Collection, Urban Wastewater Treatment of Marathon Municipality and Disposal (Q2777422)

From EU Knowledge Graph
Revision as of 11:55, 29 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Le projet concerne le système intégré de gestion des eaux usées dans la zone géographique de la municipalité de Marathon et fournira une solution définitive au problème des eaux usées de la zone pendant plusieurs décennies. Le Marathon Marathon, avec une capacité de 51 400 habitants dans sa phase initiale (provision 2030) et jusqu’à 110 000 dans la phase finale (2060) servira les colonies d’Agios Panteleimon, Marathon, Zuberi (section de localis...)
Jump to navigation Jump to search
Project Q2777422 in Greece
Language Label Description Also known as
English
Collection, Urban Wastewater Treatment of Marathon Municipality and Disposal
Project Q2777422 in Greece

    Statements

    0 references
    101,695,922.0 Euro
    0 references
    15 September 2019
    0 references
    29 December 2023
    0 references
    ΕΥΔΑΠ ΑΕ.
    0 references
    0 references
    0 references

    38°3'38.27"N, 23°43'46.24"E
    0 references

    38°3'38.27"N, 23°43'46.24"E
    0 references
    Το έργο αφορά στο ολοκληρωμένο σύστημα διαχείρισης λυμάτων στη γεωγραφική περιοχή του Δήμου Μαραθώνα και πρόκειται να δώσει οριστική λύση στο επί σειρά δεκαετιών πρόβλημα αποχέτευσης της περιοχής. Το Κέντρο Επεξεργασίας Λυμάτων (ΚΕΛ) Μαραθώνα, δυναμικότητας 51.400 κατοίκων στην αρχική του φάση (πρόβλεψη 2030) και έως 110.000 στην τελική φάση (2060) θα εξυπηρετεί τους οικισμούς ’γιος Παντελεήμονας, Μαραθώνας, Ζούμπερι (τμήμα οικισμού), Νέα Μάκρη, Αγία Μαρίνα (τμήμα οικισμού), Νέος Βουτζάς (τμήμα του οικισμού). Θα λειτουργεί με τεχνολογία που θα επιτρέπει τη χρήση της επεξεργασμένης εκροής για απεριόριστη άρδευση. Η λειτουργία του έργου θα συμβάλει καθοριστικά στην περιβαλλοντική αναβάθμιση της περιοχής και στην περαιτέρω τουριστική της ανάπτυξη. (Greek)
    0 references
    The project concerns the integrated wastewater management system in the geographical area of the Municipality of Marathon and will provide a definitive solution to the area’s drainage problem for decades. The Marathon Water Treatment Center (KEL) with a capacity of 51,400 inhabitants in its initial phase (provision 2030) and up to 110.000 in the final phase (2060) will serve the settlements of Agios Panteleimonas, Marathonas, Zuberi (settle section), Nea Makri, Agia Marina (settle section), Neos Vooutzas (part of the settlement). It will operate with technology allowing the use of processed effluent for unlimited irrigation. The operation of the project will contribute decisively to the environmental upgrading of the area and its further tourist development. (English)
    2 July 2021
    0 references
    Le projet concerne le système intégré de gestion des eaux usées dans la zone géographique de la municipalité de Marathon et fournira une solution définitive au problème des eaux usées de la zone pendant plusieurs décennies. Le Marathon Marathon, avec une capacité de 51 400 habitants dans sa phase initiale (provision 2030) et jusqu’à 110 000 dans la phase finale (2060) servira les colonies d’Agios Panteleimon, Marathon, Zuberi (section de localisation), Nea Makri, Agia Marina (une partie de la colonie), Neos Vooutzas (partie de la colonie). Il fonctionnera avec la technologie qui permet l’utilisation de la sortie traitée pour l’irrigation illimitée. L’exploitation du projet contribuera de manière significative à l’amélioration de l’environnement de la région et à son développement touristique. (French)
    29 November 2021
    0 references

    Identifiers

    5.039.507
    0 references