Development of water management in Riga, Stage 5 (Q3057417)

From EU Knowledge Graph
Revision as of 10:15, 27 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: modifying co-finance rate with the percentage)
Jump to navigation Jump to search
Project Q3057417 in Latvia
Language Label Description Also known as
English
Development of water management in Riga, Stage 5
Project Q3057417 in Latvia

    Statements

    0 references
    0 references
    9,932,725.0 Euro
    0 references
    15,571,007.34 Euro
    0 references
    63.79 percent
    0 references
    1 August 2018
    0 references
    31 December 2023
    0 references
    SIA "Rīgas ūdens"
    0 references
    0 references
    0 references

    56°56'57.84"N, 24°6'18.65"E
    0 references
    Projekta “Ūdenssaimniecības attīstība Rīgā, 5.kārta” (turpmāk visā veidlapā – Projekts) mērķis ir ūdensapgādes un kanalizācijas sistēmas izbūve Rīgas pilsētas paplašinātajā notekūdeņu aglomerācijas teritorijā, tādējādi attīstot sabiedrisko ūdenssaimniecības pakalpojumu izmantošanu, uzlabojot to pieejamību un kvalitāti, nodrošinot kvalitatīvu dzīves vidi, samazinot vides piesārņojumu un ūdenstilpju eitrofikāciju un veicinot Eiropas Savienības direktīvas 91/271/EEK (turpmāk – Direktīva 91/271/EEK) par komunālo notekūdeņu attīrīšanu prasību izpildi ūdenssaimniecības jomā.Projekta ietvaros plānotās darbības paredz jaunu kanalizācijas tīklu izbūvi 34,59 km garumā un tīklu rekonstrukciju 0,44 km garumā Berģos, Imantā un Beberbeķos, kā arī izbūvējot kopumā 18 jaunas kanalizācijas sūkņu stacijas. Papildu 2014.-2020.gada plānošanas perioda projekta attiecināmajām darbībām šajās teritorijās tiek plānota arī jaunu centralizēto ūdensapgādes ārējo inženiertīklu izbūve 24,73 km garumā un rekonstrukcija 0,41 km garumā (finansētas kā projekta neattiecināmās izmaksas). Projektu plānots realizēt 69 mēnešu laikā līdz 2023.gada 31.decembrim. Projekta kopējās izmaksas plānotas 26 006 448,27 EUR apmērā, tai skaitā Kohēzijas fonda līdzfinansējums 9 932 725,00 EUR apmērā. Projekta realizācija paredz 2959 iedzīvotāju pieslēgšanu centralizētai kanalizācijas sistēmai. (Latvian)
    0 references
    The aim of the project “Development of water management in Riga, Stage 5” (henceforward – the project) is the construction of water supply and sewerage system in the expanded wastewater agglomeration area of Riga city, thus developing the use of public water management services, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, providing quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereinafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies, promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, ensuring quality of water management, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, ensuring quality living environment, reducing environmental pollution and eutrophication of water bodies and promoting the European Union Directive 91/271/EEC (hereafter – Directive 91/271/EEC) on urban waste water treatment, improving their availability and quality, reducing environmental pollution and eutrophication of water bodies and promoting In addition to the eligible actions of the 2014-2020 planning period project in these territories, construction of new centralised external water supply engineering networks in the length of 24.73 km and reconstruction in the length of 0.41 km (financed as ineligible costs of the project) is planned. The project is planned to be implemented within 69 months until December 31, 2023. The total cost of the project is planned in the amount of EUR 26006448,27, including co-financing from the Cohesion Fund in the amount of EUR 9932725,00. The implementation of the project envisages the connection of 2959 inhabitants to a centralised sewerage system. (English)
    15 July 2021
    0 references
    Rīga
    0 references

    Identifiers

    5.3.1.0/18/I/002
    0 references