Energy efficiency in manufacturing and operation processes (Q3319104)

From EU Knowledge Graph
Revision as of 07:25, 25 October 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3319104 in Germany
Language Label Description Also known as
English
Energy efficiency in manufacturing and operation processes
Project Q3319104 in Germany

    Statements

    0 references
    24,395.01 Euro
    0 references
    30,493.76 Euro
    0 references
    80.0 percent
    0 references
    12 July 2017
    0 references
    30 September 2018
    0 references
    Homatec IndustrietechnikGmbH
    0 references
    0 references

    50°55'11.93"N, 12°48'20.38"E
    0 references
    Steigerung der Energieeffizienz durch Erneuerung und Umrüstung der Beleuchtung auf LED-Technik (37 Stk. TRILUX Mirona Fit B mit 188W, 3 Stk. TRILUX Mirona Fit TB mit 94W, 50 Stk. TRILUX Mirona Fit TB LED mit 188W, 8 Stk. TRILUX Oleveon 1200 LED mit 39W, 42 Stk. TRILUX Oleveon 1500 LED mit 55W, 4 Stk. TRILUX ArimoS mit 71W, 10 Stk. LIQ 701 mit 48W) (German)
    0 references
    Increase energy efficiency by renewing and upgrading lighting to LED technology (37 pcs. TRILUX Mirona Fit B with 188 W, 3 pcs. TRILUX Mirona Fit TB with 94 W, 50 pcs. TRILUX Mirona Fit TB LED with 188 W, 8 pcs. TRILUX Oleveon 1200 LED with 39 W, 42 pcs. TRILUX Oleveon 1500 LED with 55 W, 4 pcs. TRILUX ArimoS with 71 W, 10 pcs. Liq 701 with 48 W) (English)
    25 October 2021
    0 references
    Burgstädt, Stadt
    0 references

    Identifiers

    672 / 101003364061
    0 references