Complex energy development at Papp and Társa Lakatos Kft. (Q3934645)

From EU Knowledge Graph
Revision as of 11:23, 13 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q3934645 in Hungary
Language Label Description Also known as
English
Complex energy development at Papp and Társa Lakatos Kft.
Project Q3934645 in Hungary

    Statements

    0 references
    1 July 2020
    0 references
    30 June 2022
    0 references
    Papp és Társa Lakatos Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°54'29.09"N, 19°41'34.12"E
    0 references
    A projekt előkészítése során az alábbi tevékenységek valósultak meg: - Elkészítésre kerültek az épületekre vonatkozóan az energetikai tanúsítványok és számítások. A dokumentumok épületenként bemutatják a jelenlegi, a köztes és a tervezett állapotot. A tanúsítványt a Magyar Mérnöki Kamara névjegyzékében szereplő TÉ jogosultsággal rendelkező szakértő állította ki. (Költsége nem kerül elszámolásra.) - Összeállításra került a tervdokumentáció, illetve a műszaki leírás, mely tartalmazza a beruházás során megvalósuló fejlesztést. (Költsége nem kerül elszámolásra.) - Megfelelő jogosultsággal rendelkező szakértő személy által kiállításra kerül a statikai vélemény, mely szerint nem rendelkezik állékonysági problémákkal az épület, illetve a tartószerkezet megfelelősége került megállapításra. (Költsége nem kerül elszámolásra.) - A pályázati mellékletek és a pályázati dokumentáció összeállításra került. A projekt megvalósításának legfőbb lépései közé tartozik, hogy a tervezett, nem engedélyköteles kiviteli munkák a megfelelő minőségben elkészüljenek, a létesítmény folyamatos, szakaszos üzemének biztosítása mellett, továbbá a műszaki ellenőri szolgáltatás teljesítésre kerüljön, valamint a kötelezően előírt nyilvánosság biztosítva legyen. A kivitelezés során az alábbi tevékenységek valósulnak meg: - Külső határoló szerkezetek hőszigetelése (falakon 16 cm, padlástéren és lapostetőn 25 cm vastagságban); - Külső nyílászárók cseréje korszerű, hőszigetelt ablakokra, ajtókra, szekcionált ipari kapukra (3 rétegű, hőszigetelő üvegezés és min. 6 légkamrás tokszerkezet); - Gépészeti korszerűsítés – új kazánrendszer telepítése az irodaépületben, valamint meglévő HMV és szekunder fűtési rendszer energetikai korszerűsítése mindkét épületben; - Napelemes rendszer telepítése (6,5 kW teljesítménnyel). A projekt megvalósításának zavartalan lebonyolítása érdekében a projektmenedzsment tevékenységekre külső szolgáltató kerül bevonásra, költsége nem kerül elszámolásra. A nyertes ajánlattevő részéről a megvalósításban Sepler Gábor mérnök-közgazdász személyesen fog közreműködni, aki rendelkezik a szükséges és megfelelő végzettséggel és szakmai tapasztalatokkal. Célterületeken megvalósuló projektelemek: - Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése; - Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje/energiamegtakarítást eredményező korszerűsítése; - Fűtési és HMV rendszer korszerűsítése; - Megújuló energiafelhasználás növelését célzó tevékenységek: napelemes rendszer telepítése. (Hungarian)
    0 references
    During the preparation of the project, the following activities were carried out: — Energy certificates and calculations for buildings have been prepared. The documents show the current, intermediate and planned status of each building. The certificate was issued by an expert in the register of the Hungarian Chamber of Engineers. (The cost is not accounted for.) — the design documentation and the technical specifications have been compiled, which includes the development carried out during the investment. (The cost is not declared.) — The static opinion is issued by a qualified expert, according to which there is no stability problems in the building or the conformity of the supporting structure. (Cost not declared) — Application annexes and tender documents have been compiled. One of the main steps in the implementation of the project is to ensure that the planned construction works that are not subject to authorisation are completed in the appropriate quality, while ensuring the continuous intermittent operation of the facility, and that the technical inspection service is carried out and that the mandatory publicity is ensured. The following activities will be carried out: — Thermal insulation of external boundaries (16 cm on walls and 25 cm on attic and flat roof); — Replacement of external doors and windows for modern, insulated windows, doors, sectional industrial gates (3-layer, thermal insulating glazing and minimum 6 air chamber enclosures); — Mechanical modernisation — installation of a new boiler system in the office building and energy upgrading of existing HMV and secondary heating systems in both buildings; — Installation of a solar system (with a power of 6.5 kW). In order to ensure the smooth implementation of the project, an external service provider is involved in project management activities and its cost is not accounted for. The successful tenderer will be personally involved in the implementation by Gábor Sepler, an engineer and economist, who has the necessary and appropriate qualifications and professional experience. Project elements in target areas: — Thermal insulation of building envelopes other than doors and windows separating heated and unheated spaces; — Replacement of building envelopes considered as doors and windows separating heated and unheated spaces/upgrading resulting in energy savings; — Modernisation of heating and HMV system; — Activities to increase the use of renewable energy: installation of solar system. (English)
    8 February 2022
    0 references
    Au cours de la préparation du projet, les activités suivantes ont été menées: — Des certificats énergétiques et des calculs pour les bâtiments ont été préparés. Les documents indiquent l’état actuel, intermédiaire et planifié de chaque bâtiment. Le certificat a été délivré par un expert au registre de la Chambre des ingénieurs hongrois. (Le coût n’est pas comptabilisé.) — la documentation de conception et les spécifications techniques ont été compilées, ce qui inclut le développement réalisé au cours de l’investissement. (Le coût n’est pas déclaré.) — L’avis statique est émis par un expert qualifié, selon lequel il n’y a pas de problèmes de stabilité dans le bâtiment ou la conformité de la structure de support. (Coût non déclaré) — Des annexes de la demande et des documents d’appel d’offres ont été compilés. L’une des principales étapes de la mise en œuvre du projet consiste à faire en sorte que les travaux de construction prévus qui ne sont pas soumis à autorisation soient réalisés dans la qualité appropriée, tout en assurant l’exploitation intermittente continue de l’installation, que le service d’inspection technique soit réalisé et que la publicité obligatoire soit assurée. Les activités suivantes seront menées: — Isolation thermique des limites extérieures (16 cm sur les murs et 25 cm sur le toit grenier et plat); — Remplacement des portes et fenêtres extérieures pour les fenêtres, les portes et les portes industrielles modernes et isolées (à 3 couches, vitrages isolants thermiques et au minimum 6 boîtiers de chambre à air); — Modernisation mécanique — installation d’un nouveau système de chaudières dans le bâtiment de bureaux et mise à niveau énergétique des systèmes de chauffage HMV existants et secondaires dans les deux bâtiments; — Installation d’un système solaire (d’une puissance de 6,5 kW). Afin d’assurer la bonne mise en œuvre du projet, un prestataire de services externe est impliqué dans les activités de gestion de projet et son coût n’est pas pris en compte. L’attributaire sera personnellement associé à la mise en œuvre par Gábor Sepler, ingénieur et économiste, qui possède les qualifications et l’expérience professionnelle nécessaires et appropriées. Éléments du projet dans les domaines cibles: — Isolation thermique des enveloppes de bâtiments autres que les portes et les fenêtres séparant les espaces chauffés et non chauffés; — Remplacement des enveloppes des bâtiments considérées comme des portes et des fenêtres séparant les espaces chauffés et non chauffés/mise à niveau, ce qui entraîne des économies d’énergie; — Modernisation du système de chauffage et du système HMV; — Activités visant à accroître l’utilisation des énergies renouvelables: installation du système solaire. (French)
    10 February 2022
    0 references
    Kecskemét, Bács-Kiskun
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01410
    0 references