LPW-E/3.3.1/1252 — Energetic renovation of the seawater wave pool Piratenmeer Büsum (Q3334039)

From EU Knowledge Graph
Revision as of 08:09, 5 November 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
Jump to navigation Jump to search
Project Q3334039 in Germany
Language Label Description Also known as
English
LPW-E/3.3.1/1252 — Energetic renovation of the seawater wave pool Piratenmeer Büsum
Project Q3334039 in Germany

    Statements

    0 references
    3,952,145.53 Euro
    0 references
    7,904,291.06 Euro
    0 references
    50.0 percent
    0 references
    8 July 2019
    0 references
    30 November 2021
    0 references
    Kur und Tourismus Service Büsum, Eigenbetrieb der Gemeinde Büsum
    0 references
    0 references

    54°8'25.19"N, 8°51'47.92"E
    0 references
    25761 Büsum
    0 references
    Energetische Sanierung des Meerwasserhallenwellenbades, Südstrand 9 in Büsum, Fassadensanierung mit Aufbringung von Mineralfaserplatten, Glasfassaden und Fensterelemente werden durch Pfostenriegelfassaden mit Dreifachverglasung in hochwärmedämmender Ausführung ausgetauscht, Ersatz der Tragscheibe der Dachschale durch Warmdachaufbau mit Dämmung im Niedrigenergiestandard, Reduzierung der Wasserfläche im Außenbereich durch Rückbau des Außenbeckens im Tausch gegen abdeckbare Whirlpools und Warmwassersuhle,Technische Gebäudeausrüstung: Sanierung von Leitungen auf Standard der EnEV, automatisierte thermische Desinfektion der Trinkwasserleitungen, Nutzung des abgebadeten Wassers der Kalttauchbecken als Grauwasser für Toilettenspülung,Sanierung der raumlufttechnischen Anlagen als frequenzumformergesteuerte Ausführung, Neubau von 8 öffenbaren Oberlichtern, Sanierung der elektrischen Anlagen zur Energieeinsparung, Verwendung von dimmbaren LED-Leuchtmitteln, Neubau von Niedrigdruckfiltern, Badewassertechnik wird auf den Stand der DIN19643 gebracht. Weitere Erläuterung s. Anlage zur energetischen Sanierung (German)
    0 references
    Energetic refurbishment of the Seawater Hallwell Bath, Südstrand 9 in Büsum, facade refurbishment with the application of mineral fibre panels, glass facades and window elements are replaced by post-locking facades with triple glazing in highly thermal insulating design, replacement of the roof shell by warm roof construction with insulation in the low energy standard, reduction of the outdoor water surface by decommissioning the outdoor pool in exchange for coverable whirlpools and hot water sole,Technical building equipment: Refurbishment of pipes to EnEV standard, automated thermal disinfection of drinking water pipes, use of the bathed water of the cold dip pools as grey water for toilet flushing, refurbishment of the air-conditioning systems as a frequency converter-controlled version, new construction of 8 openable top lights, refurbishment of electrical installations for energy saving, use of dimmable LED lights, new construction of low-pressure filters, bath water technology is brought to the stand of DIN19643. For further explanation see Annex to the Energy Renovation (English)
    25 October 2021
    0 references

    Identifiers

    DE_TEMPORARY_36684
    0 references