,669.19 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2016
    0 references
    30 June 2019
    0 references
    MIASTO I GMINA PIWNICZNA-ZDRÓJ
    0 references
    0 references
    0 references
    Projekt zakłada zarówno rozbudowę istniejącej oczyszczalni ścieków w miejscowości Piwniczna-Zdrój z 5560 RLM do 8474 RLM, jak również budowę nowych odcinków kanalizacji sanitarnej o długości 4,93 km, w wyniku czego zostanie podłączonych 380 RLM. (Polish)
    0 references
    The project involves both the extension of the existing sewage treatment plant in Piwniczna-Zdrój from 5560 RLM to 8474 RLM, as well as the construction of new sections of sanitary sewage system with a length of 4.93 km, resulting in a connection of 380 RLM. (English)
    14 October 2020
    0 references
    Le projet porte à la fois sur l’extension de la station d’épuration existante de Piwniczna-Zdrój de 5560 à 8474 EH, ainsi que sur la construction de nouveaux tronçons du réseau d’égouts d’une longueur de 4,93 km, ce qui permettra de relier 380 EH. (French)
    30 November 2021
    0 references
    Das Projekt umfasst sowohl die Erweiterung der bestehenden Kläranlage in Piwniczna-Zdrój von 5560 auf 8474 S.E., als auch den Bau neuer Abschnitte der Kläranlage mit einer Länge von 4,93 km, wodurch 380 S.E. verbunden werden. (German)
    7 December 2021
    0 references
    Het project omvat zowel de uitbreiding van de bestaande rioolwaterzuiveringsinstallatie in Piwniczna-Zdrój van 5560 i.e. tot 8474 i.e., als de bouw van nieuwe delen van het riool met een lengte van 4,93 km, waardoor 380 i.e. zal worden aangesloten. (Dutch)
    16 December 2021
    0 references
    Il progetto prevede sia l'ampliamento dell'impianto di depurazione esistente a Piwniczna-Zdrój da 5560 a.e. a 8474 a.e., sia la costruzione di nuovi tratti del sistema fognario di lunghezza di 4,93 km, per cui 380 a.e. saranno collegati. (Italian)
    16 January 2022
    0 references
    El proyecto implica la ampliación de la depuradora existente en Piwniczna-Zdrój de 5560 e-h a 8474 e-h, así como la construcción de nuevos tramos del sistema de alcantarillado con una longitud de 4,93 km, lo que permitirá conectar 380 e-h. (Spanish)
    19 January 2022
    0 references
    Projektet omfatter både udvidelse af det eksisterende rensningsanlæg i Piwniczna-Zdrój fra 5560 RLM til 8474 RLM samt opførelse af nye sektioner af kloaksystemer med en længde på 4,93 km, hvilket resulterer i en tilslutning på 380 RLM. (Danish)
    26 July 2022
    0 references
    Το έργο αφορά τόσο την επέκταση της υφιστάμενης μονάδας επεξεργασίας λυμάτων στο Piwniczna-Zdrój από 5560 RLM σε 8474 RLM, όσο και την κατασκευή νέων τμημάτων συστημάτων αποχέτευσης με μήκος 4,93 km, με αποτέλεσμα τη σύνδεση 380 RLM. (Greek)
    26 July 2022
    0 references
    Projekt uključuje proširenje postojećeg uređaja za pročišćavanje otpadnih voda u Piwniczna-Zdrój s 5560 RLM na 8474 RLM, kao i izgradnju novih dijelova sustava sanitarne kanalizacije duljine 4,93 km, što rezultira povezivanjem 380 RLM-a. (Croatian)
    26 July 2022
    0 references
    Proiectul implică atât extinderea stației de epurare a apelor uzate existente în Piwniczna-Zdrój de la 5560 RLM la 8474 RLM, cât și construirea de noi secțiuni de sisteme sanitare de canalizare cu o lungime de 4,93 km, rezultând o conexiune de 380 RLM. (Romanian)
    26 July 2022
    0 references
    Projekt zahŕňa rozšírenie existujúcej čistiarne odpadových vôd v Piwniczna-Zdrój z 5560 RLM na 8474 RLM, ako aj výstavbu nových úsekov sanitárnych kanalizačných systémov s dĺžkou 4,93 km, výsledkom čoho je pripojenie 380 RLM. (Slovak)
    26 July 2022
    0 references
    Il-proġett jinvolvi kemm l-estensjoni tal-impjant eżistenti tat-trattament tad-drenaġġ f’Piwniczna-Zdrój minn 5560 RLM għal 8474 RLM, kif ukoll il-kostruzzjoni ta’ sezzjonijiet ġodda tas-sistema tad-drenaġġ sanitarja b’tul ta’ 4.93 km, li jirriżultaw f’konnessjoni ta’ 380 RLM. (Maltese)
    26 July 2022
    0 references
    O projeto envolve tanto a ampliação da estação de tratamento de esgoto existente em Piwniczna-Zdrój de 5560 RLM para 8474 RLM, como a construção de novos troços de esgoto sanitário com um comprimento de 4,93 km, resultando em uma conexão de 380 RLM. (Portuguese)
    26 July 2022
    0 references
    Hankkeeseen sisältyy sekä Piwniczna-Zdrój:n olemassa olevan jätevedenpuhdistamon laajentaminen 5560 RLM:stä 8474 RLM:ään että 4,93 kilometrin pituisten saniteettijätevesijärjestelmän uusien osien rakentaminen, mikä johtaa 380 RLM:ään. (Finnish)
    26 July 2022
    0 references
    Projekt vključuje tako razširitev obstoječe čistilne naprave v Piwniczna-Zdrój s 5560 RLM na 8474 RLM kot tudi gradnjo novih delov sanitarnega kanalizacijskega sistema dolžine 4,93 km, kar pomeni povezavo 380 RLM. (Slovenian)
    26 July 2022
    0 references
    Projekt zahrnuje jak rozšíření stávající čistírny odpadních vod v Piwniczna-Zdrój z 5560 RLM na 8474 RLM, tak výstavbu nových úseků sanitárních odpadních vod o délce 4,93 km, což vede k propojení 380 RLM. (Czech)
    26 July 2022
    0 references
    Projektas apima tiek esamų nuotekų valymo įrenginių plėtrą Piwniczna-Zdrówj nuo 5560 RLM iki 8474 RLM, taip pat naujų sekcijų sanitarinių nuotekų sistemos ilgis 4,93 km, todėl jungtis 380 RLM. (Lithuanian)
    26 July 2022
    0 references
    Projekts ietver gan esošās notekūdeņu attīrīšanas iekārtas Piwniczna-Zdrój paplašināšanu no 5560 RLM uz 8474 RLM, gan jaunu 4,93 km garu sanitārās kanalizācijas sistēmas posmu būvniecību, kā rezultātā tika izveidots savienojums ar 380 RLM. (Latvian)
    26 July 2022
    0 references
    Проектът включва както разширяването на съществуващата станция за пречистване на отпадъчни води в Piwniczna-Zdrój от 5560 RLM на 8474 RLM, така и изграждането на нови участъци от санитарна канализационна система с дължина 4,93 km, което води до свързване на 380 RLM. (Bulgarian)
    26 July 2022
    0 references
    A projekt magában foglalja a Piwniczna-Zdró³j-i szennyvíztisztító telep 5560 RLM-ről 8474 RLM-re történő kiterjesztését, valamint a 4,93 km hosszú egészségügyi szennyvízrendszer új szakaszainak megépítését, ami 380 RLM csatlakozását eredményezi. (Hungarian)
    26 July 2022
    0 references
    Is éard atá i gceist leis an tionscadal síneadh a chur leis an ngléasra cóireála séarachais atá ann cheana féin in Piwniczna-Zdrój ó 5560 RLM go 8474 RLM, chomh maith le codanna nua den chóras séarachais sláintíochta a thógáil le fad 4.93 km, rud a fhágann nasc 380 RLM. (Irish)
    26 July 2022
    0 references
    Projektet omfattar både en utbyggnad av det befintliga avloppsreningsverket i Piwniczna-Zdrój från 5560 RLM till 8474 RLM samt uppförande av nya sektioner av avloppssystem med en längd på 4,93 km, vilket resulterar i en anslutning av 380 RLM. (Swedish)
    26 July 2022
    0 references
    Projekt hõlmab nii olemasoleva reoveepuhasti laiendamist Piwniczna-Zdr³j-lt 5560 RLM-ile 8474 RLM-ile kui ka 4,93 km pikkuse kanalisatsioonisüsteemi uute osade ehitamist, mille tulemuseks on ühendus 380 RLM-iga. (Estonian)
    26 July 2022
    0 references
    WOJ.: MAŁOPOLSKIE, POW.: nowosądecki
    0 references

    Identifiers

    POIS.02.03.00-00-0039/16
    0 references