Transport development in Szabolcs-Szatmár-Bereg county 4. (Q3947481)

From EU Knowledge Graph
Revision as of 02:51, 15 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q3947481 in Hungary
Language Label Description Also known as
English
Transport development in Szabolcs-Szatmár-Bereg county 4.
Project Q3947481 in Hungary

    Statements

    0 references
    3 July 2017
    0 references
    28 February 2021
    0 references
    Magyar Közút Nonprofit Zártkörűen Működő Részvénytársaság
    0 references
    0 references

    48°4'41.59"N, 21°51'34.81"E
    0 references
    A projekt keretében mindösszesen 20,162 km hosszon kerül mellékúthálózati szakasz felújításra. A beavatkozás során a meglévő burkolat profilmarását végezzük el, majd kötő és kopóréteg beépítésével alakítjuk ki az új burkolatot. A vízelvezetést a meglévő vízelvezetési rendszer felújításával, jó karba helyezésével biztosítjuk, valamint az útpadka is rendezésre kerül. Az érintett útszakaszokon lévő műtárgyak, átereszek, forgalomtechnikai berendezések szükség szerint felújításra kerülnek. Felújítással érintett szakaszok: - 3834 j. ök út (35+000-39+000 kmsz) beavatkozási hossz: 4,000 km közvetve érintett település: Dombrád - 3839 j. ök út (0+000-1+522 kmsz) beavatkozási hossz: 1,522 km közvetve érintett település: Döge - 3827 j. ök út (0+500-12+170 kmsz) beavatkozási hossz: 11,670 km közvetve érintett település: Nyírbogdány, Demecser - 3832 j. ök út (4+870-7+570 kmsz) beavatkozási hossz: 0,970 km közvetve érintett település: Döge - 4924 j. ök út (1+300-3+300 kmsz) beavatkozási hossz: 2,000 km közvetve érintett település: Ura A projekt 4-5 számjegyű leromlott állapotú utak felújítását, fejlesztését célozza meg, melynek megvalósulása esetén javul a települések és a térségben lévő munkahelyek elérhetősége, ezzel a munkaerő mobilitást és gazdaságfejlesztést ösztönzi. A beruházások az állami úthálózaton valósulnak meg. Az érintett ingatlanok és tulajdonviszonyai ténylegesen csak a tervezés folyamán határozhatóak meg. A projekt a közúti közlekedésről szóló 1988. I. tv. 8. § (1a) bekezdésével összhangban kerül(t) tervezésre valamennyi érintett közlekedő igényeinek a figyelembevételével. A lakott területen belüli útszakaszok esetében a kerékpáros forgalom biztonságos levezetésének lehetősége megvizsgálásra kerül(t). A beruházás hozzájárul a közlekedésbiztonság javításához, a tervezés és megvalósítás során a közlekedésbiztonsági szempontok kiemelt figyelmet kapnak illetve fognak kapni. A felújításra kerülő útszakaszok listája a megyei önkormányzattal egyeztetésre, jóváhagyatásra került. A Pályázó szervezeti formájából, továbbá szakértői és intézményi hátteréből adódóan, a projekt pénzügyi fenntarthatósága, illetve a megvalósított tevékenység hosszú távú (5 éves) működtetése és fenntartása biztosított. A projekt műszaki tartalma úgy kerül kialakításra, megtervezésre, hogy javítson a gyalogosok, kerékpárosok, de mindenekelőtt a gyerekek, idősek és fogyatékkal élők közlekedésbiztonságán. A beruházás költséghatékony módon, reális és takarékos költségvetéssel került megtervezésre, illetve kerül megvalósításra. A beruházás közvetlen vagy közvetett gazdaságfejlesztési és foglalkoztatási kapcsolódással valósul meg, valamint elősegíti a munkaerő mobilitás infrastrukturális feltételeit. A felújítandó útszakaszok 5 db települést érintenek. A felhívás 3.4.1.1/7. pontjában rögzítettek alapján, a releváns útszakaszokra vonatkozóan közúti biztonsági audit fog elvégzésre kerülni, amely ajánlásai és megállapításai a tervek elkészítésekor figyelembevételre fognak kerülni. A projektnek előrelátható klímakockázata nincs. Amennyiben (a projekt előkészítés szakaszában, elkészülő) az építési tervek, buszöblök építését irányozzák elő, a vonatkozó szándéknyilatkozat benyújtásra fog kerülni. Amennyiben (a projekt előkészítés szakaszában, elkészülő) az építési tervek, parkolóhelyek építését felújítását irányozzák elő az elektromos járművek használatához szükséges alapvető töltő-infrastruktúra kiépítésének lehetősége a felhívás 3.4.1.1/15. pontja alapján megvizsgálásra fog kerülni. A tervezésekor figyelembevételre fognak kerülni az egyetemes tervezés elvei, azaz a nők és férfiak igényei, az idősek, a fogyatékosok és a gyermekek igényei. TS szemp.: 1.1 A beruházás a Szabolcs-Szatmár-Bereg Megyei Területfejlesztési programba, illetve az alábbi prioritásokhoz, célkitűzésekhez illeszkedik (4 db) : 1. prioritási tengely; 2. prioritási tengely; 3. prioritási tengely; 4. prioritási tengely. 2.1 A projekt nem konzorciumi formában valósul meg. 3.1 A projekt 4-5 számjegyű leromlott állapotú összekötő utak felújítását, fejlesztését célozza meg, melynek megvalósulása esetén javul a települések és a térségben lévő munkahelyek elérhetősége, így a projekt elősegíti a munkaerő mobilitás növekedését. 3.2 A projektben az állami úthálózat egy részének felújítását kívánjuk megvalósítani. A Magyar Közút Nzrt. az úthálózat folyamatos, hazai finanszírozású fenntartása mellett, milliárdos nagyságrendű, szintén hazai forrású útfelújításokat kíván elvégezni Szabolcs-Szatmár-Bereg Megyében (SZSZB). TOP-1.3.1-15 konstrukcióban támogatást nyert, útfelújítási beruházások megvalósítása mellett ez idáig 7 db konzorciumi megállapodás került megkötésre SZSZB megyei települések önkormányzataival, melyek szintén komplex, állami úthálózatot érintő beruházásokat tartalmaznak. Mindezeket figyelembe véve kijelenthető, hogy az állami úthálózat fejlesztései szervesen összefüggenek, közvetve és közvetlenül kapcsolódnak, egymással szinergiában valósulnak meg. (Hungarian)
    0 references
    As part of the project, a section of the secondary road network will be refurbished for a total length of 20.162 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: — 3834 j. road (35+ 000-39+ 000 kms) intervention length: 4.000 km indirectly affected municipality: Dombrád — 3839 j. road (0+ 000-1+ 522 kms) intervention length: 1.522 km indirectly affected municipality: Döge — 3827 j. path (0+ 500-12+ 170 kms) intervention length: 11.670 km indirectly affected municipality: Nyírbogdány, Demecser — 3832 j. road (4+ 870-7+ 570 kms) intervention length: 0.970 km indirectly affected municipality: Döge — 4924 j. path (1+ 300-3+ 300 kms) intervention length: 2.000 km indirectly affected municipality: The project aims at the renovation and development of 4-5 digit roads, which will improve the availability of localities and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The road sections to be refurbished concern 5 settlements. As set out in point 3.4.1.1/7 of the call, a road safety audit will be carried out for the relevant road sections, the recommendations and findings of which will be taken into account when drawing up the plans. The project has no foreseeable climate risk. If construction plans and bus bays are foreseen (in the preparation phase of the project, completed), the relevant declaration of intent will be submitted. If the construction of the construction plans and parking spaces is planned (in the preparation phase of the project) the possibility of installing the basic charging infrastructure necessary for the use of electric vehicles will be examined on the basis of point 3.4.1.1/15 of the call. The principles of universal design, i.e. the needs of women and men, the needs of the elderly, the disabled and children, will be taken into account in its design. TS eyelashes: 1.1 The investment is in line with the Szabolcs-Szatmár-Bereg County Regional Development Programme and the following priorities and objectives (4 pcs): Priority axis 1; Priority axis 2; Priority axis 3; Priority axis 4. 2.1 The project does not take the form of a consortium. 3.1 The project aims at the renovation and development of 4-5 digit connecting roads, which, if implemented, will improve the availability of localities and jobs in the area, thus helping to increase labour mobility. 3.2 The project aims to renovate part of the public road network. In addition to the continuous domestically funded maintenance of the road network, Magyar Közút Nzrt. intends to carry out road renovations of the order of billions, also from domestic sources, in Szabolcs-Szatmár-Bereg County (SZSZB). In addition to the implementation of road renovation investments, seven consortium agreements have been concluded with the municipalities of SZSZB county municipalities, which also include complex investments in the state road network. Against this background, it can be concluded that the development of the public road network is intrinsically linked, directly and indirectly linked and implemented in synergy with each other. (English)
    9 February 2022
    0 references
    Dans le cadre du projet, une section du réseau routier secondaire sera rénovée pour une longueur totale de 20,162 km. Au cours de l’intervention, le broyage de profilés du boîtier existant est effectué, et le nouveau boîtier est formé par l’installation d’une couche de fixation et d’usure. Le drainage est assuré par la remise en état du système de drainage existant et en le plaçant dans un bon bras, et le banc de route est également disposé. Les œuvres d’art, les équipements de pénétration et de circulation sur les tronçons routiers concernés seront remis à neuf si nécessaire. Sections rénovées: — 3834 j. route (35+ 000-39+ 000 kms) longueur d’intervention: 4,000 km municipalité indirectement touchée: Dombrád — 3839 j. route (0+ 000-1+ 522 kms) longueur d’intervention: 1,522 km municipalité indirectement touchée: Döge — 3827 j. chemin (0+ 500-12+ 170 kms) longueur d’intervention: 11,670 km municipalité indirectement touchée: Nyírbogdány, Demecser — 3832 j. route (4+ 870-7+ 570 kms) longueur d’intervention: 0,970 km municipalité indirectement touchée: Döge — 4924 j. chemin (1+ 300-3+ 300 kms) longueur d’intervention: 2,000 km municipalité indirectement touchée: Le projet vise la rénovation et le développement de routes à 4 à 5 chiffres, ce qui améliorera la disponibilité des localités et des emplois dans la région, encourageant ainsi la mobilité de la main-d’œuvre et le développement économique. Les investissements sont réalisés sur le réseau routier public. En fait, les propriétés concernées et leur propriété ne peuvent être déterminées qu’au cours du processus de planification. Le projet concerne le transport routier en 1988. I. TV. Est planifiée conformément à la section 8, paragraphe 1 bis, en tenant compte des besoins de tous les opérateurs concernés. Dans le cas des tronçons routiers à l’intérieur d’une zone résidentielle, la possibilité de conduire en toute sécurité la circulation cycliste sera examinée. L’investissement contribue à l’amélioration de la sécurité routière et les aspects liés à la sécurité routière feront l’objet d’une attention particulière dans le processus de planification et de mise en œuvre. La liste des tronçons routiers à remettre en état a été convenue et approuvée avec le gouvernement du comté. En raison de l’organisation de la requérante et de ses connaissances spécialisées et institutionnelles, la viabilité financière du projet ainsi que l’exploitation et la maintenance à long terme (5 ans) de l’activité mise en œuvre sont assurées. Le contenu technique du projet sera conçu et conçu pour améliorer la sécurité des piétons, des cyclistes et, surtout, des enfants, des personnes âgées et des personnes handicapées. L’investissement est planifié et mis en œuvre de manière rentable, avec un budget réaliste et économique. L’investissement est réalisé par le biais d’un lien direct ou indirect avec le développement économique et l’emploi et facilite les conditions d’infrastructure pour la mobilité de la main-d’œuvre. Les tronçons routiers à remettre en état concernent 5 colonies. Comme indiqué au point 3.4.1.1/7 de l’appel, un audit de la sécurité routière sera réalisé pour les tronçons routiers concernés, dont les recommandations et conclusions seront prises en compte lors de l’élaboration des plans. Le projet ne présente aucun risque climatique prévisible. Si les plans de construction et les quais d’autobus sont prévus (dans la phase de préparation du projet, achevé), la déclaration d’intention correspondante sera soumise. Si la construction des plans de construction et des places de stationnement est prévue (dans la phase de préparation du projet), la possibilité d’installer l’infrastructure de recharge de base nécessaire à l’utilisation des véhicules électriques sera examinée sur la base du point 3.4.1.1/15 de l’appel. Les principes de conception universelle, c’est-à-dire les besoins des femmes et des hommes, les besoins des personnes âgées, des handicapés et des enfants, seront pris en compte dans sa conception. Cils TS: 1.1 L’investissement est conforme au programme de développement régional du comté de Szabolcs-Szatmár-Bereg et aux priorités et objectifs suivants (4 pièces): Axe prioritaire no 1; Axe prioritaire no 2; Axe prioritaire no 3; Axe prioritaire 4. 2.1 Le projet ne prend pas la forme d’un consortium. 3.1 Le projet vise la rénovation et le développement de routes de raccordement à 4 à 5 chiffres qui, s’ils sont mis en œuvre, amélioreront la disponibilité des localités et des emplois dans la région, contribuant ainsi à accroître la mobilité de la main-d’œuvre. 3.2 Le projet vise à rénover une partie du réseau routier public. En plus de l’entretien continu financé par le pays du réseau routier, Magyar Közút Nzrt. a l’intention d’effectuer des rénovations routières de l’ordre de milliards, même à partir de sources domestiques, dans le comté de Szabolcs-Szatmár-Bereg (SZSZB). Outre la mise en œuvre d’investissements dans la rénovation des routes, sept accords de conso... (French)
    10 February 2022
    0 references
    Nyírbogdány, Szabolcs-Szatmár-Bereg
    0 references

    Identifiers

    TOP-1.3.1-16-SB1-2017-00001