Implementation of energy efficiency improvement measures for building Merķeļa iela 4, Riga (Q3057049)

From EU Knowledge Graph
Revision as of 20:10, 25 November 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in fr: translated_label)
Jump to navigation Jump to search
Project Q3057049 in Latvia
Language Label Description Also known as
English
Implementation of energy efficiency improvement measures for building Merķeļa iela 4, Riga
Project Q3057049 in Latvia

    Statements

    0 references
    0 references
    2,533,748.0 Euro
    0 references
    2,980,880.0 Euro
    0 references
    85.0 percent
    0 references
    6 November 2019
    0 references
    31 October 2022
    0 references
    Valsts sabiedrība ar ierobežotu atbildību "Rīgas cirks"
    0 references
    0 references

    56°56'57.95"N, 24°7'9.62"E
    0 references
    Valsts sabiedrība ar ierobežotu atbildību “Rīgas cirks” (turpmāk – VSIA) ir Kultūras ministrijai piederoša kapitālsabiedrība, kuras pamatmērķis ir pildīt valsts pārvaldes deleģētos uzdevumus kultūras jomā, īstenot izglītojošas un sociālas programmas sabiedrības izglītošanai un integrācijas procesu veicināšanai, popularizēt Latvijas cirka mākslas sasniegumus ārvalstīs un apgūt starptautisko pieredzi cirka mākslas jomā.VSIA savu saimniecisko, administratīvo un radošo darbību vēsturiski ir organizējusi ēku kompleksā un pieguļošajā teritorijā Merķeļa ielā 4, Rīgā – Kultūras ministrijai piederošā un bezatlīdzības lietošanai VSIA nodotā nekustamajā īpašumā, tomēr cirka ēkas sliktā tehniskā stāvokļa dēļ cirka izrādes tajā vairs nenotiek kopš 2016. gada februāra.Šī projekta mērķis ir veikt energoefektivitātes veicinošus pasākumus cirka ēkā Merķeļa ielā 4, Rīgā, tādejādi ievērojami uzlabojot ēkas tehnisko stāvokli un vienlaikus būtiski samazinot nepieciešamo enerģijas patēriņu ēkas siltumnoturības nodrošināšanai.Projektā galvenās darbības saistītas ar ēkas energoefektivitātes celšanu – bēniņu pārsegumu un kupola siltināšana, centralizētas ventilācijas sistēmas ierīkošana, pagalma fasādes sienu siltināšana, esošo logu un durvju nomaiņa, apkures sistēmas un siltummezgla pārbūve un modernizācija, elektroapgādes sistēmas atjaunošana un modernizēšana.Projekta īstenošanas laiks: 36 mēneši no līguma par projekta īstenošanu noslēgšanas, indikatīvi līdz 2022.gada 31.oktobrim.Projekta attiecināmās izmaksas: 2’980’880,00 EUR, pieprasītais ERAF līdzfinansējums: 2 533 748,00 EUR (ar atbalsta intensitāti – 85%).Projekta ietvaros pēc energoefektivitātes paaugstināšanas pasākumu īstenošanas plānots sasniegt enerģijas samazinājumu 298,08 MWh/gadā, savukārt īpatnējais enerģijas patēriņš ēkas apkurei nepārsniegs 89,10 kWh/m2 gadā.Aprēķinātais siltumnīcefekta gāzu samazinājums74,33 CO2 ekvivalenta tonnas / gadā. (Latvian)
    0 references
    The State limited liability company “Rīgas cirks” (hereinafter – VSIA) is a capital company owned by the Ministry of Culture, the main purpose of which is to fulfil the tasks delegated by the state administration in the field of culture, to implement educational and social programmes for public education and promotion of integration processes, to popularise the achievements of Latvian circus art and to gain the international experience in the circus of the circus.Time of the commutation of the building in the field of energy implementation.The modernisation of the building in the building complex and the adjacent area of the building, the commutation of the building, the circumference of the building, and the commutation of the building in the constituency of the 2016th.The objective of constituency of the building in the constituency of the building is reduced by reducing its economic, administrative and creative activities in the building complex and in the adjacent territory of the Merkel on the 4th of the commutation, and to acquire the international experience in the field of circus art.The modernisation of the project of circus in the field of energy, the modernisation of its economic, administrative and creative activities in the building complex and in the adjacent territory of the Merkel on 4th Merkel, the circus of the Ministry of Culture, and the related energy status of the building is no longer related to the energy efficiency of the building, to reduce the illusion of the building in the building complex and in the adjacent territory of the Merķe on the technical territory of Merkela street 4, Riga to the Ministry of Culture, and to acquire the international experience in the field of circus art.The modernisation of the building’s design is the time of consuming its economic, administrative and creative activities in the building complex and in the adjacent territory of the silķe on the technical territory of the Merķe, and to acquire the international experience of the circus in the field of art.The term of commuting in the field of consumables is to bring down its economic, administrative and creative activities in the context of the building complex and the adjacent territory of the silkela street, to promote the achievements of Latvian circus art, and to acquire the international experience of the circus in the field of energy.The modernisation of the building in the field of energy implementation in the 2016th time of the building, and the commutation of the building in the building complex and the memorable territory of the silke on the technical territory of the Merkela, as well as to acquire international experience in the field of circus art.The replacement of the building in the field of energy in the field of constituencies and administrative and creative activities has historically organised its economic, administrative and creative activities in the building complex and the adjacent territory in the silke of the building in the 4 Merkela Street, and to acquire the international experience in the field of circus art.The replacement of the project of the circumference in constituency of the building in the field of energy, reducing its economic, administrative and creative activities in the building complex and the memorable territory of the silkel on the technical territory of the Merkela Street, and to acquire the international experience of the circus in the field of energy.The replacement of the commuting of the building in the 2016th and the constituency of the building in the field of energy, with the aim of reducing its economic, administrative and creative activities in the building complex and the memorable territory of the building in the 4th Merkela Street, and to gaining the international experience in the field of circus art, the restoration of the energy of the building 36 months from the conclusion of the contract on project implementation, indicative until October 31, 2022.The eligible costs of the project: EUR 2‘980’880,00, ERDF co-financing requested: Within the project, after the implementation of energy efficiency improvement measures, it is planned to achieve energy reduction of 298.08 MWh/year, while the specific energy consumption for heating of the building will not exceed 89.10 kWh/m² per year.The estimated greenhouse gas reduction of 74.33 CO2 equivalent tonnes/year. (English)
    15 July 2021
    0 references
    Merķeļa iela 4, Rīga, LV-1050
    0 references

    Identifiers

    4.2.1.2/18/I/062
    0 references