Construction of production facilities and infrastructure (Q3056698)

From EU Knowledge Graph
Revision as of 18:00, 28 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): Het project heeft tot doel nieuwe productielocaties en infrastructuur te creëren van „Glasersi BT” Ltd. „Priedes” in de parochie van de Babite, Babite County. De handelaar is actief op het gebied van het vormen en verwerken van vlakglas, en de nieuw gecreëerde infrastructuur zal worden gebruikt om haar economische activiteit in deze sector uit te breiden door een efficiënt proces van glasplaat tempering en verwerking in te voeren met het oog op...)
Jump to navigation Jump to search
Project Q3056698 in Latvia
Language Label Description Also known as
English
Construction of production facilities and infrastructure
Project Q3056698 in Latvia

    Statements

    0 references
    476,052.43 Euro
    0 references
    1,057,894.29 Euro
    0 references
    45.0 percent
    0 references
    23 February 2017
    0 references
    22 September 2017
    0 references
    SIA "GLĀZERI BT"
    0 references
    0 references

    56°55'42.31"N, 23°54'39.67"E
    0 references
    Projekta mērķis ir izveidot jaunas SIA "Glāzeri BT" ražošanas telpas un infrastruktūru "Priedēs" Piņķos, Babītes pagasta, Babītes novadā.Komersants darbojas lokšņu stikla formēšanas un apstrādes nozarē, un jaunizveidotā infrastruktūra tiks izmantota, lai uzņēmums paplašinātu savu saimniecisko darbību šajā nozarē, ieviešot efektīvu stikla lokšņu rūdīšanas - apstrādes procesu ar mērķi integrēties globālajās gatavās produkcijas piegāžu ķēdēs.Saskaņā ar apstiprināto būvprojektu tiks veikti šādi būvniecības darbi:Esošo ražošanas telpu pārbūve – 709.1 m2 Jaunu telpu būvniecība – 1795.4 m2, no kurāmRažošanas telpas – 1548.1 m2Administratīvo telpas un veikals – 247.3 m2Ņemot vērā ERAF atbalsta programmas nosacījumus, uzņēmums plāno saņemt līdzfinansējumu esošo ražošanas telpu (709,1 m2) pārbūvei un jauno ražošanas telpu (1548.1 m2) būvniecībai. Kopējā projekta ietvaros plānotā būvdarbu platība –2257.2 m2.Projekta kopējās izmaksas sastāda 1 175 176.97 eiro, no kurām 1 057 894.29.00 eiro ir attiecināmās izmaksas, kuras ir paredzētas jaunās ražošanas ēkas būvniecībai un esošās ražošanas ēkas pārbūvei.ERAF finansējums tiek plānots 45% no attiecināmajām izmaksām 476 052.43 eiro apmērā.Projektā plānotās aktivitātes - būvdarbi ir uzsākti pēc projekta pieteikuma iesniegšanas CFLA š.g. augustā, jo SIA "Glāzeri BT" ir Babītes novada būvvaldē apstiprināts būvprojekts tehniskā projekta stadijā, uzņēmums ir veicis konkursu par būvniecības darbu veikšanu, izvēlējies būvuzņēmēju, ar kuru noslēgts līgums, un saņēmis būvatļauju. Ņemot vērā projekta skaņošanas laiku ar CFLA, tiek plānots, ka līgums ar CFLA par sabiedriskā finansējuma piešķiršanu tiks noslēgts 2017.gada janvārī, tādējādi Projektu tiek plānots realizēt 7 mēnešu laikā pēc līguma noslēgšanas brīža ar CFLA - līdz 2017.gada 31.jūlijam. (Latvian)
    0 references
    The aim of the project is to create new industrial premises and infrastructure of SIA “Glāzeri BT” in “priedes” in Pinki, Babītes parish, Babītes county.Comersants works in sheet glass forming and processing sector, and the newly created infrastructure will be used to expand its economic activity in this sector by introducing efficient glass sheet tempering – processing process in the field of flat glass production and the new infrastructure will be used to expand its business activities in this sector, with the aim to integrate into the global supply chains of finished products, the company will expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chain of finished products, the company will be used to expand its business activities in this field by implementing efficient glass sheet tempering – processing process with the aim to integrate into the global supply chains of finished products, 2 m² will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into the global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet hardening – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process, with the aim of integrating into global supply chains of finished products, the company will use the company to expand its business activities in this sector by introducing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, and the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim of integrating into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate into global supply chains of finished products, the new infrastructure will be used to expand its business activities in this sector by implementing efficient glass sheet tempering – processing process with the aim to integrate in The total construction area planned within the project – 2257.2 m².The total cost of the project is EUR 1 175 176.97, of which 1 057 894.29.EUR 00 is the eligible costs, which are intended for the construction of the new production building and the reconstruction of the existing production building.ERDF funding is planned to 45 % of the eligible costs of EUR 476 052 43.In the project the planned activities – construction works have been started after submitting the project application to CFLA in August, because SIA “Glāzeri BT” has received a construction contract for the construction of the project, which has been concluded with the construction project at the stage of the construction project – construction works have been commenced after the submission of the project application to CFLA in August because SIA “Glāzeri BT” has received the construction contract for the construction of the project and the construction works have been concluded by Babīte Municipality for the construction project. Taking into account the timing of project alignment with CFLA, it is planned that the contract with CFLA on the award of public funding will be concluded in January 2017, thus the Project is planned to be implemented within 7 months after the conclusion of the contract with CFLA – until July 31, 2017. (English)
    15 July 2021
    0 references
    L’objectif de ce projet est de créer de nouveaux locaux de production et d’infrastructures de «Glasersi BT» Ltd. «Priedes» à Pi’dish, paroisse de Babite, comté de Babite. Le négociant opère dans le domaine du formage et du traitement du verre plat, et l’infrastructure nouvellement créée sera utilisée pour développer son activité économique dans ce secteur en introduisant un processus efficace de trempe et de traitement des tôles de verre dans le but d’intégrer dans les chaînes d’approvisionnement mondiales des produits finis. La superficie totale prévue pour la construction du projet s’élève à 2 257,2 m². Le coût total du projet s’élève à 1 175 176,97 EUR, dont 1 057 894,29 EUR sont des coûts éligibles, qui sont destinés à la construction du nouveau bâtiment de production et à la reconstruction du bâtiment de production existant.Le financement du FEDER est prévu pour 45 % des coûts éligibles de 476 052,43 EUR.Les activités prévues dans le projet — travaux de construction ont commencé après la présentation de la demande de projet à la CFCA en août de cette année, car SIA «Glāzeri BT» est un projet de construction approuvé par le conseil de construction de la municipalité de Babite au stade de la conception technique, la société a procédé à l’attribution d’un permis de construction, avec l’adjudicataire d’un contrat de construction. Compte tenu du calendrier du projet avec CFCA, il est prévu que le contrat avec CFCA pour l’octroi d’un financement public soit conclu en janvier 2017, de sorte que le projet devrait être mis en œuvre dans les 7 mois suivant la conclusion du contrat avec l’ACFC — d’ici le 31 juillet 2017. (French)
    25 November 2021
    0 references
    Ziel des Projekts ist die Schaffung neuer Produktionsstätten und Infrastruktur der „Glasersi BT“ Ltd. „Priedes“ in Piņïi, Pfarrei Babite, Kreis Babite. Der Händler ist im Bereich der Flachglasumformung und -verarbeitung tätig, und die neu geschaffene Infrastruktur wird genutzt, um ihre wirtschaftliche Tätigkeit in diesem Sektor durch die Einführung eines effizienten Prozesses der Glasbleche Temperierung und Verarbeitung zu erweitern, um in die globalen Lieferketten der fertigen Produkte zu integrieren. Die geplante Baufläche des Projekts beträgt insgesamt 2 257,2 m².Die Gesamtkosten des Projekts belaufen sich auf 1 175 176,97 EUR, davon 1 057 894,29,00 EUR förderfähige Kosten, die für den Bau des neuen Produktionsgebäudes und den Wiederaufbau des bestehenden Produktionsgebäudes bestimmt sind.Die EFRE-Finanzierung ist für 45 % der zuschussfähigen Kosten in Höhe von 476 052,43 EUR geplant.Die geplanten Tätigkeiten im Projekt – die Bauarbeiten sind nach Einreichung des Projektantrags bei der CFCA im August dieses Jahres begonnen worden, da die SIA „Glāzeri BT“ ein Bauvorhaben ist, das vom Babite Municipality Construction Board im Stadium der technischen Planung genehmigt wurde, und das Unternehmen hat eine Baugenehmigung abgeschlossen. Unter Berücksichtigung des Zeitplans des Projekts mit der CFCA ist geplant, dass der Vertrag mit der CFCA über die Gewährung öffentlicher Mittel im Januar 2017 abgeschlossen wird, sodass das Projekt innerhalb von 7 Monaten nach Abschluss des Vertrags mit der CFCA bis zum 31. Juli 2017 durchgeführt werden soll. (German)
    28 November 2021
    0 references
    Het project heeft tot doel nieuwe productielocaties en infrastructuur te creëren van „Glasersi BT” Ltd. „Priedes” in de parochie van de Babite, Babite County. De handelaar is actief op het gebied van het vormen en verwerken van vlakglas, en de nieuw gecreëerde infrastructuur zal worden gebruikt om haar economische activiteit in deze sector uit te breiden door een efficiënt proces van glasplaat tempering en verwerking in te voeren met het oog op integratie in de mondiale toeleveringsketens van afgewerkte producten. Volgens het goedgekeurde bouwontwerp zal de volgende bouw worden uitgevoerd: heraanleg van productiefaciliteiten — 709,1 m² Nieuwe gebouwen — 1 795,4 m², waarvan Productiegebouwen — 1548,1 m2Administratieve bouwplaatsen. De totale geplande bouwoppervlakte van het project bedraagt 2 257,2 m².De totale kosten van het project bedragen 1 751 776,97 EUR, waarvan 105 789 249,00 EUR subsidiabele kosten, die bestemd zijn voor de bouw van het nieuwe productiegebouw en de wederopbouw van het bestaande productiegebouw.De EFRO-financiering is gepland voor 45 % van de subsidiabele kosten van 476 052,43 EUR.De geplande activiteiten in het project — de bouwwerkzaamheden zijn begonnen na de indiening van de projectaanvraag bij het CFCA in augustus van dit jaar, omdat SIA „Glāzeri BT” een bouwproject is dat is goedgekeurd door de gemeente Babite in het stadium van het technisch ontwerp, de onderneming heeft een opdracht voor de bouw uitgevoerd en de geselecteerde opdrachtnemer is een opdracht voor de bouw uitgevoerd. Rekening houdend met de timing van het project met het CFCA, is het de bedoeling dat het contract met het CFCA voor de toekenning van overheidsfinanciering in januari 2017 wordt gesloten, zodat het project naar verwachting zal worden uitgevoerd binnen zeven maanden na de sluiting van het contract met het CFCA — uiterlijk op 31 juli 2017. (Dutch)
    28 November 2021
    0 references
    Priedaines iela 6, Piņķi, Babītes pag., Mārupes nov., LV-2107
    0 references

    Identifiers

    3.1.1.5/16/A/051
    0 references