No label defined (Q3099158)
Jump to navigation
Jump to search
Project Q3099158 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3099158 in Slovakia |
Statements
3,754,384.59 Euro
0 references
4,416,923.05 Euro
0 references
0.85 percent
0 references
1 December 2016
0 references
1 May 2021
0 references
Stredoslovenská vodárenská spoločnos, a.s.
0 references
Predmetom projektu je intenzifikácia a modernizácia ČOV v aglomerácii Hriňová, ktorú tvorí mesto Hriňová, typické svojim pecifickým roztrateným osídlením, tzv. Hriňovskými lazmi. Napojenos obyvatežstva na vybudovanú stokovú sie v centrálnej časti mesta je 53,69 %, rozírenie kanalizácie siete na lazy je vak v súčasnosti i pre budúcnos neekonomické, preto nie je predmetom projektu. V súčasnosti sú na ČOV privádzané splakové odpadové vody kanalizáciou z centrálnej časti mesta Hriňová a čas splakových vôd z mliekarne Hriňová. Existujúca ČOV má nevyhovujúci systém čistenia s nedostatočným prevzduňovaním technologického procesu, v spojení s nedostatočným objemom aktivácie. V súčasnosti je čistiareň odpadových vôd Hriňová z hžadiska privádzaného znečistenia preaovaná, čo neumoňuje zabezpečenie čistenia vetkých odpadových vôd produkovaných obyvatežstvom v aglomerácii. Splakové vody od 42 % obyvatežov ijúcich v osadách sú zachytávané v umpách, vzhžadom na nepostačujúcu kapacitu súčasnej ČOV, ktorá túto monos obyvatežstvu neposkytuje, vak musia by vyváané do ČOV mimo aglomerácie, najmä Detva a Zvolen. ČOV Hriňová je zaaovaná odpadovými vodami produkovanými v aglomerácii len do takej miery, aby bola schopná tieto čisti v poadovaných parametroch. Z dôvodu nevyhovujúcej kapacity a kvality technológie čistenia, ČOV nie je schopná čisti odpadové vody v plnom rozsahu. Z uvedených dôvodov je preto nutné intenzifikova a modernizova existujúcu ČOV Hriňová tak, aby bolo zabezpečené čistenie komunálnych odpadových vôd ako z centrálnej časti mesta Hriňová, tak aj od ostatných obyvatežov, ktorí nie sú pripojení na kanalizačnú sie z dôvodu nesplnenia ekonomických kritérií, ale nimi produkované odpadové vody zo úmp budú zváané na ČOV.Aby bola vyrieená problematika čistenia odpadových vôd pre vetkých obyvatežov aglomerácie a zabezpečená poadovaná kvalita čistenia odpad. vôd, je navrhnutá jej modernizácia a intenzifikácia na mechanicko biologickú, s nitrifikáciou a samostatnou denitrifikáciou, s úplnou aeróbnou stabilizáciou kalu v čistiacom procese. Rekontrukcia je navrhnutá tak, aby v max. monej miere boli vyuité existujúce objekty ČOV. Realizáciou projektu dôjde k monosti zlepenia čistenia komunálnych odpadových vôd pre obyvatežov celej aglomerácie, meratežný ukazovatež Zvýený počet obyvatežov so zlepeným čistením komunálnych odpad. vôd je 7 413 EO, v súlade s prílohou č. 14. (Slovak)
0 references
The subject of the project is the intensification and modernisation of WWTP in the agglomeration Hriňová, which consists of the town of Hriňová, typical of its specific scattered settlement, so-called Hriňovské Lazmi. The connection of the population on the built-up drain network in the central part of the city is 53.69 %, the extension of the sewer network to the lazy is currently and for the future uneconomic, therefore it is not the subject of the project. Currently, sewage sewage from the central part of the town of Hriňová and the time of sewage from the dairies Hriňová are supplied to the WWTP. An existing WWTP has an unsatisfactory treatment system with insufficient air conditioning of the technological process, coupled with insufficient activation volume. At present, the Hriňová wastewater treatment plant from the scoop of injected pollution is overflowing, which does not allow for the treatment of all waste water produced by the population in the agglomeration. Sewage water from 42 % of inhabitants living in settlements is collected in umps, due to the insufficient capacity of the current WWTP, which does not provide this monos, but must be exported to the WWTP outside the agglomeration, especially Detva and Zvolen. Hriňová WWTP is supplied with waste water produced in the agglomeration only to the extent that it is capable of these treatments in the required parameters. Due to the inadequate capacity and quality of the cleaning technology, the WWTP is not able to purify the waste water in its entirety. For these reasons, it is therefore necessary to intensify and modernise the existing Hriňová WWTP in such a way that urban waste water treatment is ensured both from the central part of the town of Hriňová as well as from other residents who are not connected to the sewer network due to failure to meet economic criteria, but the waste water produced by them will be treated at the WWTP.In order to resolve the issue of waste water treatment for all inhabitants of the agglomeration and to ensure the required quality of waste treatment. it is designed to modernise and intensify to mechanically biological, with nitrification and separate denitrification, with complete aerobic stabilisation of sludge in the cleaning process. The reconstruction is designed to maximise the existing WWTP objects. Implementation of the project will lead to the possibility of improving the treatment of urban waste water for the inhabitants of the whole agglomeration, measuring indicator Increased number of inhabitants with improved urban waste treatment. Water is 7 413 pO, in accordance with Annex 14. (English)
15 September 2021
0 references
Identifiers
310011A023
0 references