Development of water services in Dundaga round II (Q3057395)

From EU Knowledge Graph
Revision as of 20:31, 25 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Développer et améliorer la qualité des services d’approvisionnement en eau et d’assainissement et assurer des possibilités de raccordement, tout en améliorant la qualité de l’environnement et en fournissant aux citoyens une eau potable normative. Les principales mesures sont la construction de nouveaux réseaux d’assainissement 3,19 km, la construction d’un nouveau tuyau d’égout de 0,81 km, la construction de trois nouveaux égouts et un nouveau r...)
Jump to navigation Jump to search
Project Q3057395 in Latvia
Language Label Description Also known as
English
Development of water services in Dundaga round II
Project Q3057395 in Latvia

    Statements

    0 references
    0 references
    628,880.8 Euro
    0 references
    865,392.6 Euro
    0 references
    72.67 percent
    0 references
    21 March 2018
    0 references
    31 December 2021
    0 references
    SIA "ZIEMEĻKURZEME"
    0 references
    0 references
    0 references

    57°30'34.16"N, 22°21'0.76"E
    0 references
    Attīstīt un uzlabot ūdensapgādes un kanalizācijas sistēmas pakalpojumu kvalitāti un nodrošināt pieslēgšanas iespējas, vienlaikus uzlabojot vides kvalitāti un nodrošinot iedzīvotājus ar normatīvu prasībām atbilstošu dzeramo ūdeni. Galvenie pasākumi ir jaunu kanalizācijas tīklu izbūve 3,19 km, jauna kanalizācijas spiedvada izbūve 0.81 km izbūve, trīs jaunu kanalizācijas un jauna ūdensvada tīkla izbūvi 1,1 km garumā. Projekta plānotās kopējās izmaksas ir EUR 1286008.50 ar PVN. Plānots, ka izbūvētajam kanalizācijas tīklam varēs pieslēgties 208 iedzīvotāji, bet ūdensvada tīkla 64 iedzīvotāji. (Latvian)
    0 references
    Develop and improve the quality of water supply and sewerage system services and ensure connection possibilities, while improving the quality of the environment and providing the population with drinking water complying with normative requirements. The main measures include construction of new sewerage networks of 3.19 km, construction of a new sewer pressure line 0.81 km, construction of three new sewage and new water supply network for 1.1 km. The total cost of the project is EUR 1286008.50 with VAT. It is planned that 208 inhabitants will be able to connect to the built sewage network, and 64 inhabitants of the water network. (English)
    15 July 2021
    0 references
    Développer et améliorer la qualité des services d’approvisionnement en eau et d’assainissement et assurer des possibilités de raccordement, tout en améliorant la qualité de l’environnement et en fournissant aux citoyens une eau potable normative. Les principales mesures sont la construction de nouveaux réseaux d’assainissement 3,19 km, la construction d’un nouveau tuyau d’égout de 0,81 km, la construction de trois nouveaux égouts et un nouveau réseau d’alimentation en eau de 1,1 km. Le coût total du projet s’élève à 1 286 008,50 EUR TTC. Il est prévu que 208 habitants puissent se connecter au réseau d’assainissement construit, tandis que 64 habitants du réseau d’approvisionnement en eau seront en mesure de se connecter. (French)
    25 November 2021
    0 references
    Dundaga, Dundagas pag., Talsu nov.
    0 references
    Jaundundaga, Dundagas pag., Talsu nov.
    0 references

    Identifiers

    5.3.1.0/17/I/028
    0 references