Development of road infrastructure between Snina, Medzilaborce and Krosno (Q4296428)

From EU Knowledge Graph
Revision as of 19:23, 10 June 2022 by DG Regio (talk | contribs) (‎Created a new Item: Import item from Poland, Slovakia)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
No description defined
Language Label Description Also known as
English
Development of road infrastructure between Snina, Medzilaborce and Krosno
No description defined

    Statements

    0 references
    0 references
    5,972,113.89 Euro
    0 references
    7,026,016.36 Euro
    0 references
    85.0 percent
    0 references
    3 October 2016
    0 references
    31 May 2018
    0 references
    SPRÁVA A ÚDRŽBA CIEST PREŠOVSKÉHO SAMOSPRÁVNEHO KRAJA
    0 references

    50°2'24.94"N, 21°59'54.71"E
    0 references

    48°57'55.51"N, 21°15'23.87"E
    0 references
    The purpose of the planned modernization is to remove the unfavourable structural and technical condition of the road and the water drainage system from the roads no. II/567 and II/575. The remaining construction works consist in stabilisation of the local landslides, repair of the damaged culverts, water drainage, clearing the ditches, bridge asphalt milling, smoothing the road surface, organisation of roadsides, slope regulation, broadening the road structure at its turns, renovation and replacement of barriers, including the varnish, reconstruction of the upper layer with ACo II - 11 gr. 50 mm, supply of the missing elements on Road II/567 within its three sections and stabilisation of the local landslides, repair of the damaged culverts, water drainage, clearing the ditches, milling of bridge surface and surface of road section connecting Medzilaborce, smoothing the road surface, organisation of roadsides, broadening the road structure at its turns, renovation and replacement of barriers, including the varnish, reconstruction of the upper layer with ACo II - 11 gr. 50 mm, renovation of gully tops in Medzilaborce, supply of the missing elements on road II/575 within its two sections. Road no. II/567 with its total length of 5.311 km and average width of its three sections calculated at 6.5 m. Road no. II/575 with its total length of 6.992 km and average width of its two sections calculated at 6.5 m. Project Partner has proposed to reconstruct road no. 897 at a 6.850-kilometer section. The road connects directly to the TEN-T corridor. Reconstruction of road, bridges and construction of water drainage is planned with regard to that road. It is designed (project documentation is complete) in line with the comparable technical parameters. (English)
    0 references

    Identifiers

    0 references