Preserving and protecting the environment, promoting the efficient management of water resources and preventing and managing flood risk, by improving the safety of the Auschwitz Node. (Q85102)

From EU Knowledge Graph
Revision as of 16:36, 30 November 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’investissement visant à améliorer la sécurité du carrefour Oświęcim protégera 32,66 km² de zone de risque d’inondation et protégera env. 11 790 personnes, y compris celles qui ont précédé l’inondation du musée d’État d’Auschwitz-Birkenau à Oświęcim (près de 200 ha) Les objectifs ci-dessus seront atteints par: un bourgeon. 1 dispositifs de protection contre l’eau. (station de pompage sur le ruisseau Pławianka), reconstruction. 1 équipement pour...)
Jump to navigation Jump to search
Project Q85102 in Poland
Language Label Description Also known as
English
Preserving and protecting the environment, promoting the efficient management of water resources and preventing and managing flood risk, by improving the safety of the Auschwitz Node.
Project Q85102 in Poland

    Statements

    0 references
    66,578,276.06 zloty
    0 references
    15,978,786.25 Euro
    13 January 2020
    0 references
    78,327,383.61 zloty
    0 references
    18,798,572.07 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2021
    0 references
    PAŃSTWOWE GOSPODARSTWO WODNE WODY POLSKIE KRAJOWY ZARZĄD GOSPODARKI WODNEJ - REGIONALNY ZARZĄD GOSPODARKI WODNEJ W KRAKOWIE
    0 references
    0 references
    0 references
    Inwestycja dotycząca poprawy bezpieczeństwa Węzła Oświęcimskiego pozwoli na ochronę 32,66 km2 pow. zagroż. powodzią oraz ochronę ok. 11 790 os. w tym zabezp. przed powodzią Państwowe Muzeum Auschwitz-Birkenau w Oświęcimiu (pow. prawie 200 ha.) Powyższe cele osiągnięte zostaną poprzez: bud. 1 urządzenia do celów ochrony przeciwpow. (pompowni na potoku Pławianka), przebud. 1 urządzenia do celów ochrony ppow. (rozbud. zbiornika retencyjno-wyrównawczego na Potoku Gromieckim wraz z rozbud. pompowni Gromiec), bud. 0,380 km nowych wałów ppow. oraz przebud. 9,504 km wałów już istniejących. (Polish)
    0 references
    The investment on improving the safety of the Auschwitz Node will allow protection of 32,66 km² of flood risk area and protection of approx. 11 790 people including the protection before the flood The Auschwitz-Birkenau State Museum in Oświęcim (almost 200 ha above) will be achieved by: bud, it’s Bud. 1 fire protection devices. (the pumping station on the river basin), refurbishment. 1 devices for protection purposes ppow. (expansion of the retency and equatorial tank at the Gromiecki stream with the expansion of the Gromiec pumping station), ed. 0.380 km of new shafts and refurbishment. 9.504 km of existing shafts. (English)
    14 October 2020
    0 references
    L’investissement visant à améliorer la sécurité du carrefour Oświęcim protégera 32,66 km² de zone de risque d’inondation et protégera env. 11 790 personnes, y compris celles qui ont précédé l’inondation du musée d’État d’Auschwitz-Birkenau à Oświęcim (près de 200 ha) Les objectifs ci-dessus seront atteints par: un bourgeon. 1 dispositifs de protection contre l’eau. (station de pompage sur le ruisseau Pławianka), reconstruction. 1 équipement pour la protection de PPOW. (extension du réservoir de rétention et de compensation sur le ruisseau Gromiecki ainsi que l’extension de la station de pompage Gromiec), construction. 0,380 km de nouveaux puits et reconstruction. 9,504 km de puits existants. (French)
    30 November 2021
    0 references

    Identifiers

    POIS.02.01.00-00-0024/17
    0 references