(A19_069_2015_0690122_218) FACTORY REALLOCATION VIA TOOLS MANAGEMENT AND NAVIGATION (Q2065747)
Jump to navigation
Jump to search
Project Q2065747 in Italy
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_069_2015_0690122_218) FACTORY REALLOCATION VIA TOOLS MANAGEMENT AND NAVIGATION |
Project Q2065747 in Italy |
Statements
57,979.78 Euro
0 references
115,959.56 Euro
0 references
50.0 percent
0 references
4 June 2015
0 references
18 April 2018
0 references
4 June 2018
0 references
COSTRUZIONI NOVICROM S.R.L.
0 references
COSTRUZIONI NOVICROM (CN) OPERA NELLA MECCANICA DI PRECISIONE PER PICCOLI LOTTI DI ELEVATA QUALIT? PER AUTOMOTIVE ED AVIATION. L?OBIETTIVO DEL PROGETTO FRONTMAN ? DI REALIZZARE UN FORTE AVANZAMENTO DELLA QUALIT? ED EFFICIENZA DEL PROCESSO DI PRODUZIONE TRAMITE LA RIDUZIONE DEGLI SCARTI CON L?AUMENTO DI AFFIDABILIT? E RIPETIBILIT??, RIDUZIONE DEGLI ERRORI UMANI, RIDUZIONE DEI COSTI DI PRODUZIONE, DEI TEMPI DI ATTREZZAGGIO, DEI TEMPI DI CARICAMENTO DEI PROGRAMMI DI LAVORAZIONE SULLE MACCHINE ROBOTIZZATE. I TEMPI MACCHINA NON SONO ABBATTIBILI SE NON CAMBIANDO MACCHINE O SOLUZIONI, MA I TEMPI MORTI DI CARICAMENTO UTENSILI, ATTREZZAGGIO, ETC. SONO UNA FETTA CONSISTENTE DEI TEMPI DI PRODUZIONE, VISTO CHE LA PRODUZIONE CONSISTE PRINCIPALMENTE IN PICCOLE E PICCOLISSIME SERIE, PEZZI UNICI. I TEMPI DI CAMBIO VANNO RIDOTTI AL MINIMO E LA GENERAZIONE DI PEZZI DIFETTOSI, CHE COMPORTANO TEMPO MACCHINA E UOMO PER IL LORO RECUPERO O REMAKE, VA RIDOTTA A 0. ALCUNI PUNTI CHIAVE PER L?AUMENTO DELL?EFFICI (Italian)
0 references
DOES THE CONSTRUCTION OF NOVICROM (CN) CONSTRUCTION WORK IN THE PRECISION MECHANICS FOR SMALL BATCHES OF HIGH QUALITY BATCHES? FOR AUTOMOTIVE AND AVIATION. THE OBJECTIVE OF THE PROJECT ON THE FRONT MAN? TO MAKE A MAJOR STEP FORWARD? AND EFFICIENCY OF THE PRODUCTION PROCESS THROUGH REDUCTION OF WASTE WITH L? INCREASE OF AFFIDABILIT? AND REPETITION?? REDUCTION OF HUMAN ERRORS, REDUCTION OF PRODUCTION COSTS, TIME TO EQUIP, TIME TO UPLOAD WORK PROGRAMMES ON ROBOTIC MACHINES. THE PROCESSING TIMES ARE NOT THE SAME IF NOT CHANGING MACHINERY OR SOLUTIONS, BUT THE TIME SPENT LOADING TOOLS, EQUIPMENT, ETC. ARE A SIGNIFICANT PART OF THE TIME OF PRODUCTION, SINCE PRODUCTION CONSISTS MAINLY OF SMALL AND VERY SMALL SERIES, WHICH ARE UNIQUE. THE CHANGEOVER TIME MUST BE REDUCED TO A MINIMUM AND THE GENERATION OF DEFECTIVE PARTS, WHICH CARRIES A MACHINE AND A MAN FOR RECOVERY OR REMAKE, MUST BE REDUCED TO 0. KEY POINTS FOR L? INCREASE OF? (English)
0 references
CONSTRUCTIONS NOVICROM (CN) OPÈRE EN MÉCANIQUE DE PRÉCISION POUR DE PETITS LOTS DE HAUTE QUALITÉ? POUR L’AUTOMOBILE ET L’AVIATION. L’OBJECTIF DU PROJET FRONTMAN? POUR ATTEINDRE UNE FORTE AMÉLIORATION DE LA QUALITÉ? ET L’EFFICACITÉ DU PROCESSUS DE PRODUCTION EN RÉDUISANT LES DÉCHETS AVEC UNE FIABILITÉ ACCRUE? ET RÉPÉTABILITÉ?RÉDUCTION DES ERREURS HUMAINES, RÉDUCTION DES COÛTS DE PRODUCTION, TEMPS D’ÉQUIPEMENT, TEMPS DE CHARGEMENT DES PROGRAMMES D’USINAGE SUR DES MACHINES ROBOTISÉES. LES TEMPS DE LA MACHINE NE SONT PAS PLIABLES SAUF EN CHANGEANT DE MACHINES OU DE SOLUTIONS, MAIS LES TEMPS MORTS DE CHARGEMENT DES OUTILS, DES ÉQUIPEMENTS, ETC. SONT UNE PARTIE SUBSTANTIELLE DES TEMPS DE PRODUCTION, CAR LA PRODUCTION SE COMPOSE PRINCIPALEMENT DE PETITES ET TRÈS PETITES SÉRIES, PIÈCES UNIQUES. LES TEMPS DE CHANGEMENT DOIVENT ÊTRE RÉDUITS AU MINIMUM ET LA PRODUCTION DE PIÈCES DÉFECTUEUSES, QUI IMPLIQUENT LE TEMPS DE LA MACHINE ET DE L’HOMME POUR LEUR RÉCUPÉRATION OU LEUR REMAKE, DEVRAIT ÊTRE RÉDUITE À 0. QUELQUES POINTS CLÉS POUR ACCROÎTRE L’EFFICACITÉ (French)
16 December 2021
0 references
Identifiers
D52C15000580009
0 references