Development of prototype KFM06 automatic duvet filling target machine that meets modern market requirements _x000D_ _x000D_ (Q3929513)

From EU Knowledge Graph
Revision as of 05:35, 13 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3929513 in Hungary
Language Label Description Also known as
English
Development of prototype KFM06 automatic duvet filling target machine that meets modern market requirements _x000D_ _x000D_
Project Q3929513 in Hungary

    Statements

    0 references
    49,455,146.0 forint
    0 references
    139,809.7 Euro
    0.002827 Euro
    13 February 2022
    0 references
    80,010,646.0 forint
    0 references
    226,190.1 Euro
    0.002827 Euro
    13 February 2022
    0 references
    61.81 percent
    0 references
    1 June 2017
    0 references
    31 March 2018
    0 references
    CSF-ELECTRIC Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°12'54.14"N, 20°28'30.36"E
    0 references
    A) Támogatási kérelem szakmai tartalmának összefoglaló bemutatása. A projekt célja egy olyan célgép prototípusának kifejlesztése amely versenyképességi szempontból a lehető legjobban kielégíti a modern, globalizált piac igényeit. A célgép fejlesztése során számos, műszaki szempontból még nem megfelelően megoldott kérdést kell megválaszolni. A paplantöltés technológiai folyamata során jelentkező technikai kihívások röviden a következők szerint foglalhatók össze: - A töltőanyagként használható pihe vagy toll zökkenőmentes szállítása a berendezés egyes egységein keresztül a tárolótól a paplanig; - A töltőanyagtömeg gyors és pontos mérésének megvalósítása; - A célgép ciklusidejének minimalizálása; - A berendezés aktuátorai által gerjesztett mechanikus és elektromos zaj alacsony szinten tartása; - A célgép megbízható, hibamentes és folyamatos működésének biztosítása; - A berendezés mai modern Industry 4.0 szempontoknak való megfeleltetése. B) A megvalósítandó tevékenységek részletes bemutatása. 1. Projekt tervezés, előkészítés: Emberi erőforrások elosztása, feladatok és fontosabb mérföldkövek meghatározása. Kutatáshoz, fejlesztéshez szükséges szoftverek és eszközök beszerzése. Elektromos, gépész tervező szoftverek vásárlása. A pont befejezésének eredményeként előállnak a feltételek a projekt megkezdéséhez. Időtartam: 0,5 hónap. 2. Megfelelő válaszok kutatása a felmerült műszaki problémákra, az KFM06 típusú paplantöltő gép gépészeti, villamos és vezérléstechnikai tervezése. A megoldandó problémák az alábbiak: - a toll vagy pihe mint anyagáram matematikai modelljének megalkotása; - a modell alapján az egyenletes eloszlású anyagáram biztosítása; - a modell alapján a mérőedény kialakításának áramlástani tökéletesítése; - a mérőedény és a felépítmény dinamikájának optimalizálása a betöltendő toll vagy pihe tömegének megfelelő pontosságú mérésé érdekében. A kívánt mérési tartomány 5g-tól 100g mérésenként, az elvárt pontosság pedig +/-1g; - adaptív, öntanuló mérési algoritmus kifejlesztése amely képes alkalmazkodni a több paraméterében is változható bemérendő anyaghoz (toll vagy pihe); - megfelelő módszerek kifejlesztése az antisztatikus feltöltődés elkerülésére; - a gyártástechnológia egyszerűsítése költségének csökkentése. Az alábbi egységek gépészeti és elektromos terveinek kidolgozása: - Anyag beadagoló rendszer; - Mérleg rendszer; - Befújó rendszer; - Automata paplantovábbító rendszer; - Industry 4.0 rendszer. Időtartam: 6 hónap 3. Az elkészült tervek alapján a KFM06 prototípusához szükséges elemek beszerzése: - Árajánlatok kérése; - Elemek megrendelése a projekt határidők figyelembe vételével. Időtartam: 1 hónap 4. A KFM06 papalantöltő prototípusának elkészítése - Az elkészült gépészeti és villamos tervek alapján a szükséges alkatrészek legyártása; - Az elkészült alkatrészek, illetve részegységek összeszerelése; - Gyártási próbák; - A gyártási próbák eredményeinek figyelembe vételével az újonnan felmerülő műszaki problémák megoldása, szükséges módosítások kivitelezése. Időtartam: 2,5 hónap 5. A termék piacra vezetése. - Munka biztonságtechnikai felülvizsgálat, minősítések elkészítése; - Géphez információs anyagok elkészítése; - Gép piacra vezetéséhez szükséges marketing anyagok elkészítése; - Gép reklámozásához weboldal készítése; - Bemutató videók, prezentációk előállítása. Időtartam: 1 hónap C) A létrejövő eredmények bemutatása. A projektjavaslat milyen új, üzletileg hasznosítható termékek, szolgáltatások, eljárások prototípus fejlesztését célozza. A projekt keretében megvalósítandó célgép prototípusának az alábbi fő részegységekből kell állnia: - Toll vagy pihe beadagoló rendszer - Bemérő rendszer; - Befújó rendszer; - Automata paplantovábbító rendszer; - Industry 4.0 rendszer Toll vagy pihe beadagoló rendszer: Az egység feladata a toll vagy pihe betárolása, annak szétválasztása a minél inkább egyenletes anyagáramlás biztosítása céljából. Az anyag egy pneumatikus szállító berendezés segítségével kerülne a tároló silóba. A siló felső része pneumatikus működtetésű csappantyúkkal le tudná zárni a tartály felső részét, ahova a toll vagy pihe kerül, ezáltal az adagoló rendszer kiadagolása folyamatos lehetne a siló feltöltésének folyamata alatt is. A siló alján kialakításra kerülő részből történne az anyag szállítása a mérlegelt tartályokba pneumatikus szállítással. A tartályban keverőmű és lazítóvillák biztosítanák, hogy a toll vagy pihe szétválasztódjon, és az alsó kiadagoló részben kvázi egyenletes eloszlású legyen az anyagáram. A tartály felső részéből egy toló lap juttathatná az anyagot a kiadagoló részbe. A kiadagolóban állandó anyag mennyiség biztosítását ultrahangos érzékelő segítségével oldanánk meg. Ennek ideális beállítása függ a toll vagy pihe fajtájától, minőségétől és méretétől, ezért az adagoló és az alsó keverőmű fordulatszám szabályozását is meg kell oldani. A beállítandó paramétereket egy gyártási recept alapján állítanánk be. A kiadagoló részből a toll vagy pihe megfelel (Hungarian)
    0 references
    A) Presentation of a summary of the technical content of the grant application. The aim of the project is to develop a prototype of a target machine that best meets the needs of a modern, globalised market from a competitive point of view. During the development of the target machine, a number of questions that have not yet been properly solved from a technical point of view need to be answered. The technical challenges in the process of filling duvets can be briefly summarised as follows: — Smooth transport of filler flakes or feathers through individual units of equipment from storage to duvet; — To achieve rapid and accurate measurement of the fill weight; — Minimising the cycle time of the target machine; — Keeping the mechanical and electrical noise generated by the actuators of the equipment to a low level; — Ensuring the reliable, fault-free and continuous operation of the target machine; — Adapting the equipment to modern Industry 4.0 criteria. A detailed description of the activities to be carried out. 1. Project planning and preparation: Allocation of human resources, definition of tasks and major milestones. Acquisition of software and tools for research and development. Purchase of electrical, engineering design software. The completion of the point will result in the conditions for starting the project. Duration: 0.5 months. 2. Researching appropriate answers to the technical problems encountered, designing the KFM06 type duvet filling machine for mechanical, electrical and control technology. The problems to be addressed are: — the creation of a mathematical model for feathers or fluff as material streams; — to ensure a uniform distribution of material flow according to the model; — flow improvement of the measurement vessel design based on the model; — optimising the dynamics of the weighing vessel and bodywork to ensure that the weight of the feathers or flakes to be filled is accurate. The required measuring range is from 5 g to 100 g per measurement and the required accuracy is ± 1 g; — development of an adaptive self-learning measurement algorithm capable of adapting to the material to be measured in several parameters (pens or flakes); — develop appropriate methods to avoid antistatic charging; — reduce the cost of simplifying production technology. Development of mechanical and electrical designs for the following units: — Material dosing system; — Balance sheet system; — Inflate system; — Automatic duvet conveyor system; — Industry 4.0 system. Duration: 6 months 3. On the basis of the completed plans, the acquisition of the necessary elements for the prototype of KFM06: — Request quotations; — Ordering elements taking into account project deadlines. Duration: 1 month 4. Preparation of the prototype of the KFM06 papalan filler — Manufacturing of the necessary parts based on the completed mechanical and electrical designs; — Assembly of completed components or assemblies; — Manufacturing tests; — In the light of the results of the manufacturing tests, solve new technical problems and make necessary modifications. Duration: 2.5 months 5. Placing the product on the market. — Technical review of work, preparation of qualifications; — Preparation of information material for machinery; — Preparation of marketing materials for placing machinery on the market; — Creating a website for advertising machinery; — Production of video presentations and presentations. Duration: 1 month C) Presentation of the resulting results. The project proposal aims to develop a prototype of new, commercially usable products, services and processes. The prototype of the target machine to be implemented under the project shall consist of the following main components: — Pen or leaf dosing system — Measuring system; — Inflate system; — Automatic duvet conveyor system; — Industry 4.0 System Pen or Leaf Feeding System: The function of the unit is to store the feathers or flakes and separate them in order to ensure a uniform flow of material as possible. The material is transferred to the storage silo using a pneumatic transport device. The upper part of the silo could close the upper part of the container with pneumatically operated dampers, where the feather or leaf is placed, so that the dosing system can be dispensed continuously during the silos filling process. The material would be transported from the bottom of the silo to the weighed containers by pneumatic transport. The mixing unit and loosening forks in the container would ensure that the feathers or flakes are separated and that the material flow is quasi evenly distributed in the lower dispensing part. A sliding sheet of the upper part of the container could transfer the material to the dispensing area. The supply of constant material in the dispenser would be solved by means of an ultrasonic sensor. The ideal adjustment of this depends on the type, quality and size of the pen or feather, so the speed control of the feeder and the lower mix... (English)
    8 February 2022
    0 references
    A) Présentation d’un résumé du contenu technique de la demande de subvention. L’objectif du projet est de développer un prototype de machine cible qui répond le mieux aux besoins d’un marché moderne et mondialisé d’un point de vue concurrentiel. Lors du développement de la machine cible, il convient de répondre à un certain nombre de questions qui n’ont pas encore été résolues d’un point de vue technique. Les défis techniques dans le processus de remplissage des couettes peuvent être résumés comme suit: — Transport sans heurts de flocons de remplissage ou de plumes à travers des unités individuelles d’équipement, de l’entreposage à la couette; — Pour obtenir une mesure rapide et précise du poids de remplissage; — Minimiser le temps de cycle de la machine cible; — Maintenir le bruit mécanique et électrique généré par les actionneurs de l’équipement à un niveau bas; — Assurer le fonctionnement fiable, sans défaut et continu de la machine cible; — Adaptation de l’équipement aux critères modernes de l’industrie 4.0. Une description détaillée des activités à mener. 1. Planification et préparation du projet: Répartition des ressources humaines, définition des tâches et jalons majeurs. Acquisition de logiciels et d’outils pour la recherche et le développement. Achat de logiciels de conception électrique et technique. L’achèvement du point entraînera les conditions de démarrage du projet. Durée: 0,5 mois. 2. Recherche de réponses appropriées aux problèmes techniques rencontrés, conception de la machine de remplissage de couettes de type KFM06 pour les technologies mécaniques, électriques et de contrôle. Les problèmes à résoudre sont les suivants: — la création d’un modèle mathématique pour les plumes ou les peluches en tant que flux de matériaux; — assurer une répartition uniforme du flux de matières selon le modèle; — amélioration du débit de la conception du récipient de mesure sur la base du modèle; — optimiser la dynamique du récipient de pesage et de la carrosserie pour s’assurer que le poids des plumes ou des flocons à remplir est précis. La plage de mesure requise est comprise entre 5 g et 100 g par mesure et la précision requise est de ± 1 g; — développement d’un algorithme adaptatif de mesure d’auto-apprentissage capable de s’adapter au matériel à mesurer en plusieurs paramètres (pens ou flocons); — développer des méthodes appropriées pour éviter la charge antistatique; — réduire le coût de la simplification de la technologie de production. Développement de conceptions mécaniques et électriques pour les unités suivantes: — Système de dosage des matériaux; — Système de bilan; — Gonfler le système; — Système de convoyeur de couette automatique; — Système de l’industrie 4.0. Durée: 6 mois 3. Sur la base des plans achevés, l’acquisition des éléments nécessaires au prototype de KFM06: — Demander des devis; — Commander des éléments en tenant compte des délais du projet. Durée: 1 mois 4. Préparation du prototype de remplissage papalan KFM06 — Fabrication des pièces nécessaires sur la base des conceptions mécaniques et électriques achevées; — Assemblage d’éléments ou d’assemblages terminés; — Essais de fabrication; — À la lumière des résultats des essais de fabrication, résoudre de nouveaux problèmes techniques et apporter les modifications nécessaires. Durée: 2,5 mois 5. Mise sur le marché du produit. — Examen technique du travail, préparation des qualifications; — Préparation de matériel d’information pour les machines; — Préparation de matériels de commercialisation pour la mise sur le marché de machines; — Création d’un site web pour les machines publicitaires; — Production de présentations vidéo et de présentations. Durée: 1 mois C) Présentation des résultats obtenus. La proposition de projet vise à développer un prototype de nouveaux produits, services et procédés utilisables sur le plan commercial. Le prototype de la machine cible à mettre en œuvre dans le cadre du projet se compose des principaux éléments suivants: — Système de dosage du stylo ou des feuilles — Système de mesure; — Gonfler le système; — Système de convoyeur de couette automatique; — Système d’alimentation de stylo ou de feuille de l’industrie 4.0: La fonction de l’unité est de stocker les plumes ou les flocons et de les séparer afin d’assurer un flux de matière uniforme dans la mesure du possible. Le matériau est transféré au silo de stockage à l’aide d’un dispositif de transport pneumatique. La partie supérieure du silo pourrait fermer la partie supérieure du récipient avec des amortisseurs à commande pneumatique, où la plume ou la feuille est placée, de sorte que le système de dosage puisse être distribué en continu pendant le processus de remplissage des silos. Le matériau serait transporté du fond du silo jusqu’aux conteneurs pesés par transport pneumatique. L’unité de mélange et les fourchettes de desserrage dans le contenant garantiraient que les plumes ou les flocons sont séparés et que le flux de matière est presque ... (French)
    10 February 2022
    0 references
    Makó, Csongrád-Csanád
    0 references

    Identifiers

    GINOP-2.1.7-15-2016-00048
    0 references