Completing the FEZABILITY STUDY for the rehabilitation of the bridge over the Borcea arm, located on Highway A2, at km 149+ 680 and Rehabilitation of the Cernavoda Bridge located on Highway A2, at 157+ 600 km and ELABORATION of the documentation SUPORT FOR FINANTING CERATION (Q3095657)

From EU Knowledge Graph
Revision as of 15:53, 23 September 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q3095657 in Romania
Language Label Description Also known as
English
Completing the FEZABILITY STUDY for the rehabilitation of the bridge over the Borcea arm, located on Highway A2, at km 149+ 680 and Rehabilitation of the Cernavoda Bridge located on Highway A2, at 157+ 600 km and ELABORATION of the documentation SUPORT FOR FINANTING CERATION
Project Q3095657 in Romania

    Statements

    0 references
    31,906.32 Romanian Leu
    0 references
    6,381.264 Euro
    13 September 2021
    0 references
    37,536.84 Romanian Leu
    0 references
    7,507.3679999999995 Euro
    13 September 2021
    0 references
    0.85 percent
    0 references
    1 September 2018
    0 references
    31 December 2022
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    0 references

    44°24'46.44"N, 26°11'1.21"E
    0 references
    Asigurarea de capacitatea de circulatie necesara si conditii corespuzatoare de circulatiei aferente retelei rutiere TEN-T CORE cu efecte negative minime la nivelul mediului si ale ocuparii de terenuri. Imbunatatirea conditiilor de circulatie la nivel de retea rutiera nationala de transport inclusiv sub aspect de siguranta rutiera, reducerea emisiilor poluante, reducerea costurilor de operare, raspunzind astfel cerintelor de dezvoltarea economica concretizata prin adaptarea retelei rutiere nationale la cererea reala de transport. Obiectivul general al proiectului, ca parte din reteaua TEN-T CORE, este imbunatatirea competitivitatii economice a României prin dezvoltarea infrastructurii de transport care faciliteaza integrarea economica in UE, contribuind astfel la dezvoltarea pietii interne cu scopul de a crea conditiile pentru cresterea volumului investitiilor, promovarea transportului durabil si a coeziunii in reteaua de drumuri europene. Realizarea prezentului proiect Completarea Studiului de Fezabilitate pentru Reabilitarea Podului peste bratul Borcea, situat pe Autostrada A2, la km 149+680 si Reabilitarea Podului de la Cernavoda situat pe Autostrada A2, la km 157+600 contribuie la indicatorul de rezultat 2S81 – Cerere de finanțare transmisă, spre analiză și aprobare la Organismul Independent pentru Evaluare. (Romanian)
    0 references
    Ensuring the necessary traffic capacity and corresponding traffic conditions related to the TEN-T CORE road network with minimal negative effects on the environment and land occupation. Improving the traffic conditions at the level of the national road transport network, including road safety, reducing pollutant emissions, reducing operating costs, thus meeting the requirements for economic development realised by adapting the national road network to the real demand for transport. The general objective of the project, as part of the TEN-T CORE network, is to improve Romania’s economic competitiveness by developing transport infrastructure that facilitates economic integration in the EU, thus contributing to the development of the internal market in order to create the conditions for increasing the volume of investments, promoting sustainable transport and cohesion in the European road network. The completion of the Feasibility Study for the Rehabilitation of the Bridge over the Borcea arm, located on Highway A2, at km 149+ 680 and the rehabilitation of the Cernavoda Bridge located on Highway A2, at 157+ 600 km contribute to the result indicator 2S81 – Application for funding submitted for analysis and approval to the Independent Body for Evaluation. (English)
    16 September 2021
    0 references
    Municipiul Feteşti, Romania
    0 references
    Oraş Cernavoda, Romania
    0 references

    Identifiers

    120919
    0 references