No label defined (Q77322)

From EU Knowledge Graph
Revision as of 10:10, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    0 references
    2,243,464.41 Euro
    0 references
    2,492,738.23 Euro
    0 references
    90.0000001203 percent
    0 references
    1 January 2018
    0 references
    31 December 2019
    0 references
    THE ROAD MAINTENANCE COMPANY IN BREST
    0 references
    0 references

    52°4'30.0"N, 23°9'59.8"E
    0 references
    The implementation of automatic traffic management systems (ATMs) is the aim of the project in Brest. The introduction of ATMs will reduce the time of traffic working in the streets of Brest, with subsequent access to the TRANS-European corridor II (E- 30). It is expected to increase the capacity of the road network up to 15 - 20%, to reduce the accident rate by 10 - 15%, to reduce driving period by 10 to 15%, to increase transit attraction. The project in Biala Podlaska consists of the reconstruction of the crossroads Terebelska street and national road no 2, and reconstruction of the crossroads Solidarnosci avenue and national road no 2. The section of national road no 2 from Terebelska street till Solidarnosci avenue is used by both transit traffic and local traffic within the city of Biala Podlaska. The crossroad national road no 2 and Solidarnosci avenue is very serious place of traffic accidents. If the project receive funds, there will be built there a roundabout, in other case there will be installed a cheaper and less efficient alternative a traffic lights. The implementation of the project in Biala Podlaska will result in decrease of travel time by 18%. (Polish)
    0 references
    The implementation of automatic traffic management systems (ATMs) is the aim of the project in Brest. The introduction of ATMs will reduce the time of traffic working in the streets of Brest, with subsequent access to the TRANS-European corridor II (E-30). It is expected to increase the capacity of the road network up to 15-20 %, to reduce the accident rate by 10-15 %, to reduce driving period by 10 to 15 %, to increase transit attraction. The project in Biala Podlaska consists of the reconstruction of the crossroads Terebelska street and national road no 2, and reconstruction of the crossroads Solidarnosci avenue and national road no 2. The section of national road no 2 from Terebelska street till Solidarnosci avenue is used by both transit traffic and local traffic within the city of Biala Podlaska. The crossroad national road no 2 and Solidarnosci avenue is very serious place of traffic accidents. If the project receive funds, there will be built there a roundabout, in other case there will be installed a cheaper and less efficient alternative a traffic lights. The implementation of the project in Biala Podlaska will result in decrease of travel time by 18 %. (English)
    14 October 2020
    0 references

    Identifiers

    PLBU.02.01.00-BY-0145/17
    0 references