No label defined (Q2982902)

From EU Knowledge Graph
Revision as of 01:44, 9 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The rehabilitation and expansion of the Tondela treatment plant is expected to serve 11,000 inhabitants. Four small sewage treatment plants will also be deactivated, which cause pressure on the body of water, and which prove to be insufficient for the treatment of the waste water generated, which generate quality of water treated with deficit parameters., translated_summary)
Jump to navigation Jump to search
Project Q2982902 in Portugal
Language Label Description Also known as
English
No label defined
Project Q2982902 in Portugal

    Statements

    0 references
    841,029.92 Euro
    0 references
    85.0 percent
    0 references
    1 September 2020
    0 references
    30 November 2022
    0 references
    AINTAR - ASSOCIAÇÃO DE MUNICÍPIOS PARA O SISTEMA INTERMUNICIPAL DE ÁGUAS RESIDUAIS DE CARREGAL DO SAL, SANTA COMBA DÃO, TÁBUA E TONDELA
    0 references
    0 references

    40°30'59.11"N, 8°4'49.91"W
    0 references
    A reabilitação e ampliação da ETAR de Tondela, deverá servir 11.000 habitantes. Serão ainda desativadas quatro ETAR de pequena dimensão, que causam pressão sobre a massa de água, e que se revelam insuficientes para o tratamento das águas residuais geradas, o que geram qualidade de água tratada com parâmetros deficitários. (Portuguese)
    0 references
    The rehabilitation and expansion of the Tondela treatment plant is expected to serve 11,000 inhabitants. Four small sewage treatment plants will also be deactivated, which cause pressure on the body of water, and which prove to be insufficient for the treatment of the waste water generated, which generate quality of water treated with deficit parameters. (English)
    9 July 2021
    0 references
    Tondela
    0 references

    Identifiers

    POSEUR-03-2012-FC-001367
    0 references