Project Q135184 in Poland
Language Label Description Also known as
English
Construction of a section of the G-class road from the intersection of ul. Polish Army from St. Downtown to the design of the Jarocin bypass junction.
Project Q135184 in Poland

    Statements

    0 references
    11,931,289.7 zloty
    0 references
    2,863,509.53 Euro
    13 January 2020
    0 references
    15,908,386.27 zloty
    0 references
    3,818,012.7 Euro
    13 January 2020
    0 references
    75.0 percent
    0 references
    5 October 2015
    0 references
    9 November 2018
    0 references
    GMINA JAROCIN
    0 references
    0 references
    Przedmiotem projektu jest budowa drogi gminnej klasy G od skrzyżowania ul. Wojska Polskiego z ul. Śródmiejską o dł. 1830,0 m (0+000 km –1+830 km) w tym 1779,0 m (0+000 km - 1+779 km) kwalifikowanego, o nośności 115kN/oś, z kategorią ruchu KR3, do „węzła Jarocin” w ciągu drogi ekspresowej S11. Na projekt składają się elementy robót: a) budowa drogi o dł. 1830,0 m i szer. 7,0 m (przy łukach i zjazdach do 12,0 m) o nawierzchni bitumicznej, w tym 1779,0 m kwalifikowanego; b) budowa chodników o łącznej dł. 1776,0 m i szer. (1,5 m do 3,5 m) z kostki betonowej; c) budowa dróg rowerowych (długość wspartej infrastruktury rowerowej) o łącznej dł. 1576,0 m i szer. (2,2 m do 2,5 m) o nawierzchni bitumicznej; d) budowa 2 rond (o śr. zew. 31,0 m i szer. pasa ruchu 5,5 m), 1 skrzyżowania zwykłego z drogą gminną; e) montaż balustrad ochronnych: typu U-11a o dł. 245,0 m; f) budowa odwodnienia: kanalizacji deszczowej o dł. 2040,18 m i przydrożnych rowów o dł. 801,0 m g) budowa kanału technologicznego o dł. 1665,0 m; h) budowa 12 przejść dla pieszych; i) budowa 4 zatok autobusowych o głębokości 3,0 m; j) budowa nowego oświetlenia ulicznego (60 punktów świetlnych); k) budowa 2 przepustów (obiektów infrastruktury drogowej) na rowach melioracyjnych przecinających budowaną drogę o łącznej dł. 42,6m oraz 3 przepustów pod zjazdami w ciągu rowów przydrożnych (nie ujęte we wskaźnikach produktu); l) ułożenie opaski drenarskiej (od ul. Glinki do włączenia w S11) o dł. 6.050,3 m; m) montaż 189 nowych znaków i tablic pionowych oraz 14 słupków przeszkodowych; n) budowa 1 muru oporowego o dł. 55,0 m jako zabezpieczenie skarpy nasypu drogi przy stawie; o) przebudowa infrastruktury kolidującej z inwestycją (sieć wodociągowa, kanalizacyjna, gazowa, oświetlenia drogowego; sieć elektroenergetyczna ENERGA, PKP Energetyka; sieć telekomunikacyjna ORANGE). (Polish)
    0 references
    The object of the project is the construction of a G-class road from the intersection of ul. Polish Army from St. Downtown by long. 1830.0 m (0 + 000 km – 1 + 830 km) of which 1779.0 m (0 + 000 km – 1+ 779 km) qualified, with a load capacity of 115kN/axis, with KR3 traffic category, to the “Jarocin node” within the S11 expressway. The project consists of elements of works: construction of the road by length. 1830.0 m and wide. 7,0 m (for arches and descents up to 12,0 m) with bituminous surface, including 1779,0 m qualified; the construction of pavements with a total length. 1776.0 m and wide. (1.5 m to 3,5 m) of concrete cube; the construction of bicycle roads (length of supported bicycle infrastructure) with a total length. 1576.0 m and wide. (2.2 m to 2,5 m) with bituminous surface; d) construction of 2 roundabouts (w. zw. 31.0 m and wide lane 5.5 m), 1 junction with municipal road; installation of protective balustrades: U-11a type by long. 245,0 m; construction of dehydration: rainwater Sewerage. 2040.18 m and road ditches long. 801.0 m g) construction of the technological canal by length. 1665,0 m; construction of 12 pedestrian crossings; construction of 4 bus bays with a depth of 3,0 m; construction of new street lighting (60 light points); construction of 2 culverts (road infrastructure facilities) on drainage ditches crossing the built road with a total length. 42,6 m and 3 culverts under exits within road ditches (not included in product indicators); L) installation of the drain band (from ul. Clays to be insulated in S11) 6050,3 m; m) mounting 189 new vertical signs and boards and 14 obstruction posts; construction of 1 resistance wall length. 55,0 m as a protection of the embankment of the road at the pond; O) Reconstruction of the infrastructure conflicting with the investment (water, sewage, gas, road lighting; electricity grid ENERGA, PKP Energetyka; telecommunication network ORANGE). (English)
    21 October 2020
    0 references
    L’objet du projet est la construction d’une route municipale de classe G à partir de l’intersection de ul. L’armée polonaise d’ul. Centre ville longue. 1 830,0 m (0+ 000 km-1 + 830 km) dont 1 779,0 m (0+ 000 km — 1 + 779 km) qualifiés, d’une capacité de charge de 115kN/essieu, avec catégorie de trafic KR3, jusqu’au nœud «Jarocin» à l’intérieur de l’autoroute S11. Le projet se compose d’éléments d’œuvres: a) la construction d’une longue route. 1 830,0 m et large. 7,0 m (avec des courbes et des descentes jusqu’à 12,0 m) avec une surface bitumineuse, dont 1 779,0 m qualifiés; B) construction de trottoirs de longueur totale. 1 776,0 m et large. (1,5 m à 3,5 m) de cubes de béton; C) la construction de routes cyclables (longueur de l’infrastructure cyclable soutenue) de longueur totale. 1 576,0 m et large. (2,2 m à 2,5 m) avec surface bitumineuse; D) construction de 2 tours (autour de 31,0 m et voie large 5,5 m), 1 jonction ordinaire avec route municipale; installation de balustrades de protection: type U-11a long. 245,0 m; construction du drainage: drainage de l’eau de pluie. 2 040,18 m et fossés longs en bord de route. 801,0 m g) construction d’un canal technologique de longueur. 1 665,0 m; h) la construction de 12 passages pour piétons; construction de 4 baies d’autobus d’une profondeur de 3,0 m; construction d’un nouvel éclairage public (60 points lumineux); K) la construction de 2 ponceaux (installations d’infrastructure routière) sur des fossés de drainage traversant la route construite avec une longueur totale. 42,6 m et 3 ponceaux de sortie dans des fossés routiers (non inclus dans les indicateurs de sortie); L) disposition de la bande de drainage (de l’ul. Argiles à inclure dans S11) 6 050,3 m; M) l’installation de 189 panneaux et panneaux verticaux neufs et de 14 poteaux d’obstacles; N) construction d’un mur de soutènement long. 55,0 m comme fixation de la pente du remblai routier à l’étang; O) la reconstruction des infrastructures en conflit avec l’investissement (approvisionnement en eau, égouts, gaz, éclairage routier; réseau électrique ENERGA, PKP Energetyka; réseau de télécommunications ORANGE). (French)
    2 December 2021
    0 references
    Gegenstand des Projekts ist der Bau einer Stadtstraße der G-Klasse vom Schnittpunkt ul. Polnische Armee aus ul. Das Stadtzentrum lang. 1 830,0 m (0+ 000 km-1 + 830 km) einschließlich 1 779,0 m (0+ 000 km – 1 + 779 km) qualifiziert, mit einer Tragfähigkeit von 115kN/Achs, mit KR3 Verkehrskategorie, zum „Jarocin-Knoten“ innerhalb der Schnellstraße S11. Das Projekt besteht aus Elementen der Arbeiten: a) Bau einer langen Straße. 1 830,0 m und breit. 7,0 m (mit Kurven und Abstiegen bis 12,0 m) mit bituminöser Oberfläche, einschließlich 1 779,0 m; B) Bau von Gehwegen der Gesamtlänge. 1 776,0 m und breit. (1,5 m bis 3,5 m) Betonwürfel; C) Bau von Fahrradstraßen (Länge der unterstützten Fahrradinfrastruktur) von Gesamtlänge. 1 576,0 m und breit. (2,2 m bis 2,5 m) mit bituminöser Oberfläche; D) Bau von 2 Runden (rund) 31,0 m und breite Spur 5,5 m), 1 gewöhnliche Kreuzung mit kommunaler Straße; Einbau von Schutzbalustraden: Typ U-11a lang. 245,0 m; Bau der Entwässerung: Regenwasserentwässerung. 2 040,18 m und Straßengräben lang. 801,0 m g) Bau eines technologischen Kanals der Länge. 1 665,0 m; h) Bau von 12 Fußgängerübergängen; Bau von 4 Busbuchten mit einer Tiefe von 3,0 m; Bau einer neuen Straßenbeleuchtung (60 Lichtpunkte); K) Bau von 2 Spulen (Straßeninfrastruktureinrichtungen) auf Entwässerungsgräben, die die gebaute Straße mit Gesamtlänge überqueren. 42,6 m und 3 Ausfahrten in Straßengräben (nicht in den Output-Indikatoren enthalten); L) Anordnung des Entwässerungsbandes (von ul. In S11) aufzunehmende Tone 6 050,3 m; m) Einbau von 189 neuen vertikalen Schildern und Brettern und 14 Hindernispfosten; N) Bau von 1 Haltewand lang. 55,0 m als Sicherung der Steigung des Straßendamms am Teich; O) Wiederaufbau der Infrastruktur, die mit den Investitionen in Konflikt steht (Wasserversorgung, Kanalisation, Gas, Straßenbeleuchtung; Stromnetz ENERGA, PKP Energetyka; Telekommunikationsnetz ORANGE). (German)
    13 December 2021
    0 references

    Identifiers

    RPWP.05.01.02-30-0015/16
    0 references