Transport development in Hajdú-Bihar County T-1 (Q3947450)

From EU Knowledge Graph
Revision as of 10:34, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3947450 in Hungary
Language Label Description Also known as
English
Transport development in Hajdú-Bihar County T-1
Project Q3947450 in Hungary

    Statements

    0 references
    4,391,153.48 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    1,588,000,000 forint
    0 references
    4,882,901.906 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    1,786,236,530.112 forint
    0 references
    88.902169 percent
    0 references
    5 April 2017
    0 references
    14 September 2019
    0 references
    Magyar Közút Nonprofit Zártkörűen Működő Részvénytársaság
    0 references
    0 references

    47°50'42.79"N, 21°25'40.44"E
    0 references
    A projekt keretében mindösszesen 10,588 km hosszon kerül mellékúthálózati szakasz felújításra. A beavatkozás során a meglévő burkolat profilmarását végezzük el, majd kötő és kopóréteg beépítésével alakítjuk ki az új burkolatot. A vízelvezetést a meglévő vízelvezetési rendszer felújításával, jó karba helyezésével biztosítjuk, valamint az útpadka is rendezésre kerül. Az érintett útszakaszokon lévő műtárgyak, átereszek, forgalomtechnikai berendezések szükség szerint felújításra kerülnek. Felújítással érintett szakaszok: 3323 j. ök út (21+450-27+893 kmsz) beavatkozási hossz: 6,443 km közvetve érintett település: Hajdúnánás 4904 j. ök út (7+650-11+795 kmsz) beavatkozási hossz: 4,145 km közvetve érintett település: Nyíracsád A projekt 4-5 számjegyű leromlott állapotú utak felújítását, fejlesztését célozza meg, melynek megvalósulása esetén javul a települések és a térségben lévő munkahelyek elérhetősége, ezzel a munkaerő mobilitást és gazdaságfejlesztést ösztönzi. A beruházások az állami úthálózaton valósulnak meg. Az érintett ingatlanok és tulajdonviszonyai ténylegesen csak a tervezés folyamán határozhatóak meg. A projekt a közúti közlekedésről szóló 1988. I. tv. 8. § (1a) bekezdésével összhangban kerül(t) tervezésre valamennyi érintett közlekedő igényeinek a figyelembevételével. A lakott területen belüli útszakaszok esetében a kerékpáros forgalom biztonságos levezetésének lehetősége megvizsgálásra kerül(t). A beruházás hozzájárul a közlekedésbiztonság javításához, a tervezés és megvalósítás során a közlekedésbiztonsági szempontok kiemelt figyelmet kaptak illetve fognak kapni. A beruházás a Hajdú-Bihar Megyei Területfejlesztési programba illeszkedik. A felújításra kerülő útszakaszok listája a megyei önkormányzattal egyeztetésre, jóváhagyatásra került. A Pályázó szervezeti formájából, továbbá szakértői és intézményi hátteréből adódóan, a projekt pénzügyi fenntarthatósága, illetve a megvalósított tevékenység hosszú távú (5 éves) működtetése és fenntartása biztosított. A projekt műszaki tartalma úgy kerül(t) kialakításra, megtervezésre, hogy javítson a gyalogosok, kerékpárosok, de mindenekelőtt a gyerekek, idősek és fogyatékkal élők közlekedésbiztonságán. A beruházást költséghatékony módon, reális és takarékos költségvetéssel került megtervezésre, illetve kerül megvalósításra. A beruházás közvetlen vagy közvetett gazdaságfejlesztési és foglalkoztatási kapcsolódással valósul meg, valamint elősegíti a munkaerő mobilitás infrastrukturális feltételeit. A felújítandó útszakasz 2 db települést érint. A tervek, engedélyek rendelkezésre állásáról a projekt előkészítettség alpontban számolunk be. A projekt illeszkedik a megyei program prioritásához és beavatkozásához, mivel fejleszti az elérhetőséget, a közlekedési hálózatokat, illetve a közösségi és környezetbarát közlekedést Hajdú-Bihar megyében. A beruházások fejlesztik a helyi ipari park, az M35 autópálya, illetve a Semsey kastély (turisztika, Balmazújváros) elérhetőségét, megközelíthetőségét. Az ipari park érintettsége térképi mellékleten is bemutatásra kerül (mellékelten csatoljuk). (Hungarian)
    0 references
    As part of the project, a section of the secondary road network will be refurbished for a total length of 10.588 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 3323 j. road (21+ 450-27+ 893 kms) intervention length: 6.443 km indirectly affected municipality: Hajdúnánás 4904 j. road (7+ 650-11+ 795 kms) intervention length: 4.145 km indirectly affected municipality: Nyíracsád The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to improving road safety, and road safety aspects have been and will be given special attention to road safety aspects during planning and implementation. The investment is part of the Hajdú-Bihar County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The road section to be refurbished concerns 2 settlements. The availability of plans and permits is reported in the project preparation sub-section. The project is in line with the priority and intervention of the county programme, as it develops accessibility, transport networks and public and environmentally friendly transport in Hajdú-Bihar County. The investments improve the accessibility and accessibility of the local industrial park, the M35 motorway and the Semsey Castle (tourism, Balmazújváros). The involvement of the industrial park is also shown in a map annex (annexed). (English)
    9 February 2022
    0 references
    Hajdúnánás, Hajdú-Bihar
    0 references

    Identifiers

    TOP-1.3.1-15-HB1-2016-00002
    0 references