Development of water management in Riga, Stage 5 (Q3057417)

From EU Knowledge Graph
Revision as of 09:37, 28 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Ziel des Projekts „Entwicklung der Wasserbewirtschaftung in Riga, Stufe 5“ (im Folgenden in der gesamten Form – das Projekt) ist der Bau eines Wasserversorgungs- und Kanalisationssystems im erweiterten Ballungsraum der Stadt Riga, um die Nutzung öffentlicher Wasserbewirtschaftungsdienste zu verbessern, ihre Zugänglichkeit und Qualität zu verbessern, eine hochwertige Lebensumwelt zu gewährleisten, die Umweltverschmutzung und die Eutrophierung von...)
Jump to navigation Jump to search
Project Q3057417 in Latvia
Language Label Description Also known as
English
Development of water management in Riga, Stage 5
Project Q3057417 in Latvia

    Statements

    0 references
    0 references
    9,932,725.0 Euro
    0 references
    15,571,007.34 Euro
    0 references
    63.79 percent
    0 references
    1 August 2018
    0 references
    31 December 2023
    0 references
    SIA "Rīgas ūdens"
    0 references
    0 references
    0 references

    56°56'57.84"N, 24°6'18.65"E
    0 references
    Projekta “Ūdenssaimniecības attīstība Rīgā, 5.kārta” (turpmāk visā veidlapā – Projekts) mērķis ir ūdensapgādes un kanalizācijas sistēmas izbūve Rīgas pilsētas paplašinātajā notekūdeņu aglomerācijas teritorijā, tādējādi attīstot sabiedrisko ūdenssaimniecības pakalpojumu izmantošanu, uzlabojot to pieejamību un kvalitāti, nodrošinot kvalitatīvu dzīves vidi, samazinot vides piesārņojumu un ūdenstilpju eitrofikāciju un veicinot Eiropas Savienības direktīvas 91/271/EEK (turpmāk – Direktīva 91/271/EEK) par komunālo notekūdeņu attīrīšanu prasību izpildi ūdenssaimniecības jomā.Projekta ietvaros plānotās darbības paredz jaunu kanalizācijas tīklu izbūvi 34,59 km garumā un tīklu rekonstrukciju 0,44 km garumā Berģos, Imantā un Beberbeķos, kā arī izbūvējot kopumā 18 jaunas kanalizācijas sūkņu stacijas. Papildu 2014.-2020.gada plānošanas perioda projekta attiecināmajām darbībām šajās teritorijās tiek plānota arī jaunu centralizēto ūdensapgādes ārējo inženiertīklu izbūve 24,73 km garumā un rekonstrukcija 0,41 km garumā (finansētas kā projekta neattiecināmās izmaksas). Projektu plānots realizēt 69 mēnešu laikā līdz 2023.gada 31.decembrim. Projekta kopējās izmaksas plānotas 26 006 448,27 EUR apmērā, tai skaitā Kohēzijas fonda līdzfinansējums 9 932 725,00 EUR apmērā. Projekta realizācija paredz 2959 iedzīvotāju pieslēgšanu centralizētai kanalizācijas sistēmai. (Latvian)
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. The project is planned to be implemented within 69 months until December 31, 2023. The total cost of the project is planned in the amount of EUR 26006448,27, including co-financing from the Cohesion Fund in the amount of EUR 9932725,00. The implementation of the project envisages the connection of 2959 inhabitants to a centralised sewerage system. (English)
    15 July 2021
    0 references
    L’objectif du projet «Développement de la gestion de l’eau à Riga, étape 5» (ci-après dénommé «le projet») est la construction d’un système d’approvisionnement en eau et d’assainissement dans l’agglomération élargie de la ville de Riga, développant ainsi l’utilisation des services publics de gestion de l’eau, améliorant leur accessibilité et leur qualité, assurant un environnement de vie de qualité, réduisant la pollution environnementale et l’eutrophisation des masses d’eau et favorisant le respect des exigences de la directive 91/271/CEE de l’Union européenne (ci-après la «directive 91/271/CEE») relative au traitement des eaux urbaines résiduaires dans le domaine de la gestion des eaux. un total de 59 km et la reconstruction de filets de 0,44 km à Ber’i, Imanta et Beberbecki, ainsi que la construction d’un total de 18 nouvelles stations de pompage des égouts. Outre les activités éligibles au projet de la période de programmation 2014-2020, la construction de nouveaux réseaux centraux d’approvisionnement en eau d’une longueur de 24,73 km et la reconstruction de 0,41 km (financés en tant que coûts inéligibles du projet) sont également prévues dans ces domaines. Le projet devrait être mis en œuvre dans un délai de 69 mois jusqu’au 31 décembre 2023. Les coûts totaux du projet sont prévus pour un montant de 26 006 448,27 EUR, y compris le cofinancement par le Fonds de cohésion d’un montant de 9 932 725,00 EUR. La mise en œuvre du projet prévoit le raccordement de 2959 habitants à un réseau d’assainissement centralisé. (French)
    25 November 2021
    0 references
    Ziel des Projekts „Entwicklung der Wasserbewirtschaftung in Riga, Stufe 5“ (im Folgenden in der gesamten Form – das Projekt) ist der Bau eines Wasserversorgungs- und Kanalisationssystems im erweiterten Ballungsraum der Stadt Riga, um die Nutzung öffentlicher Wasserbewirtschaftungsdienste zu verbessern, ihre Zugänglichkeit und Qualität zu verbessern, eine hochwertige Lebensumwelt zu gewährleisten, die Umweltverschmutzung und die Eutrophierung von Wasserkörpern zu verringern und die Erfüllung der Anforderungen der Richtlinie 91/271/EWG der Europäischen Union (im Folgenden: Richtlinie 91/271/EWG) über die Behandlung von kommunalem Abwasser im Bereich der Wasserbewirtschaftung zu fördern. insgesamt 59 km und Umbau von Netzen von 0,44 km in Ber-i, Imanta und Beberbecki, sowie den Bau von insgesamt 18 neuen Kanalpumpenstationen. Neben den projektzuschussfähigen Tätigkeiten des Programmplanungszeitraums 2014-2020 ist auch der Bau neuer externer Wasserversorgungsnetze für die zentrale Wasserversorgung von 24,73 km und der Wiederaufbau von 0,41 km (als nicht förderfähige Kosten des Projekts) in diesen Bereichen geplant. Das Projekt soll innerhalb von 69 Monaten bis zum 31. Dezember 2023 durchgeführt werden. Die Gesamtkosten des Projekts sind in Höhe von 266 448,27 EUR veranschlagt, einschließlich der Kofinanzierung aus dem Kohäsionsfonds in Höhe von 9 932 725,00 EUR. Die Umsetzung des Projekts sieht die Anbindung von 2959 Einwohnern an ein zentrales Kanalisationssystem vor. (German)
    28 November 2021
    0 references
    Rīga
    0 references

    Identifiers

    5.3.1.0/18/I/002
    0 references