Construction of a charging station with 2 normal charging points (each 11 kW) including grid connection as public charging station (Q3301043)

From EU Knowledge Graph
Revision as of 13:33, 26 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q3301043 in Germany
Language Label Description Also known as
English
Construction of a charging station with 2 normal charging points (each 11 kW) including grid connection as public charging station
Project Q3301043 in Germany

    Statements

    0 references
    143.98 Euro
    0 references
    17,998.01 Euro
    0 references
    0.8 percent
    0 references
    1 November 2019
    0 references
    26 June 2020
    0 references
    AutoLand FF GmbH
    0 references
    0 references

    52°20'28.43"N, 14°32'58.02"E
    0 references
    Frankfurt (Oder), Stadt
    0 references

    Identifiers

    DE_TEMPORARY_3845
    0 references