Energy modernisation of 9 buildings of the Provincial Hospital for Nervous and Psychically Sick in Lubiąż (Q95470)

From EU Knowledge Graph
Revision as of 23:10, 30 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q95470 in Poland
Language Label Description Also known as
English
Energy modernisation of 9 buildings of the Provincial Hospital for Nervous and Psychically Sick in Lubiąż
Project Q95470 in Poland

    Statements

    0 references
    2,438,875.84 zloty
    0 references
    585,330.20 Euro
    13 January 2020
    0 references
    2,869,265.7 zloty
    0 references
    688,623.77 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    25 April 2016
    0 references
    31 December 2017
    0 references
    WOJEWÓDZKI SZPITAL DLA NERWOWO I PSYCHICZNIE CHORYCH W LUBIĄŻU
    0 references
    0 references
    Przedmiotem projektu jest modernizacja energetyczna 9 budynków Wojewódzkiego Szpitala dla Nerwowo i Psychicznie Chorych w Lubiążu obejmująca: a)docieplenie przegród zewnętrznych i zapewnienie obecnie wymaganego oporu cieplnego;b)wymianę okien na bardziej szczelne;c) wprowadzenie wentylacji kontrolowanej z zastosowaniem nawiewników;d)montaż perlatorów i zaworów termostatycznych oraz liczników jako elementów systemu zarządzania energią. Ponadto przewiduje się zorganizowanie w ramach umowy z wykonawcą robót budowlanych szkoleń z obsługi urządzeń/systemów zarządzania energią dla osób stale korzystających z budynków (aby możliwe było osiągnięcie i utrzymanie zakładanych oszczędności energii).Przeprowadzenie działań ujętych w projekcie w sposób wyczerpujący zapewni osiągnięcie celów projektu. Inwestycja ma charakter kompleksowy, tj. zawiera wszystkie obowiązkowe komponenty: termomodernizacyjny z uzyskaną minimalną wymaganą oszczędnością energii w każdym budynku, zarządzania energią (montaż termostatów, perlatorów oraz liczników w każdym budynku) i komponent edukacyjny (szkoleniowy) – odniesienie się do kryterium kompleksowości modernizacji energetycznej budynku. Łącznie realizacja projektu pozwoli na zmniejszenie zapotrzebowania na ciepło o 10 910 GJ/rok, co daje średnią oszczędność energii dla wszystkich budynków na poziomie 28,74%, a także pozwoli na zredukowanie niskiej emisji gazów cieplarnianych i pyłów do atmosfery o ponad 5 ton na rok pyłów zawieszonych (PM 10g/GJ: 5 018 600) oraz redukcję CO2 o 1036 ton/rok. W każdym budynku oszczędność zapotrzebowania ciepła wyniesie powyżej 25%.Beneficjentem, Inwestorem i Operatorem projektu jest Wnioskodawca. Projektem będzie zarządzał powołany przez Dyrektora Szpitala Zespół Projektowy. Realizacja projektu przebiegać będzie zgodnie z polityką konkurencji i zamówień publicznych. (Polish)
    0 references
    The subject of the project is the energy modernisation of 9 buildings of the Provincial Hospital for Nervous and Psychically Sick in Lubiąż, including: a)warming of external bulkheads and providing the currently required heat resistance;b)exchange of windows into more tight;c) introducing controlled ventilation using vents;d)assembly of thermostatic perlators and valves and meters as components of the energy management system. In addition, it is envisaged to organise, within the framework of a contract with the contractor, training in the operation of energy management equipment/systems for permanent users of buildings (in order to achieve and maintain the expected energy savings).The implementation of activities included in the project in a comprehensive manner will ensure that the project objectives are achieved. The investment is comprehensive, i.e. it contains all the mandatory components: thermal retrofitting with the achieved minimum required energy savings in each building, energy management (assembly of thermostats, perlators and meters in each building) and the educational component (training) – refers to the criterion of the complexity of energy modernisation of the building. In total, the project will reduce the demand for heat by 10 910 GJ/year, resulting in an average energy saving for all buildings of 28.74 %, and will reduce the low emissions of greenhouse gases and dust into the atmosphere by more than 5 tonnes per year of particulate matter (PM 10 g/GJ: 5 018 600) and a CO2 reduction of 1036 tonnes/year. In each building, the saving of heat demand will be above 25 %.Beneficiary, Investor and Operator of the project is the Applicant. The project will be managed by a Project Team appointed by the Hospital Director. The project will be implemented in accordance with competition policy and public procurement. (English)
    15 October 2020
    0 references

    Identifiers

    RPDS.03.03.01-02-0002/16
    0 references