Energy modernisation of Convoycity Restaurant Salon (Q3924983)

From EU Knowledge Graph
Revision as of 21:44, 14 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q3924983 in Hungary
Language Label Description Also known as
English
Energy modernisation of Convoycity Restaurant Salon
Project Q3924983 in Hungary

    Statements

    0 references
    9 March 2020
    0 references
    1 December 2021
    0 references
    GASTROCONVOY Kereskedelmi és Vendéglátó Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°9'49.90"N, 20°17'33.11"E
    0 references
    Az épület jelenleg nem rendelkezik homlokzati hőszigeteléssel. A projekt során a homlokzatok szigetelve lesznek 16 cm grafitos EPS hőszigetelő lemezzel, a lábazat pedig 14 cm formahabosított hőszigetelést kap. A meglévő nyílászárók rossz állapotúak, fa illetve fém nyílászárók, hőtechnikailag nem megfelelőek. A tervezett felújítás keretében ezek cseréjére sor kerül. Háromrétegű üvegezésű, argongáz töltésű, LOW-E bevonatos, PVC keretszerkezetű, melegperemes nyílászárók lesznek beépítve. A nyílászárók cseréje után 3 cm káva hőszigetelés készül. Az összekötő folyosó feletti födém alacsonyabb szinten van, mint a másik két épületrészé. A tető víz- és hőszigetelésének szempontjából ez nem kedvező. A korszerűsítési munkálatok során ez a födém teljesen ki lesz cserélve. Az épület 3 részének a tetősíkja egy szintbe lesz hozva, a vízelvezetési irányok részbeni megtartásával a homlokzati falak felé való lejtéssel. Az egy síkba hozott tetők egyenes rétegrendben 20 cm grafitos EPS hőszigetelést kapnak. Fűtési rendszer és a használati-melegvíz előállító rendszer is korszerűsítésre kerül, melyről részletes leírás a gépészeti műszaki leírásban található. Az épületen 29 kWp-nyi napelem kerül elhelyezésre, melyről részletes leírás a napelemes ajánlatban található. (Hungarian)
    0 references
    The building is currently not equipped with facade thermal insulation. During the project, the facades will be insulated with 16 cm graphite EPS thermal insulation plate, and the plinth will receive 14 cm foamed thermal insulation. Existing doors and windows are in poor condition, wood or metal windows, not thermally suitable. They will be replaced as part of the planned renovation. Three-layer glazed, argon-gas-charged, LOW-E coated, PVC framed, hot flange doors and windows will be installed. After replacement of doors and windows, 3 cm of thermal insulation is made. The floor above the connecting corridor is lower than that of the other two parts of the building. This is not favourable in terms of water and thermal insulation of the roof. During the modernisation works, this slab will be completely replaced. The roof plane of the 3 parts of the building will be brought to the same level by partly maintaining the drainage directions by descending towards the facade walls. The roofs in a single plane are provided with 20 cm of graphite EPS thermal insulation in a straight layer. The heating system and the domestic hot water production system will also be upgraded, which is described in detail in the mechanical engineering specifications. 29 kWp of solar panels are installed on the building, which is described in detail in the solar panel offer. (English)
    8 February 2022
    0 references
    Le bâtiment n’est actuellement pas équipé d’une isolation thermique de façade. Pendant le projet, les façades seront isolées avec une plaque d’isolation thermique EPS en graphite de 16 cm, et le socle recevra une isolation thermique mousseuse de 14 cm. Les portes et fenêtres existantes sont en mauvais état, les fenêtres en bois ou en métal, qui ne conviennent pas thermiquement. Ils seront remplacés dans le cadre de la rénovation prévue. Trois couches vitrées, à gaz d’argon, revêtues de LOW-E, encadrées en PVC, portes et fenêtres à bride chaude seront installées. Après le remplacement des portes et des fenêtres, 3 cm d’isolation thermique est faite. Le plancher au-dessus du couloir de raccordement est inférieur à celui des deux autres parties du bâtiment. Cela n’est pas favorable en termes d’eau et d’isolation thermique du toit. Lors des travaux de modernisation, cette dalle sera complètement remplacée. Le plan de toit des 3 parties du bâtiment sera ramené au même niveau en maintenant en partie les directions de drainage en descendant vers les murs de façade. Les toits d’un seul plan sont pourvus de 20 cm d’isolation thermique en graphite EPS en couche droite. Le système de chauffage et le système de production d’eau chaude domestique seront également modernisés, ce qui est décrit en détail dans les spécifications de génie mécanique. 29 kWp de panneaux solaires sont installés sur le bâtiment, ce qui est décrit en détail dans l’offre de panneaux solaires. (French)
    10 February 2022
    0 references
    Szajol, Jász-Nagykun-Szolnok