Reconstruction of GPZ Działdowo to enable the development of renewable energy (Q4427101)

From EU Knowledge Graph
Revision as of 22:32, 21 October 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding translation)
Jump to navigation Jump to search
Project Q4427101 in Poland
Language Label Description Also known as
English
Reconstruction of GPZ Działdowo to enable the development of renewable energy
Project Q4427101 in Poland

    Statements

    0 references
    4,076,419.5 zloty
    0 references
    906,188.05 Euro
    0 references
    4,995,000.0 zloty
    0 references
    1,110,388.5 Euro
    0 references
    81.61 percent
    0 references
    10 June 2022
    0 references
    28 June 2023
    0 references
    ENERGA-OPERATOR SPÓŁKA AKCYJNA
    0 references
    0 references
    Zakres rzeczowy Projektu obejmuje przebudowę stacji elektroenergetycznej GPZ Działdowo zlokalizowanej na terenie działania Oddziału w Płocku ENERGA-OPERATOR SA. Projekt nie został podzielony na zadania. Jest planowany do realizacji w 2022 i 2023 r. na terenie województwa warmińsko-mazurskiego, w mieście Działdowo. Szczegółową lokalizację Projektu ze wskazaniem działki na której realizowany będzie zakres rzeczowy Projektu zaprezentowano w rozdziale 2.4.3 dołączonego do wniosku studium wykonalności. Proponowany zakres inwestycyjny pozwoli zwiększyć możliwości przyłączania do sieci nowych jednostek wytwórczych energii elektrycznej z OZE oraz mikroinstalacji w sposób zapewniający bezpieczeństwo funkcjonowania sieci elektroenergetycznych OSD. W ramach Projektu planuje się: • wymianę transformatorów 110/15 kV o mocy 25MVA na transformatory o mocy 40MVA, • wymianę uziemników punktu zerowego transformatorów, • demontaż istniejących napowietrznych mostów SN od stanowisk transformatorów mocy do rozdzielnicy SN, • przebudowę kanalizacji deszczowej ze względu na kolizję z trasą mostu kablowego, • wykonanie nowych mostów kablowych SN od stanowisk transformatorów mocy do rozdzielnicy SN. W Projekcie nie przewidziano prac związanych z budową, bądź przebudową linii elektroenergetycznych. (Polish)
    0 references
    The material scope of the Project includes the reconstruction of the power station GPZ Działdowo located in the area of operation of the Branch in Płock ENERGA-OPERATOR SA. The project was not divided into tasks. It is planned for implementation in 2022 and 2023 in the Warmińsko-Mazurskie Voivodeship, in the town of Działdowo. The detailed location of the Project with an indication of the plot on which the substantive scope of the Project will be implemented is presented in Chapter 2.4.3 of the feasibility study attached to the application. The proposed investment scope will allow to increase the possibility of connecting new electricity generation units from renewable energy sources and micro-installations to the network in a way that ensures the security of the operation of the DSO’s electricity networks. As part of the project, it is planned to: • replacement of transformers 110/15 kV with 25MVA power transformers with 40MVA power transformers, • replacement of the grounding points of the transformers, • dismantling existing overhead SN bridges from power transformers to SN switchgear, • reconstruction of the rainwater system due to collision with the cable bridge route, • construction of new SN cable bridges from power transformers to SN switchgear stations. The project does not provide for works related to the construction or reconstruction of power lines. (English)
    0 references
    WOJ.: WARMIŃSKO-MAZURSKIE, POW.: działdowski
    0 references

    Identifiers

    RPWM.04.01.00-28-0001/22
    0 references