No label defined (Q3215703)
Jump to navigation
Jump to search
Project 0.15706665027129196 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project 0.15706665027129196 in Spain |
Statements
6,828,584.0 Euro
0 references
13,657,168.0 Euro
0 references
50.0 percent
0 references
27 October 2017
0 references
28 February 2018
0 references
GENERALITAT DE CATALUNYA - DEPARTAMENTO DE TERRITORIO Y SOSTENIBILIDAD
0 references
17158
0 references
El proyecto prevé la realización de las obras necesarias para la mejora de la conectividad por la herpetofauna de l'Estany de la Cardonera y de l'Estany de en Pozos en dos tramos de la carretera GI-602, del PK 5+500 al PK 6+000 y del PK 9+500 al PK 10+000, al municipio de Sant Climent Sescebes._x000D_ Entre el PK 5+500 y el 6+000, la carretera GI-602 quiniela el estanque de la Cardonera por la parte central. En este tramo, las actuaciones son: La ejecución de un nuevo paso inferior prefabricado (dimensiones interiores 1 x 1m ) como paso de fauna por anfibios. La adecuación de los pasos inferiores existentes como pasos de fauna por anfibios. La ejecución de dos zanjas de captación adaptadas por la herpetofauna en los caminos de tierra ante la carretera. Adecuación y reperfilamiento de los drenajes longitudinales existentes. Y la señalización, balizamiento y seguridad vial. _x000D_ Entre el PK 9+500 y el 10+000, la carretera pasa por el lado del estanque de en Pozos. Las actuaciones en este tramo son: La retirada de la valla existente. Adecuación y reperfilament de los drenajes longitudinales existentes. La ejecución de dos zanjas de captación adaptadas por la herpetofauna en los caminos de tierra ante la carretera. La construcción de zanjas permanentes para la protección de anfibios. La rehabilitación estructural del firme afectado. Y la señalización, balizamiento y seguridad vial (Spanish)
0 references
The project foresees the realisation of the necessary works for the improvement of the connectivity for the herpetofauna of the Lake of the Cardonera and of the Lake of in Pous in two stretches of the road GI-602, of the PK 5+500 to the PK 6+000 and of the PK 9+500 to the PK 10+000, to the municipality of Sant Climent Sescebes._x000D_ Go in the PK 5+500 and the 6+000, the road GI-602 crosses the lake of the Cardonera for the central part. In this stretch, the performances are: The execution of a new inferior step prefabricated (inner dimensions 1 x 1m ) as a step of fauna for amphibious. The adaptation of the existent inferior steps as a steps of fauna for amphibious. The execution of two trenches of catchment adapted by the herpetofauna in the paths of land in front of the road. Adaptation and profiling of the existent longitudinal drainages. And the signaling, beaconage and road security. _x000D_ Go in the PK 9+500 and the 10+000, the road happens for the side of the lake of in Pous. The performances in this stretch are: The withdrawal of the existent fence. Adaptation and profiling of the existent longitudinal drainages. The execution of two trenches of catchment adapted by the herpetofauna in the paths of land in front of the road. The building of permanent fences for the protection of amphibious. The structural rehabilitation of the firm affected. And the signaling, beaconage and road security. (English)
0 references
Sant Climent Sescebes
0 references
Identifiers
PO01-007885
0 references