Demolition of the existing and construction of a new Water Treatment Station in Full and construction of sections of water supply network with connection to the existing water connections at ul. Pioneers in the town of Full and Sarnik, Jagów and Będargowo in the municipality of Rezyczyce (Q137898)

From EU Knowledge Graph
Revision as of 00:20, 23 June 2020 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Demolition of the existing and construction of a new Water Treatment Station in Full and construction of sections of water supply network with connection to the existing water connections at ul. Pioneers in the town of Full and Sarnik, Jagów and Będargowo in the municipality of Rezyczyce
Project in Poland financed by DG Regio

    Statements

    0 references
    3,555,424.79 zloty
    0 references
    853,301.9495999999 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    28 December 2018
    0 references
    31 July 2020
    0 references
    GMINA PEŁCZYCE
    0 references
    Przedmiotem projektu jest modernizacja Stacji Uzdatniania Wody w Pełczycach oraz modernizacja odcinków sieci wodociągowej wraz z przełączeniem istniejących przyłączy wodociągowych przy ul. Pionierów i Starogrodzkiej w mieście Pełczyce oraz w miejscowościach Sarnik, Jagów i Będargowo w gminie Pełczyce. Działania związane ze stacją uzdatniania wody w Pełczycach obejmują swoim zakresem rozbiórkę istniejącej stacji uzdatniania wody oraz budowę nowej stacji uzdatniania wody wraz z infrastrukturą towarzyszącą, a w szczególności: - budowę budynku administracyjno-socjalnego z laboratorium; - budowę budynku techniczno-garażowego; - budowę wiaty wielofunkcyjnej; - zagospodarowanie terenu niezbędne do funkcjonowania SUW; - budowę przyłączy i odcinków sieci infrastruktury technicznej: wodnej, gazowej, ściekowej, elektroenergetycznej, deszczowej wraz z przebudową istniejących elementów infrastruktury technicznej. Powierzchnia kubaturowych obiektów projektowanych to ok. 1200m2. Modernizacja sieci wodociągowej będzie polegała na przebudowie odcinków sieci wodociągowej przy ul. Pionierów i Starogrodzkiej w m. Pełczyce oraz w m. Sarnik, Jagów, Będargowo, a następnie wpięcie ich do istniejących przyłączy, w celu zastąpienia istniejących, zdegradowanych rur wykonanych z azbestocementu oraz stali. Zmodernizowanych zostanie ok. 2324 mb sieci. Realizacja projektu nie wymaga dzielenia na etapy. Poszczególne działania mogą odbywać się niezależnie od siebie. Projekt ma charakter stacjonarny i w całości zostanie zrealizowany na obszarze Województwa Zachodniopomorskiego. (Polish)
    0 references
    The object of the project is the modernisation of the Water Treatment Station in Full and the modernisation of sections of the water supply network with the connection of existing water supply connections at ul. Pioneers in the town of Full and Sarnik, Jagów and Będargowo in the municipality of Rezyczyce. The activities related to the water treatment plant in Full shall cover the demolition of the existing water treatment plant and the construction of a new water treatment plant with accompanying infrastructure, and in particular: Construction of a social and laboratory building; Construction of a technical garage; Construction of multifunctional wind; Land management necessary for the operation of the SUW; Construction of connections and sections of the technical infrastructure network: water, gas, waste water, electricity and rainwater, as well as the construction of existing technical infrastructure. The surface area of the buildings planned to be occupied is approximately the same. 1 200 m². The modernisation of the water supply network will consist of the redevelopment of sections of the water supply network at ul. Pioneers and startle in m. full-bodied, and in m. Sarnik, Jagów, Będargo, and then put them into existing connections, to replace existing, degraded pipes made with asbestos and steel. It will be modernised. 2324 mb of the net. Implementation of the project does not require splitting. Individual actions can take place independently of each other. The project is of a stationary nature and will be carried out in full in the Zachodniopomorskie voivodship. (English)
    0 references

    Identifiers

    RPZP.03.05.00-32-C012/18
    0 references