No label defined (Q2699431)

From EU Knowledge Graph
Revision as of 17:25, 7 July 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The investment consists of the reconstruction of the nautical marina in Rydlewo, along with the development of the facilities, the area and the main building of the marina. As part of the investment, the required equipment and technical infrastructure, including networks and installations (including water supply, sanitary sewerage in the field of rainwater discharge, electrical installations with lighting, CCTV). The project also assumes the pur...)
Jump to navigation Jump to search
Project Q2699431 in Poland
Language Label Description Also known as
English
No label defined
Project Q2699431 in Poland

    Statements

    0 references
    1,299,999.66 zloty
    0 references
    288,989.92 Euro
    0.2223 Euro
    0 references
    1,529,411.37 zloty
    0 references
    339,988.15 Euro
    0.2223 Euro
    0 references
    85.0 percent
    0 references
    1 January 2021
    0 references
    31 March 2022
    0 references
    GMINA ŻNIN
    0 references
    0 references

    52°50'54.6"N, 17°43'18.8"E
    0 references
    Inwestycja polega na przebudowie przystani żeglarskiej w Rydlewie wraz z zagospodarowaniem zaplecza, terenu oraz budynku głównego przystani.W ramach inwestycji przewidziano do wykonania wymagane wyposażenie i infrastrukturę techniczną, w tym sieci i instalacje (m. in. wodociąg, kanalizacja sanitarna w zakresie odprowadzenia wód opadowych, instalacje elektryczne z oświetleniem, CCTV).Projekt zakłada również zakup wyposażenia niezbędnego do funkcjonowania przystani, w tym narzędzia, łodzie żaglowe, kamizelki asekuracyjne i inne. (Polish)
    0 references
    The investment consists of the reconstruction of the nautical marina in Rydlewo, along with the development of the facilities, the area and the main building of the marina. As part of the investment, the required equipment and technical infrastructure, including networks and installations (including water supply, sanitary sewerage in the field of rainwater discharge, electrical installations with lighting, CCTV). The project also assumes the purchase of equipment necessary for the operation of the marina, including tools, sailboats, safety vests and others. (English)
    7 July 2021
    0 references

    Identifiers

    RPKP.07.01.00-04-0036/20
    0 references