Training Grandland October 2018 (Q3542381)

From EU Knowledge Graph
Revision as of 18:15, 9 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
Jump to navigation Jump to search
Project Q3542381 in Germany
Language Label Description Also known as
English
Training Grandland October 2018
Project Q3542381 in Germany

    Statements

    0 references
    40,532.11 Euro
    0 references
    50,665.14 Euro
    0 references
    80.0 percent
    0 references
    8 October 2018
    0 references
    31 October 2018
    0 references
    Opel Automobile GmbH
    0 references
    0 references
    0 references

    50°59'10.57"N, 10°19'3.72"E
    0 references
    99817 Eisenach
    0 references
    Voraussichtlich ab Mitte 2019 soll der Opel Grandland X in Eisenach produziert werden. Dieses Modell wird auf einer für die Mitarbeiter neuen Plattform, der EMP2-Plattform gefertigt. Im Zuge der damit verbundenen Anlagen- und Prozessveränderungen muss eine Vielzahl von Mitarbeitern gezielt daraufhin geschult werden. Es wird beabsichtigt ca. 70 Mitarbeiter aus verschiedenen Bereichen zu den grundlegenden Fertigungsstufen, -prozessen sowie zu den Besonderheiten des neuen Modells bei der Produktion im Eisenacher Werk zu trainieren. Ziel des Projektes ist es, diesen Mitarbeitern das für die Produktion des Modells „GrandlandX“ notwendige Grundwissen zum Aufbau, zu Fertigungsprozessen und Technologien zu vermitteln. Das Training findet im Oktober 2018 statt und wird innerhalb des Werkes Eisenach durchgeführt. (German)
    0 references
    The Opel Grandland X is expected to be produced in Eisenach from mid-2019. This model is manufactured on a new platform for employees, the EMP2 platform. In the course of the associated plant and process changes, a large number of employees need to be trained accordingly. It is intended to train approximately 70 employees from various fields on the basic stages of production, processes and the special features of the new model in production at the Eisenacher plant. The aim of the project is to provide these employees with the basic knowledge necessary for the production of the “GrandlandX” model on the construction, manufacturing processes and technologies. The training will take place in October 2018 and will be carried out within the Eisenach plant. (English)
    18 November 2021
    0 references
    L’Opel Grandland X devrait être produite à Eisenach à partir de la mi-2019. Ce modèle est fabriqué sur une nouvelle plate-forme pour les employés, la plate-forme EMP2. Dans le cadre des changements d’installation et de processus qui y sont associés, un grand nombre de collaborateurs doivent être formés de manière ciblée. L’objectif est de former environ 70 employés de différents secteurs aux étapes de fabrication de base, aux processus ainsi qu’aux particularités du nouveau modèle lors de la production dans l’usine Eisenacher. L’objectif du projet est de fournir à ces collaborateurs les connaissances de base nécessaires à la production du modèle «GrandlandX» en ce qui concerne la construction, les processus de fabrication et les technologies. La formation aura lieu en octobre 2018 et se déroulera à l’intérieur de l’usine Eisenach. (French)
    9 December 2021
    0 references

    Identifiers

    DE_TEMPORARY_ESF_138293
    0 references