Works on railway line No. 8, section Warka – Radom (Lot C, D, E) (Q85999)

From EU Knowledge Graph
Revision as of 10:21, 3 December 2021 by DG Regio (talk | contribs) (‎Removed claim: contained in NUTS (P1845): Radomski (Q2577202), Removing duplicate contained in NUTS)
Jump to navigation Jump to search
Project Q85999 in Poland
Language Label Description Also known as
English
Works on railway line No. 8, section Warka – Radom (Lot C, D, E)
Project Q85999 in Poland

    Statements

    0 references
    0 references
    0 references
    0 references
    493,401,912.82 zloty
    0 references
    118,416,459.08 Euro
    13 January 2020
    0 references
    580,472,838.62 zloty
    0 references
    139,313,481.27 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    27 October 2015
    0 references
    31 December 2023
    0 references
    PKP POLSKIE LINIE KOLEJOWE S.A.
    0 references
    Q2515024 (Deleted Item)
    0 references
    0 references

    51°38'47.4"N, 21°5'27.6"E
    0 references

    51°47'6.4"N, 21°11'0.2"E
    0 references

    51°43'32.5"N, 21°13'35.4"E
    0 references

    51°25'1.9"N, 21°9'39.2"E
    0 references

    51°29'48.1"N, 21°14'13.2"E
    0 references

    51°30'50.0"N, 21°7'25.0"E
    0 references
    Przedmiotem Projektu jest modernizacja linii kolejowej nr 8 na odcinku Warka – Radom (LOT C, D, E), od km 58,100 do km 100,850. Roboty zostały podzielone na trzy odcinki: -LOT C od km 58,100 do km 63,400, -LOT D od km 63,400 do km 85,500, -LOT E od km 85,500 do km 100,850, a obejmują m.in.: • budowę drugiego toru na odcinku Warka – Radom oraz przebudowę istniejącego mostu nad rzeką Pilicą, • kompleksową modernizację infrastruktury w celu podniesienia prędkości maksymalnej dla pociągów pasażerskich do 160 km/h oraz 120 km/h dla pociągów towarowych i nacisku 221 kN/oś, • przekształcenie części stacji i mijanek w przystanki osobowe, • budowę skrzyżowań dwupoziomowych w miejscu przecięcia się z drogami kołowymi o największym współczynniku ruchu, • zabudowę systemu sterowania ruchem pociągów na szlakach (samoczynna blokada liniowa czterostawna, dwukierunkowa) zarządzanego z Lokalnego Centrum Sterowania, oraz zabudowę systemu ERTMS/ETCS poziomu 2 na odcinku od stacji Warszawa Okęcie (km 11,800) do stacji Radom (km 104,250). W ramach zakresu rzeczowego Projektu planuje się budowę/przebudowę: • 2 wiaduktów drogowych, • 5 wiaduktów kolejowych, • 14 mostów kolejowych, • 2 mostów drogowych, • 2 przejść podziemnych. Dodatkowo, projekt obejmuje przystosowanie peronów do potrzeb obsługi osób niepełnosprawnych i o ograniczonej możliwości poruszania się na 1 stacji i 9 przystankach osobowych. (Polish)
    0 references
    The subject of the Project is the modernisation of the railway line No. 8 on the Warka – Radom section (LOT C, D, E), from km 58.100 to km 100.850. The robots were divided into three episodes: —LOT C from km 58.100 to km 63.400, -LOT D from km 63.400 to km 85.500, -LOT E from km 85.500 to km 100.850, including: • construction of the second track on the Warka – Radom section and reconstruction of the existing bridge over the Pilica river, • comprehensive modernisation of the infrastructure in order to increase the maximum speed for passenger trains to 160 km/h and 120 km/h for freight trains and pressure of 221 kN/axe, • conversion of parts of the station and passing stations into passenger stops, • construction of two-storey intersections at the point of intersection with roadways with the highest traffic ratio. As part of the project’s material scope, construction/reconstruction is planned: • 2 road viaducts, • 5 viaducts, • 14 railway bridges, • 2 road bridges, • 2 underground passages. In addition, the project includes the adaptation of platforms to the needs of disabled people with reduced mobility at 1 stations and 9 stops. (English)
    14 October 2020
    0 references
    L’objet du projet est la modernisation de la ligne de chemin de fer no 8 sur le tronçon Warka — Radom (LOT C, D, E), du km 58.100 au km 100,850. Les robots ont été divisés en trois épisodes: —Lot C du km 58100 au km 63400, -LOT D du km 63400 au km 85500, -LOT E du km 85500 au km 100 850, et comprend entre autres: • construction de la deuxième voie sur le tronçon Warka — Radom et reconstruction du pont existant au-dessus de la rivière Pilica, • modernisation complète de l’infrastructure pour augmenter la vitesse maximale des trains de voyageurs à 160 km/h et 120 km/h pour les trains de marchandises et une charge de 221 kN/essieu, • transformation de parties de la gare et des gares de passage en arrêts de voyageurs, • construction d’intersections à deux niveaux à l’intersection avec les routes à roues les plus liées au trafic, • l’installation du système de contrôle des trains sur les sentiers (bloc de ligne à quatre volets auto-exploité, bidirectionnel) géré depuis le centre de contrôle local, et l’installation du système ERTMS/ETCS niveau 2 sur le tronçon allant de la gare de Warszawa Okęcie (km 11 800) à la gare de Radom (km 104 250). Dans le cadre matériel du projet, il est prévu de construire/reconstruire: • 2 viaducs routiers, • 5 viaducs ferroviaires, • 14 ponts ferroviaires, • 2 ponts routiers, • 2 passages souterrains. En outre, le projet comprend l’adaptation des quais aux besoins des personnes handicapées et à mobilité réduite à 1 gare et 9 arrêts de passagers. (French)
    30 November 2021
    0 references
    Map of Warsaw Okęcie-Radom section of railway line 8: red lines indicate installation of ETCS level 2 equipment; blue lines indicate construction work. (English)
    European Union
    0 references

    Identifiers

    POIS.05.01.00-00-0027/17
    0 references
    5169
    0 references