Completing the FEZABILITY STUDY for the rehabilitation of the bridge over the Borcea arm, located on Highway A2, at km 149+ 680 and Rehabilitation of the Cernavoda Bridge located on Highway A2, at 157+ 600 km and ELABORATION of the documentation SUPORT FOR FINANTING CERATION (Q3095657)

From EU Knowledge Graph
Revision as of 12:53, 15 December 2021 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 6,381.264 euro)
Jump to navigation Jump to search
Project Q3095657 in Romania
Language Label Description Also known as
English
Completing the FEZABILITY STUDY for the rehabilitation of the bridge over the Borcea arm, located on Highway A2, at km 149+ 680 and Rehabilitation of the Cernavoda Bridge located on Highway A2, at 157+ 600 km and ELABORATION of the documentation SUPORT FOR FINANTING CERATION
Project Q3095657 in Romania

    Statements

    0 references
    31,906.32 Romanian Leu
    0 references
    37,536.84 Romanian Leu
    0 references
    7,507.3679999999995 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    1 September 2018
    0 references
    31 December 2022
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    0 references

    44°24'46.44"N, 26°11'1.21"E
    0 references
    Asigurarea de capacitatea de circulatie necesara si conditii corespuzatoare de circulatiei aferente retelei rutiere TEN-T CORE cu efecte negative minime la nivelul mediului si ale ocuparii de terenuri. Imbunatatirea conditiilor de circulatie la nivel de retea rutiera nationala de transport inclusiv sub aspect de siguranta rutiera, reducerea emisiilor poluante, reducerea costurilor de operare, raspunzind astfel cerintelor de dezvoltarea economica concretizata prin adaptarea retelei rutiere nationale la cererea reala de transport. Obiectivul general al proiectului, ca parte din reteaua TEN-T CORE, este imbunatatirea competitivitatii economice a României prin dezvoltarea infrastructurii de transport care faciliteaza integrarea economica in UE, contribuind astfel la dezvoltarea pietii interne cu scopul de a crea conditiile pentru cresterea volumului investitiilor, promovarea transportului durabil si a coeziunii in reteaua de drumuri europene. Realizarea prezentului proiect Completarea Studiului de Fezabilitate pentru Reabilitarea Podului peste bratul Borcea, situat pe Autostrada A2, la km 149+680 si Reabilitarea Podului de la Cernavoda situat pe Autostrada A2, la km 157+600 contribuie la indicatorul de rezultat 2S81 – Cerere de finanțare transmisă, spre analiză și aprobare la Organismul Independent pentru Evaluare. (Romanian)
    0 references
    Ensuring the necessary traffic capacity and corresponding traffic conditions related to the TEN-T CORE road network with minimal negative effects on the environment and land occupation. Improving the traffic conditions at the level of the national road transport network, including road safety, reducing pollutant emissions, reducing operating costs, thus meeting the requirements for economic development realised by adapting the national road network to the real demand for transport. The general objective of the project, as part of the TEN-T CORE network, is to improve Romania’s economic competitiveness by developing transport infrastructure that facilitates economic integration in the EU, thus contributing to the development of the internal market in order to create the conditions for increasing the volume of investments, promoting sustainable transport and cohesion in the European road network. The completion of the Feasibility Study for the Rehabilitation of the Bridge over the Borcea arm, located on Highway A2, at km 149+ 680 and the rehabilitation of the Cernavoda Bridge located on Highway A2, at 157+ 600 km contribute to the result indicator 2S81 – Application for funding submitted for analysis and approval to the Independent Body for Evaluation. (English)
    16 September 2021
    0 references
    Asigurarea de capacitatea de circulatie necesara si conditii corespuzatoare de circulatiei aferente retelei rutiere TEN-T CORE cu efecte négatif minime la nivelul mediului si ale ocuparii de terenuri. Imbunatatirea conditiilor de circulatie la nivel de retea rutiera nationala de transport inclusiv sous-aspect de siguranta rutiera, reducerea emisiilor poluante, reducerea costurilor de operare, raspunzind astfel cerintelor de dezvoltarea economica concretizata prin adaptarea retelei rutiere nationale la cererea reala de transport. Obiectivul general al proiectului, ca parte din RETEAUA TEN-T CORE, este imbunatatirea competitivitatii economice a României prin dezvoltarea Infrastructurii de transport care facilitateaza Integrarea economica in UE, contribuind astfel la dezvoltarea pietii interne cu Scopul de a crea conditiile pentru cresterea volumului Investitiilor, promovarea TRANSPORTULUI durabil si a coeziunii in RETEAUA de drumuri europene. Realizarea PREZENTULUI proiect completarea Studiului de Fezabilitate pentru Reabilitarea Podului peste bratul Borcea, situat pe Autostrada A2, la km 149+ 680 si Reabilitarea Podului de la Cernavoda situat pe Autostrada A2, la km 157+ 600 contribuie la indicatorul de rezultat 2S81 — Cerere de finanțare transmisă, spre analiză și Aprobare la Organismul Independent pentru Evaluare. (French)
    26 November 2021
    0 references
    Gewährleistung der erforderlichen Verkehrskapazität und der entsprechenden Verkehrsbedingungen im Zusammenhang mit dem TEN-V CORE-Straßennetz mit minimalen negativen Auswirkungen auf die Umwelt und die Landbesatzung. Verbesserung der Verkehrsbedingungen auf der Ebene des nationalen Straßenverkehrsnetzes, einschließlich der Straßenverkehrssicherheit, Verringerung der Schadstoffemissionen, Senkung der Betriebskosten, Erfüllung der Anforderungen an die wirtschaftliche Entwicklung durch Anpassung des nationalen Straßennetzes an die reale Verkehrsnachfrage. Das allgemeine Ziel des Projekts im Rahmen des TEN-V-CORE-Netzes besteht darin, die wirtschaftliche Wettbewerbsfähigkeit Rumäniens durch den Ausbau der Verkehrsinfrastruktur zu verbessern, die die wirtschaftliche Integration in der EU erleichtert und somit zur Entwicklung des Binnenmarkts beiträgt, um die Voraussetzungen für eine Erhöhung des Investitionsvolumens, die Förderung eines nachhaltigen Verkehrs und des Zusammenhalts im europäischen Straßennetz zu schaffen. Der Abschluss der Machbarkeitsstudie für die Sanierung der Brücke über den Borcea-Arm auf der Autobahn A2, km 149+ 680 und die Sanierung der Cernavoda-Brücke auf der Autobahn A2 auf 157+ 600 km tragen zum Ergebnisindikator 2S81 – Antrag auf Finanzierung bei der unabhängigen Stelle zur Bewertung bei. (German)
    1 December 2021
    0 references
    Zorgen voor de nodige verkeerscapaciteit en de bijbehorende verkeersomstandigheden in verband met het TEN-T CORE-wegennet, met minimale negatieve gevolgen voor het milieu en het grondgebruik. Verbetering van de verkeersomstandigheden op het niveau van het nationale wegennet, met inbegrip van de verkeersveiligheid, vermindering van de uitstoot van verontreinigende stoffen, verlaging van de exploitatiekosten, zodat wordt voldaan aan de vereisten voor economische ontwikkeling die worden gerealiseerd door het nationale wegennet aan te passen aan de reële vraag naar vervoer. De algemene doelstelling van het project, als onderdeel van het TEN-T CORE-netwerk, is het verbeteren van het economische concurrentievermogen van Roemenië door de ontwikkeling van vervoersinfrastructuur die de economische integratie in de EU vergemakkelijkt, en aldus bij te dragen tot de ontwikkeling van de interne markt, teneinde de voorwaarden te scheppen voor het vergroten van het investeringsvolume en het bevorderen van duurzaam vervoer en cohesie in het Europese wegennet. De voltooiing van de haalbaarheidsstudie voor de revalidatie van de brug over de Borcea-arm, gelegen aan snelweg A2, op km 149+ 680 en de rehabilitatie van de brug van Cernavoda op snelweg A2, op 157+ 600 km, dragen bij aan de resultaatindicator 2S81 — Aanvraag voor financiering die is ingediend voor analyse en goedkeuring bij het onafhankelijke evaluatieorgaan. (Dutch)
    5 December 2021
    0 references
    Municipiul Feteşti, Romania
    0 references
    Oraş Cernavoda, Romania
    0 references

    Identifiers

    120919