Reconstruction of the national regional road P62 Krāslava – Preili – Madona section Atashisen – Ljumani (km 104.20-113.40) (bridge) (Q3057644)

From EU Knowledge Graph
Revision as of 12:47, 15 July 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en: translated_label)
Jump to navigation Jump to search
Project Q3057644 in Latvia
Language Label Description Also known as
English
Reconstruction of the national regional road P62 Krāslava – Preili – Madona section Atashisen – Ljumani (km 104.20-113.40) (bridge)
Project Q3057644 in Latvia

    Statements

    0 references
    0 references
    3,551,785.04 Euro
    0 references
    4,178,570.64 Euro
    0 references
    1 June 2016
    0 references
    30 September 2018
    0 references
    Satiksmes ministrija
    0 references
    0 references

    56°38'43.12"N, 26°19'8.80"E
    0 references
    Projekta mērķis ir veikt valsts reģionālā autoceļa P62 Krāslava - Preiļi - Madona posma Atašiene - Ļūmāni (km 104,20 – 113,40), Atašas tilta un Ilzītes caurtekas pārbūves darbus, kas ietver segas izbūvi, būvuzraudzību, autoruzraudzību. Plānotais kopējais projekta īstenošanas ilgums 28 mēneši. Projekta plānotās kopējās izmaksas 4 607 121,82 euro, t.sk. plānotais Eiropas Reģionālās attīstības fonda finansējums – 3 916 053,54 euro un valsts budžeta finansējums – 691 068,28 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts reģionālā autoceļa P62 Krāslava - Preiļi - Madona posma Atašiene - Ļūmāni (km 104,20 – 113,40) – 9,20 km garumā. Projektā ietvertā autoceļa posmu maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. Autoceļš atrodas valsts īpašumā. Nepieciešamības gadījumā vajadzīgie zemes gabali tiks iegādāti. (Latvian)
    0 references
    The aim of the project is to carry out reconstruction works of the national regional road P62 Krāslava – Preili – Madona section Atashien – Lūmani (km 104.20-113.40), the Ataša bridge and the illusion culvert, which include construction of a blanket, construction supervision, author supervision. The total planned duration of the project is 28 months. The planned total cost of the project is EUR 4607121,82, including the planned European Regional Development Fund funding – EUR 3916053.54 and the state budget funding – EUR 691068.28. As a result of the project, the national regional road P62 Krāslava – Preili – Madona section Atashisen – Ljumani (km 104.20-113.40) – 9.20 km will be arranged. The maximum driven axle load of road sections covered by the project will be 11.5 tonnes after the implementation of the project and the maximum uncontrolled vehicle mass will be 44 tonnes. The road is state-owned. If necessary, the necessary plots will be purchased. (English)
    15 July 2021
    0 references
    Atašienes pag., Jēkabpils nov.
    0 references
    Mētrienas pag., Madonas nov.
    0 references

    Identifiers

    6.3.1.0/16/I/001
    0 references