Development of the banks of the Maroni – Phase 2 (Q4296528)

From EU Knowledge Graph
Revision as of 00:44, 7 October 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding missing NUTS)
Jump to navigation Jump to search
Project Q4296528 in Guyana
Language Label Description Also known as
English
Development of the banks of the Maroni – Phase 2
Project Q4296528 in Guyana

    Statements

    0 references
    0 references
    2,250,000.0 Euro
    0 references
    3,000,000.0 Euro
    0 references
    75.0 percent
    0 references
    1 March 2019
    0 references
    CCOG-Communauté de communes de l’Ouest guyanais
    0 references
    0 references

    5°40'4.84"N, 53°46'44.26"W
    0 references
    Il s’agit de mettre en place des infrastructures adéquates pour la mise en service du nouveau bac sur le Maroni, et de désenclaver le territoire et de permettre le rapprochement des deux territoires (Suriname et Guyane) via le renforcement de l’offre et de la qualité des transports. DESCRIPTION DU PROJET: En Guyane : 1. Création et installation de 4 Ducs d’Albe d’accostage et d’amarrage. 2. Création d’un ensemble d’amarrage : constitué de point d’amarrage sur ducs d’Albe et de bollards en sommet de rampe. 3. Réalisation d’une rampe bétonnée : rampe constituée d’une dalle portée sur forme en matériaux insensibles à l’eau construite sous batardeau ; fondée sur un réseau d’appuis par pieux verticaux. Par ailleurs, une dalle de transition sera mise en oeuvre à l’interface entre le nouvel ouvrage et le terre-plein portuaire en construction. (French)
    0 references
    The aim is to put in place adequate infrastructure for the commissioning of the new ferry on the Maroni, and to open up the territory and allow the rapprochement of the two territories (Suriname and Guyana) by strengthening the offer and the quality of transport. PROJECT DESCRIPTION: In French Guiana: 1. Creation and installation of 4 dolphins for docking and mooring. 2. Creation of a mooring system: made up of mooring points on dolphins and bollards at the top of the ramp. 3. Realization of a concrete ramp: ramp consisting of a slab carried on form in materials insensitive to water built under a cofferdam; based on a network of vertical pile supports. In addition, a transition slab will be implemented at the interface between the new structure and the port median under construction. (English)