Construction of the sanitary sewage system with construction equipment in Olchowa and Sielec — the agglomeration of Iwierice (Q118891)

From EU Knowledge Graph
Revision as of 10:54, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the sanitary sewage system with construction equipment in Olchowa and Sielec — the agglomeration of Iwierice
Project in Poland financed by DG Regio

    Statements

    0 references
    3,444,945.86 zloty
    0 references
    826,787.01 Euro
    13 January 2020
    0 references
    4,052,877.49 zloty
    0 references
    972,690.6 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    7 September 2016
    0 references
    30 September 2018
    0 references
    GMINA IWIERZYCE
    0 references
    Celem głównym projektu jest zwiększenie liczby gospodarstw domowych z dostępem do sieci kanalizacji sanitarnej. Liczba obiektów planowanych do podłączenia: 359. Termin: wrzesień 2018 r.Cele szczegółowe to 1) Ochrona środowiska naturalnego poprzez eliminację przedostawania się zanieczyszczeń w postaci ścieków do ekosystemu, 2) Ochrona czystości wód powierzchniowych podziemnych oraz ochrona ziemi poprzez zapewnienie odbioru ścieków sanitarnych przez oczyszczalnię, a następnie ich oczyszczenie, 3) Ochrona gleby i powietrza na terenie Gminy, które w zasadniczy sposób oddziałują na otoczenie, 4) Rozwój i poprawa infrastruktury wiejskiej, 5) Zmniejszenia uciążliwości i kosztów związanych z opróżnianiem szamb i indywidualnym wywozem ścieków.Przedmiotowy projekt można podzielić na dwa zakresy:1. Przebudowa istniejącej sieci kanalizacji sanitarnej tłocznej, polegająca na wymianie rur z mniejszych średnic na większe średnice: a) Długość przebudowanej sieci kanalizacyjnej – 2 245 m2. Budowa sieci kanalizacji sanitarnej grawitacyjnej wraz z przyłączami, rurociągami tłocznymi, pompowniami ścieków z ich zasilaniem elektrycznym w miejscowości Olchowa, Sielec - Gmina Iwierzyce. Dodatkowo ze względu na ukształtowanie terenu jedna przepompownia zlokalizowana zostanie przy granicy gminy Iwierzyce na terenie gminy Sędziszów Małopolski. zakres inwestycji obejmuje: a) Budowa przepompowni – 8 szt., b) Budowa kanalizacji grawitacyjnej – 25 202,94 m, c) Budowa kanalizacji tłocznej – 4 643,71 m, d) Liczba wykonanych przyłączy kanalizacyjnych – 359 szt..Inwestycja realizowana jest na terenie aglomeracji Iwierzyce. Aglomeracja wyznaczona została na obszarze Gminy Iwierzyce o równoważnej liczbie mieszkańców 7 234. Lokalizowana została na terenie miejscowości Sielec, Iwierzyce, Nockowa, Wiercany, Olimpów, Wiśniowa, Olchowa, Bystrzyca, Będzienica.Sama inwestycja dotyczy skanalizowania dwóch miejscowości, natomiast obszar oddziaływania projektu to cała gmina Iwierzyce. (Polish)
    0 references
    The main objective of the project is to increase the number of households with access to the sewer network. Number of objects to be connected: 359. Deadline: September 2018 Specific objectives 1) Protection of the environment by eliminating pollution from wastewater into the ecosystem, (2) Protection of groundwater and soil water cleaning by ensuring sewage treatment by the plant and then cleaning them, (3) Protection of soil and air in the municipality with a vital impact on the environment, (4) Development and improvement of rural infrastructure, (5) Reducing the nuisances and costs associated with the emptying of septic tanks and individual waste disposal. the project can be divided into two parts: 1. Alterations to the existing sewerage network, consisting of the replacement of pipes with smaller diameters into larger diameters: (a) Length of the reconstructed sewage system (2 245 m²). Construction of gravity sewerage network with connections, compressor stations, sewage pumping stations with their power supply in Olchowa, Sielec — Gmina Iwierce. In addition, because of the shape of the terrain, one pumping station will be located on the border of the municipality of Iwieszów in the municipality of Sędziszów Małopoli. the scope of the investment consists of: (a) Construction of pumping stations — 8 units, (b) Construction of a gravitational sewage system — 25 202.94 m, (c) Construction of a discharge sewage system — 4 643.71 m, (d) The installation of sewerage connections (359). the investment is carried out in the agglomeration of Iwierka. The agglomeration has been designated in the area of the Municipality of Itrusted with an equivalent population of 7 234. The project is located in the village of Sielec, Iwierice, Nockova, Wiercany, Olimops, Wiśniowa, Olchowa, Bystrzyca, Bedziennica.San investment relates to the channelling of two localities, while the area of impact of the project is the whole municipality of Itrusted. (English)
    0 references

    Identifiers

    RPPK.04.03.01-18-0007/16
    0 references