No label defined (Q3687623)

From EU Knowledge Graph
Revision as of 19:31, 18 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): In order to make the EuroVelo n°5 (London-Brindisi) route to the south of Lille continuous, the European Metropolis of Lille plans to absorb the missing links located in the municipality of Haubourdin. Two sections will be completed in the south (800 m) and in the centre of the municipality. The project involves the construction of the bicycle road infrastructure (a 3 m wide track for pedestrians, cyclists, riders, and PMRs, a bridge crossing of...)
Jump to navigation Jump to search
Project Q3687623 in France
Language Label Description Also known as
English
No label defined
Project Q3687623 in France

    Statements

    0 references
    97,256.0 Euro
    0 references
    202,617.67 Euro
    0 references
    48.0 percent
    0 references
    19 June 2017
    0 references
    1 March 2018
    0 references
    Métropole Européenne de Lille
    0 references
    Afin de rendre continu l’itinéraire de l’EuroVelo n°5 (Londres-Brindisi) au Sud de Lille, la Métropole européenne de Lille prévoit de résorber les maillons manquants situés sur la commune d’Haubourdin. Ainsi deux tronçons seront réalisés au sud (800 m) et au centre de la commune. Le projet prévoit la réalisation de l’infrastructure véloroute (une voie de 3 m de large pour les piétons, les cyclistes, les cavaliers, et les PMR, un passage sous pont de la RD341, des placettes et belvédères), la pose de l’ensemble des équipements associés (mobilier de sécurité, mobilier d'agrément et les plantations) tout en assurant le raccordements aux voies existantes. (French)
    0 references
    In order to make the EuroVelo n°5 (London-Brindisi) route to the south of Lille continuous, the European Metropolis of Lille plans to absorb the missing links located in the municipality of Haubourdin. Two sections will be completed in the south (800 m) and in the centre of the municipality. The project involves the construction of the bicycle road infrastructure (a 3 m wide track for pedestrians, cyclists, riders, and PMRs, a bridge crossing of RD341, plots and lookouts), the installation of all the associated equipment (safety furniture, amenities and plantings) while ensuring the connection to the existing tracks. (English)
    18 November 2021
    0 references

    Identifiers

    NP0004814
    0 references