Program of "Emergency Measures 2017 — Improving Water Resources — Strengthening the Drilling of Béja, Kawéni la pretty and Bouyouni (Q3700781)
Jump to navigation
Jump to search
Project Q3700781 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | Program of "Emergency Measures 2017 — Improving Water Resources — Strengthening the Drilling of Béja, Kawéni la pretty and Bouyouni |
Project Q3700781 in France |
Statements
415,434.0 Euro
0 references
553,911.0 Euro
0 references
75.0 percent
0 references
15 June 2017
0 references
31 December 2019
0 references
SI D'EAU ET D'ASSAINISSEMENT DE MAYOTTE
0 references
Le SIEAM par délégation à la SMAE exploite actuellement les forages de Beja, kawéni la jolie et de Bouyouni destinés à l'alimentation en eau potable. L'objectif du projet est la sécurisation de l'approvisionnement eau des habitants en anticipation d’une future sécheresse . Ces forages, qui sont actuellement sous exploités en terme de capacité, nécessitent d'être renforcé pour augmenter le débit de production et le transfert d'eaux brutes vers les réseaux actuels. L'objectif de ce renforcement est d'augmenter les débits de forage dans les limites horaies de pompage (20h/jour) afin de puiser le maximum d'eau sans porter préjudice aux nappes souterraines. L’augmentation du débit prévisionnelle supplémentaire évoluera comme suit : - forage de Beja : 260m3/jour - forage de Kawéni :400m3/jour - Forage de Bouyouni : 200m3/jour (French)
0 references
SIEAM by delegation to SMAE is currently exploiting the boreholes of Beja, Kawéni la pretty and Bouyouni for drinking water supply. The objective of the project is to secure the water supply of the inhabitants in anticipation of a future drought. These boreholes, which are currently under-exploited in terms of capacity, need to be strengthened to increase the flow of production and the transfer of raw water to existing systems. The objective of this reinforcement is to increase drilling flows within pumping horaie limits (20h/day) in order to draw the maximum amount of water without prejudice to groundwater. The increase in the additional forecast flow rate will change as follows: — Beja drilling: 260 m³/day — Drilling Kawéni:400 m³/day — Bouyouni Drilling: 200 m³/day (English)
22 November 2021
0 references
Le SIEAM par délégation à la SMAE exploite actuellement les forages de Beja, kawéni la jolie et de Bouyouni destinés à l’alimentation en eau potable. L‚objectif du projet est la sécurization de l‘approvisionnement eau des habitants en anticipation d’une future sécheresse. CES forages, qui sont actuellement sous Exploités en terme de capacité, nécessitent d‚être renforcé pour augmenter le débit de production et le transfert d‘eaux brutes vers les réseaux actuels. L‚objectif de ce renforcement est d‘augmenter les débits de forage dans les limites horaies de pompage (20h/jour) afin de puiser le maximum d’eau sans porter préjudice aux nappes souterraines. L’augmentation du débit prévisionnelle supplémentaire évoluera comme suit: — forage de Beja: 260 m³/jour – forage de Kawéni:400 m³/jour – Forage de Bouyouni: 200 m³/Jour (German)
27 November 2021
0 references
Identifiers
PY0017583
0 references