Collective boiler room and wood heat network — Hameau de Saint-Martial MONTAUBAN (82) (Q3682749)

From EU Knowledge Graph
Revision as of 16:22, 24 November 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q3682749 in France
Language Label Description Also known as
English
Collective boiler room and wood heat network — Hameau de Saint-Martial MONTAUBAN (82)
Project Q3682749 in France

    Statements

    0 references
    59,535.45 Euro
    0 references
    170,101.63 Euro
    0 references
    35.0 percent
    0 references
    11 April 2017
    0 references
    30 November 2018
    0 references
    Ville de Montauban
    0 references
    0 references
    La Ville de Montauban est propriétaire de quatre bâtiments communaux au Hameau de Saint-Martial qui ne sont pas desservis par le gaz naturel. Les bâtiments de l’école maternelle et l’école primaire sont chauffés au fioul, ceux de la salle des fêtes et de la Maison de quartier sont quant à eux chauffés à l’électricité. Du fait de la proximité géographique de ces quatre bâtiments, la possibilité de créer une chaufferie bois et un réseau de chaleur pouvant les alimenter a été étudiée et a permis de conclure à la réalisation d’une économie d’énergie de 38% en coût d’exploitation et à la production de 164MWH d’énergie renouvelable. La chaufferie sera équipée de chaudières bois déchiqueté de 100KW chacune, et d'un ballon tampon de 2000 litres pour lisser les appels de puissance. Les chaudières assureront, la totalité de la consommation totale de chauffage. La période prévisionnelle de réalisation de l'opération est du 11/04/2017 au 30/11/2018. (French)
    0 references
    The City of Montauban owns four communal buildings in the Hameau de Saint-Martial that are not served by natural gas. The buildings of the kindergarten and the primary school are heated with fuel, while those in the party hall and the neighbourhood house are heated by electricity. Due to the geographical proximity of these four buildings, the possibility of creating a wood boiler room and a heating network to supply them was studied and concluded that energy savings of 38 % in operating costs and the production of 164MWH of renewable energy were achieved. The boiler room will be equipped with 100KW shredded wood boilers, and a 2000-litre buffer balloon to smooth out power calls. The boilers will provide the full total heating consumption. The estimated period for carrying out the operation is from 11/04/2017 to 30/11/2018. (English)
    18 November 2021
    0 references

    Identifiers

    MP0016017
    0 references