Project phase extension and rehabilitation of water and wastewater infrastructure in Hunedoara county (Q3095567)
Jump to navigation
Jump to search
Project Q3095567 in Romania
Language | Label | Description | Also known as |
---|---|---|---|
English | Project phase extension and rehabilitation of water and wastewater infrastructure in Hunedoara county |
Project Q3095567 in Romania |
Statements
52,627,556.09 Romanian Leu
0 references
10,525,511.218000002 Euro
0.2 Euro
13 September 2021
0 references
61,914,771.86 Romanian Leu
0 references
12,382,954.372000001 Euro
0.2 Euro
13 September 2021
0 references
0.85 percent
0 references
1 July 2016
0 references
31 December 2018
0 references
APA PROD S.A.
0 references
Obiectivul general al Proiectului ,, Extinderea si reabilitarea infrastructurii de apa si apa uzata in judetul Hunedoara” îl reprezintă îmbunătăţirea infrastructurii în sectorul de apă si apa uzata in aglomerarile Deva, Hunedoara, Brad, Calan, Hateg si Simeria. Proiectul are ca scop realizarea de investitii in extinderea/reabilitarea infrastructurii de apa potabila si in infrastructura de colectare si epurare a apelor uzate, dupa cum urmeaza: - Alimentare cu apa: construire/reabilitare statii de tratare apa,a rezervoarelor de inmagazinare a apei, a statiilor de clorare si a statiilor de pompare, precum si construirea/reabilitarea conductelor principale si de distributie apa potabila cu toate constructiile accesorii-camine de vane si bransamente; - Apa uzata: construire/reabilitare statii de epurare ape uzate si construire/reabilitare retele de canalizare menajera cu constructii accesorii- statii de pompare apa uzata, camine de vizitare si racorduri. Descrierea tehnica a investitiilor in infrastructura de apa si apa uzata: - Reabilitare Staţie Tratare Apa Potabila Orlea şi aductiune de apă potabilă pentru Haţeg, Călan, Simeria, Deva şi alte 14 localităţi rurale deservite de aductiune; - Reabilitare rezervoare de inmagazinare, extindere/reabilitare aductiuni si reţele de distribuţie, precum şi extinderea/reabilitarea sistemului de colectare a apelor uzate şi reconstrucţia de staţii de epurare a apelor uzate în aglomerarile cu mai mult de 10.000 l.e. – Deva si Hunedoara; - Construire rezervoare de inmagazinare, extindere/reabilitare aductiuni si reţele de distribuţie, precum şi extinderea/reabilitarea sistemului de colectare a apelor uzate şi construcţie staţie de epurare a apelor uzate în aglomerarea Calan cu populatie echivalenta intre 2.000 - 10.000 l.e.; - Reabilitare sursa si Staţie de Tratare Apa Potabila Brad, reabilitare aductiuni, extindere/reabilitare reţele distribuţie, precum şi extinderea/reabilitarea sistemului de colectare a apelor uzate în aglomerarea Brad cu populatie echivalenta intre 2.000 - 10.000 l.e.; - Reabilitare rezervoare de inmagazinare, extindere/reabilitare aductiuni si reţele de distribuţie, precum şi extinderea/reabilitarea sistemului de colectare a apelor uzate şi reconstrucţia de staţii de epurare a apelor uzate în aglomerarile cu populatie echivalenta intre 2.000 - 10.000 l.e.- Hateg si Simeria; Componentele Proiectului: - 10 Contracte de lucrari pentru extinderea si reabilitarea infrastructurii de tratare, inmagazinare si distributie a apei potabile si a infrastructurii de colectare si epurare a apelor uzate in aglomerarile Proiectului; - 3 Contracte de servicii: Asistenta Tehnica pentru Managementul Proiectului si pentru Supervizarea Lucrarilor, precum si servicii pentru Auditul Independent al Proiectului. Principalii indicatori fizici ai Proiectului sunt: - Alimentare cu apa: Extindere retele de distributie: 42,999 km;Reabilitare retele de distributie: 32,535 km;Reabilitarea surselor de apa: (Romanian)
0 references
The general objective of the Project, the extension and rehabilitation of the water and wastewater infrastructure in Hunedoara County" is to improve the infrastructure in the water and wastewater sector in the agglomerations Deva, Hunedoara, Brad, Calan, Hateg and Simeria. The project aims to make investments in the extension/rehabilitation of drinking water infrastructure and in waste water collection and treatment infrastructure, as follows: Water supply: construction/rehabilitation of the water treatment plant, water storage tanks, chloration stations and pumping stations, as well as construction/rehabilitation of main pipes and distribution of drinking water with all constructions of valve-camines and branchings; Wastewater: construction/rehabilitation of wastewater treatment plant and construction/rehabilitation of domestic sewage networks with construction accessories – wastewater pumping stations, visiting rooms and connections. Technical description of investments in water and wastewater infrastructure: Rehabilitation of Water Treatment Plant Potabila Orlea and drinking water supply for Hațeg, Călan, Simeria, Deva and 14 other rural localities served by the aduction; — Rehabilitation of storage tanks, extension/rehabilitation of inputs and distribution networks, as well as extension/rehabilitation of waste water collection system and reconstruction of waste water treatment plants in agglomerations with more than 10,000 p.e. – Deva si Hunedoara; — Construction of storage tanks, extension/rehabilitation of inputs and distribution networks, as well as extension/rehabilitation of the waste water collection system and construction of waste water treatment plant in Calan agglomeration with population equivalent between 2,000-10,000 p.e.; — Rehabilitation of the source and treatment plant of Brad Potable Water, rehabilitation of inputs, extension/rehabilitation of distribution networks, as well as extension/rehabilitation of the waste water collection system in Brad agglomeration with equivalent population between 2,000-10.000 p.e.; — Rehabilitation of storage tanks, extension/rehabilitation of inputs and distribution networks, as well as extension/rehabilitation of waste water collection system and reconstruction of waste water treatment plants in agglomerations with population equivalent between 2,000-10.000 p.e.- Hateg and Simeria; Project Components: — 10 Work contracts for the extension and rehabilitation of the infrastructure for treatment, storage and distribution of drinking water and of the waste water collection and treatment infrastructure in the agglomerations of the Project; 3 Service contracts: Technical Assistance for Project Management and Works Supervision, as well as services for Independent Project Audit. The main physical indicators of the Project are: Water supply: Expansion of distribution networks: 42,999 km;Rehabilitation of distribution networks: 32,535 km;Rehabilitation of water sources: (English)
14 September 2021
0 references
Municipiul Brad, Romania
0 references
Oraş Simeria, Romania
0 references
Oraş Haţeg, Romania
0 references
Oraş Călan, Romania
0 references
Municipiul Hunedoara, Romania
0 references
Municipiul Deva, Romania
0 references
Identifiers
102021
0 references