Renovation of Anna’s drinking room with the construction of accompanying infrastructure in Żegiestów-Zdrój (Q112873)
Jump to navigation
Jump to search
Project Q112873 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Renovation of Anna’s drinking room with the construction of accompanying infrastructure in Żegiestów-Zdrój |
Project Q112873 in Poland |
Statements
768,688.34 zloty
0 references
1,708,196.33 zloty
0 references
45.0 percent
0 references
1 November 2016
0 references
30 June 2020
0 references
„CECHINI ŻEGIESTÓW-ZDRÓJ GŁÓWNY” SP. Z O.O.
0 references
Aby przywrócić świetność uzdrowisku Żegiestów, konieczne jest wyremontowanie kilku obiektów w tym m.in. Pijalni Anna która jest zamknięta z uwagi na zły stan techniczny budynku. Pijalnia zlokalizowana jest na półn. części uzdrowiska na działce 5805. Obiekt wybudowano w 1945, składa się z części pijalni z ujęciem wody mineralnej przykrytym dachem drewnianym wielospadowym oraz dobudowaną częścią rekreacyjna służąca do spacerów i konsumpcji wody mineralnej. Stąd pijalnia jest budynkiem w kształcie litery L o wym. 32mx12m i 12mx16m. Parametry: powierzchnia zabudowy:666 m2, użytkowa: 532 m2 kubatura: 1.550 m2Projekt obejmie:1. Remont dachu: wymiana pokrycia dachowego z eternitu na blachę dachówkową, zniszczonych obróbek blacharskich z blachy powlekanej, zniszczonych rur spustowych i rynien dachowych, zniszczonego łacenia dachu, zniszczonych elementów konstrukcji dachu, krokwie, płatwie, słupy, murlaty, obicia, podbitki dachu w ilości około 35.2. Remont elewacji kamiennej:wymiana i uzupełnienie zniszczonych elementów kamiennych elewacji, cokołów i murów oporowych, stolarki okiennej i drzwiowej w te same otwory, zniszczonych balustrad stalowych, uzupełnienie ubytków i tynków na elewacji, uzupełnienie i wymiana zniszczonych posadzek tarasowych.3. Remont wewn.: uzupełnienia i wykonanie nowych tynków i malowanie ścian, wymiana i uzupełnienie ścian z kamienia i kamiennej obudowy źródła, zniszczonych instalacji wodkan, C.O i instalacji elektrycznej, wymiana zniszczonych balustrad schodowych.Zakres prac w projekcie jest zgodny z wymogami jakie stawia pijalniom uzdrowiskowym zał. do Rozporządzenia Ministra Zdrowia z 28.07.2005 Źródło http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, zgodnie z którym pijalnie powinny być dostosowane do eksploatacji całorocznej i wyposażone m.in. w instalacje do wydawania i podgrzewania wody, halę spacerową, tablice objaśniające zasady korzystania z urządzeń i charakteryzujące wody. Przewidziano promocję. (Polish)
0 references
In order to restore the splendor of Żegiestów spa, it is necessary to renovate several facilities, including among others. Anna’s drunkard who’s closed because of the poor technical condition of the building. The drinking house is located in the half of the spa on plot 5805. The building was built in 1945, consisting of a part of a drinking room with mineral water intake covered by a multi-fall wooden roof and an additional recreational part for walking and consuming mineral water. Hence, the drinking room is an L-shaped building. 32mx12 m and 12mx16m. Parameters: surface area: 666 m², usable: 532 m² cubicle: 1.550 m2The project will cover:1. Overhaul of the roof: replacement of the roof covering from eternite to tile sheet, damaged sheet metal treatments from sheet metal, damaged drain pipes and roof gutters, damaged roof patching, destroyed roof structure elements, rafters, purlins, columns, murlats, linings, roof linings in the amount of about 35.2. Renovation of the stone facade: replacement and replacement of destroyed stone facade elements, plinths and resistance walls, window and door carpentry with the same holes, destroyed steel balustrades, replenishments and plasters on the facade, supplement and replacement of damaged terrace floors.3. Internal refurbishment: completion and execution of new plasters and wall painting, replacement and replenishment of walls made of stone and stone source housing, destroyed water installations, C.O and electrical installations, replacement of damaged stairway balustrades.The scope of work in the project is in accordance with the requirements which the spa drunks put to use. to the Decree of the Minister of Health from 28.07.2005 Source http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, according to which the halls should be adapted for operation of the year-round and equipped. There’s a promotion planned. (English)
20 October 2020
0 references
Pour restaurer la splendeur du spa de 'egiestów, il est nécessaire de rénover plusieurs objets dont, entre autres. La salle ivre d’Anna, qui est fermée en raison du mauvais état technique du bâtiment. La salle des pompes est située sur la moitié de la zone thermale sur la parcelle 5805. Le bâtiment a été construit en 1945, se compose d’une partie d’une salle de pompes avec une prise d’eau minérale recouverte d’un toit en bois multi pentes et d’une partie récréative intégrée pour les promenades et la consommation d’eau minérale. C’est pourquoi la salle d’ivresse est un bâtiment en forme de L avec un wm. 32mx12 m et 12mx16m. Paramètres: surface zabudowy:666 m², utilisable: Incubation de 532 m²: 1.550 m2Le projet couvrira:1. Remise en état du toit: remplacement de la toiture éternite par une feuille de toiture, traitement des tôles endommagées, tuyaux de vidange endommagés et gouttières de toit, patchage de toit endommagé, éléments de structure de toit endommagés, chevrons, purlins, poteaux, murales, cadres, doublures de toit d’environ 35.2. Rénovation de la façade kamiennej:wymiana et complément des éléments endommagés des façades en pierre, des socles et des murs de soutènement, des menuiseries de fenêtres et de portes dans les mêmes ouvertures, des garde-corps en acier endommagés, la reconstitution des défauts et des plâtres sur la façade, le réapprovisionnement et le remplacement des terrasses endommagées.3. Rénovation interne: compléter et fabriquer de nouveaux plâtres et murs de peinture, remplacer et compléter les murs des logements en pierre et en pierre, les installations hydrocanes endommagées, les installations C.O et électriques, le remplacement des rampes d’escalier endommagées. L’étendue des travaux du projet est conforme aux exigences fixées par les stations de pompage sanitaires jointes au décret du ministre de la Santé du 28.07.2005 Source http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, selon lequel les salles d’eau doivent être adaptées à l’exploitation tout au long de l’année et équipées, entre autres, d’installations pour la délivrance et le chauffage de l’eau, une salle de marche, des tables expliquant les principes d’utilisation des équipements et de caractérisation de l’eau. Une promotion est prévue. (French)
1 December 2021
0 references
Identifiers
RPMP.06.03.01-12-0434/16
0 references