Reconstruction (modernisation) of water treatment station in Góry, commune Markuszów (Q105585)
Jump to navigation
Jump to search
Project Q105585 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction (modernisation) of water treatment station in Góry, commune Markuszów |
Project Q105585 in Poland |
Statements
765,927.57 zloty
0 references
901,091.26 zloty
0 references
85.0 percent
0 references
8 June 2015
0 references
15 December 2017
0 references
GMINA MARKUSZÓW
0 references
Przedmiotem jest przebudowa(modernizacja) budynku SUW w m. Góry wraz z zainstalowaniem nowych urządzeń do przesyłu i uzdatniania wody. Stacja obsługuje 790 mieszkańców, 4 przedsiębiorstwa, 2 bud. użyt. pub. z terenu 4 miejscowości. Budynek jest w b. złym stanie techn. Stare rurociągi ulegają awariom, woda złej jakości. Zakres projektu: *przebudowa i modernizacja budynku SUW(w tym m.in.: wymiana dachu, okien i drzwi, docieplenie, likwidacja kotłowni węglowej- na ogrzewanie elektryczne i adaptacja pomieszczenia na chlorownię), wymiana ogrodzenia, utwardzenie działki; *instalacje sanitarne wew., w tym:-montaż urządzeń technolog. w budynku(m.in.: zestawy: aeracji, filtracyjny, dmuchawy, chloratora, sprężarka, rozdzielnia pneumatyczna i technologiczna, zestaw hydroforowy+pompa płuczna); -węzeł sanitarny; -urządzenia sanit. i dezynfekujące; *instalacje elektr. wew.; *roboty sanitarne zew.:-wymiana części urządzeń zew.(m.in. na studniach, odstojniku); -budowa zbiornika bezodpływowego ścieków z chlorowni; -wymiana części urządzeń na zbiorniku retencyjnym i budowa drugiego zbiornika reten.; przebudowa rurociągów zew.; *przebudwa przyłącza elektroenergetycznego. Nie zmieni się ujęcie wody ani max. ilość pobieranej wody. Woda ze studni kierowana do zestawu aeracji I stopnia. Proces aeracji odbywa się w aeratorze ciśnieniowym. Po napowietrzeniu, woda poddawana procesowi filtracji jednostopniowej w procesie odżelazienia na złożu kwarcowo-katalitycznym. Następnie-retencja w zbiornikach wyrównawczych. Pompowanie wody do sieci wodociągowej-za pomocą zestawu hydroforowego (pompownia II stopnia). Okresowa dezynfekcja-poprzez dozowanie roztworu podchlorynu sodu do wody płynącej do sieci wodociągowej. Stacja wodociągowa w pełni zautomatyzowana. Uruchomiony serwis dla użytkowników do transakcji on-line (możliwość sprawdzenia stanu liczników na wodę, rozliczenia wody, przesyłanie stanu liczników do działu sprzedaży, formularze do wyrażania opinii, uwag, skarg) (Polish)
0 references
The subject matter is the reconstruction (modernisation) of the SUW building in Góra with the installation of new equipment for water transfer and treatment. The station serves 790 inhabitants, 4 companies, 2 building. pub. from the area of 4 villages. The building is in bad condition techn. Old pipelines fail, water of poor quality. Scope of the project: *construction and modernisation of the SUW building (including: replacement of the roof, windows and doors, warming, decommissioning of the coal boiler- for electrical heating and adaptation of the room to the chlorine plant), replacement of fences, curing of the plot; * sanitary installations, including:-assembly of technologist equipment in the building(e.g.: sets of: aeration, filtration, blowers, chlorator, compressor, pneumatic and technological switchboard, hydrophore unit+pulmonary pump); —a sanitary node; — sanitary and disinfecting devices; *electric installations; * sanitary robots called:-Replacement of parts of the call equipment(e.g. on wells, repository); — construction of a waste water tank from a chlorine plant; — replacement of parts of equipment on the retention tank and construction of the second reten tank; reconstruction of the pipelines; *construction of the power connection. There will be no change in the intake of water or max. the amount of water drawn. Water from the well directed to a set of first-degree aerations. The aeration process is carried out in a pressure aerator. After aeration, water undergoes a single-stage filtration process by deferring on a quartz-catalytic deposit. Then-retention in compensating tanks. Pumping water into the water supply system – using a hydrophore set (second-degree pumping station). Periodic disinfection-by dispensing sodium hypochlorite solution into water flowing into the water supply line. The water supply station is fully automated. Running service for users for online transactions (it is possible to check the state of water meters, water billing, transfer of meter status to the sales department, forms for expressing opinions, comments, complaints) (English)
17 October 2020
0 references
L’objet est la reconstruction (mise à niveau) du bâtiment SUW dans la ville de montagne avec l’installation de nouveaux équipements pour la transmission et le traitement de l’eau. La station dessert 790 habitants, 4 entreprises, 2 bâtiments utilisant le pub. de la région de 4 villages. Le bâtiment est en mauvais état technique. Les vieux pipelines échouent, l’eau est de mauvaise qualité. Portée du projet: *reconstruction et modernisation du bâtiment SUW (y compris: le remplacement du toit, des fenêtres et des portes, le réchauffement, le déclassement de la chaudière au charbon pour le chauffage électrique et l’adaptation de la pièce en usine de chlore), le remplacement des clôtures, le durcissement de la parcelle; *installations sanitaires, y compris:-installation d’équipements technologiques dans le bâtiment (par exemple: ensembles: aération, filtration, ventilateur, chlorateur, compresseur, appareil de commutation pneumatique et technologique, hydrophore + pompe à rinçage); —nœud sanitaire; —équipements sanitaires et de désinfection; *installations électriques; *travaux sanitaires, y compris:-remplacement de parties d’appareils (par exemple sur les puits, détachement); —construction d’un réservoir non d’effluent à partir de l’usine de chlore; le remplacement des pièces de l’équipement sur le réservoir de rétention et la construction d’un second réservoir de rétention. reconstruction d’autres pipelines; *reconstruction de la connexion électrique. La prise d’eau et la quantité maximale d’eau absorbée ne changeront pas. Eau du puits dirigé au premier degré d’aération. Le processus d’aération a lieu dans un aérateur de pression. Après l’aération, l’eau soumise à un processus de filtration à un seul stade dans le processus de report sur un lit de quartz-catalytique. Puis-réservation dans des citernes compensatoires. Pompage de l’eau dans les conduites d’eau — à l’aide d’un ensemble d’hydrophore (station de pompage du deuxième degré). Désinfection périodique — par l’administration d’une solution d’hypochlorite de sodium dans l’eau qui s’écoule dans le réseau d’approvisionnement en eau. La station d’alimentation en eau est entièrement automatisée. Service courant pour les utilisateurs pour les transactions en ligne (possibilité de vérifier l’état des compteurs d’eau, facturation de l’eau, envoi de l’état des compteurs au service des ventes, formulaires pour exprimer des opinions, commentaires, plaintes) (French)
1 December 2021
0 references
Identifiers
RPLU.06.04.00-06-0007/15
0 references