Construction of the S17 Garwolin Expressway – Kurów (Q85854)

From EU Knowledge Graph
Revision as of 21:02, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): La partie principale du projet est la construction de l’autoroute S17 Garwolin — Kurów d’une longueur de 58,574 km et de la voie express S12 de 11,920 km, qui sont situées sur le réseau central (S17) et le RTE-T global (S12). — Construction de l’autoroute S17 Garwolin — Kurów sur le tronçon Garwolin (extrémité du périphérique) — frontière de Mazowieckie et de la voïvodie de Lubelskie, divisée en 2 parties: • 1: Garwolin (fin du périphérique) — G...)
Jump to navigation Jump to search
Project Q85854 in Poland
Language Label Description Also known as
English
Construction of the S17 Garwolin Expressway – Kurów
Project Q85854 in Poland

    Statements

    0 references
    0 references
    0 references
    1,178,476,685.47 zloty
    0 references
    282,834,404.51 Euro
    13 January 2020
    0 references
    1,386,443,159.38 zloty
    0 references
    332,746,358.25 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    30 June 2020
    0 references
    GENERALNA DYREKCJA DRÓG KRAJOWYCH I AUTOSTRAD
    0 references
    0 references

    50°58'34.3"N, 22°47'56.8"E
    0 references

    52°32'46.3"N, 21°12'26.3"E
    0 references
    Zasadniczą częścią projektu jest budowa drogi ekspresowej S17 Garwolin – Kurów o długości 58,574 km oraz drogi ekspresowej S12 o długości 11,920 km, które zlokalizowane są w sieci bazowej (S17) oraz kompleksowej (S12) TEN-T. Projekt składa się z następujących odcinków: - Budowa drogi ekspresowej S17 Garwolin – Kurów na odcinku Garwolin (koniec obwodnicy) – granica woj. mazowieckiego i lubelskiego z podziałem na 2 części: • 1: Garwolin (koniec obwodnicy) – Gończyce (koniec obwodnicy) • 2: Gończyce (koniec obwodnicy) – granica woj. mazowieckiego i lubelskiego; - Budowa drogi ekspresowej S17 Garwolin – Kurów na odcinku granica woj. mazowieckiego i lubelskiego – węzeł „Sielce” obecnie „Kurów Zachód” (bez węzła) z podziałem na 3 części: • 1: granica woj. mazowieckiego i lubelskiego – węzeł „Skrudki” (wraz z węzłem) • 2: węzeł „Skrudki” (bez węzła) – węzeł „Sielce” obecnie „Kurów Zachód” (bez węzła) • 3: odcinek dojazd do przeprawy mostowej na rz. Wiśle w m. Puławy”. Projektowana droga ekspresowa S17/S12 przebiega przez woj. mazowieckie i lubelskie. W województwie mazowieckim zlokalizowana jest w powiecie garwolińskim na obszarze gmin Garwolin, Górzno, Sobolew i Trojanów. W województwie lubelskim zlokalizowana jest w powiecie ryckim na terenie miasta i gminy Ryki oraz gminy Ułęż, zaś w powiecie puławskim na terenie miasta Puławy oraz gmin: Puławy, Żyrzyn i Końskowola. (Polish)
    0 references
    The main part of the project is the construction of the 58.574 km long S17 Garwolin – Kurów expressway and 11.920 km long S12 expressway, which are located in the core network (S17) and the comprehensive (S12) TEN-T. The project consists of the following sections: — Construction of the S17 Garwolin – Kurów expressway on the Garwolin section (end of the ring road) – border of the Mazowieckie and Lublin voivodeships, divided into 2 parts: • 1: Garwolin (end of the ring road) – Gończyce (end of the ring road) • 2: Gończyce (end of the ring road) – border of Mazowieckie and Lubelskie voivodeships; — Construction of the S17 Garwolin-Kurów expressway on the section of the Mazowieckie and Lubelskie Voivodeships – now “Sielce” junction “Kurów West” (without a junction) divided into 3 parts: • 1: border of Mazowieckie and Lubelskie voivodships – node “Skrudki” (including the node) • 2: node “Skrudki” (without a knot) – node “Sielce” currently “Kurów West” (without a knot) • 3: access to the bridge crossing on the river. Vistula in Puławy. The S17/S12 expressway runs through Mazowieckie and Lubelskie voivodeships. In the Mazowieckie voivodship, it is located in the district of Garwolin, Górzno, Sobolew and Trojanów. In Lubelskie voivodship it is located in Ryki County, Ryki commune and Ułęż commune, and in Puławy County in Puławy and communes: Puławy, Żyrzyn and Końskowola. (English)
    14 October 2020
    0 references
    La partie principale du projet est la construction de l’autoroute S17 Garwolin — Kurów d’une longueur de 58,574 km et de la voie express S12 de 11,920 km, qui sont situées sur le réseau central (S17) et le RTE-T global (S12). — Construction de l’autoroute S17 Garwolin — Kurów sur le tronçon Garwolin (extrémité du périphérique) — frontière de Mazowieckie et de la voïvodie de Lubelskie, divisée en 2 parties: • 1: Garwolin (fin du périphérique) — Gończyce (fin du périphérique) • 2: Gończyce (l’extrémité du périphérique) — la frontière des voïvodies Mazowieckie et Lubelskie; — Construction de l’autoroute S17 Garwolin — Kurów sur le tronçon frontalier des voïvodies Mazowieckie et Lubelskie — la jonction «Sielce» maintenant «Kurów Zawest» (sans jonction) divisée en trois parties: • 1: frontière de Mazowieckie et Lubelskie Voïvodie — nœud «Skrudki» (avec le nœud) • 2: Nœud «Skrudki» (sans le nœud) — noeud «Sielce» actuellement «Kurów West» (sans le nœud) • 3: accès de section au passage du pont sur la rangée. Vistule à Puławy. L’autoroute S17/S12 prévue traverse les voïvodies Mazowieckie et Lubelskie. Dans la voïvodie de Mazowieckie, il est situé dans le comté de Garwolin, Górzno, Sobolew et Trojanów. Dans la voïvodie de Lubelskie, il est situé dans le comté de Ryce dans la ville et la commune de Ryki et la commune d’Ułęż, et dans le district de Puławy à Puławy et les communes de: Puławy, Oyrzyn et Końskowola. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.03.01.00-00-0033/17
    0 references