LPW-E/3.1.1/407 — High degree of flexibility of a biogas plant (Q3333979)

From EU Knowledge Graph
Revision as of 08:08, 5 November 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
Jump to navigation Jump to search
Project Q3333979 in Germany
Language Label Description Also known as
English
LPW-E/3.1.1/407 — High degree of flexibility of a biogas plant
Project Q3333979 in Germany

    Statements

    0 references
    182,812.95 Euro
    0 references
    365,625.9 Euro
    0 references
    50.0 percent
    0 references
    14 March 2016
    0 references
    31 January 2018
    0 references
    Bioenergie Lebrade-RixdorfGmbH & Co. KG
    0 references
    0 references

    54°9'43.09"N, 10°25'22.12"E
    0 references
    24306 Lebrade
    0 references
    Die Biogasanlage (BGA) setzt ein Zeichen für die bedarfsgerechte Stromerzeugung aus Biogas. Es erfolgt eine Umrüstung der BGA von heutiger 24/7 Grundlastproduktion zur flexiblen Stromerzeugung, um v.a. die fehlende Stromerzeugung von Sonne und Wind in windstillen und schattigen Stunden zu überbrücken. Die bedarfsgerechte Stromerzeugung kann dabei zu jeder beliebigen Wochenstunde abgerufen werden. Die dafür notwendige Steuerung der BGA ermöglicht zum einen die interne Kommunikation zwischen BHKW, Gasspeicher und Wärmespeicher; zum anderen die externe Kommunikation zur Strombörse, um die Mengenknappheit im Strommarkt (ausgedrückt durch Preissignale) in einen BHKW - Produktionsfahrplan zu übersetzen. Die notwendige IT-Entwicklung, Technik und deren Implementierung ist Gegenstand des Förderprojekts. (German)
    0 references
    The biogas plant (BGA) is a sign of demand-based electricity generation from biogas. The BGA is being upgraded from today’s 24/7 base load production to flexible power generation in order to bridge the lack of electricity generation from the sun and wind in still and shady hours. The demand-based power generation can be accessed at any hour of the week. The necessary control of the BGA enables on the one hand the internal communication between CHP, gas storage and heat storage; on the other hand, external communication to the power exchange in order to translate the quantity shortage in the electricity market (expressed by price signals) into a CHP production schedule. The necessary IT development, technology and their implementation are the subject of the funding project. (English)
    25 October 2021
    0 references

    Identifiers

    DE_TEMPORARY_36624
    0 references