Refurbishment of pijni Anna together with construction of an infrastructure accompanied by Żegiestane-Zdrój (Q112873)

From EU Knowledge Graph
Revision as of 09:41, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Refurbishment of pijni Anna together with construction of an infrastructure accompanied by Żegiestane-Zdrój
Project in Poland financed by DG Regio

    Statements

    0 references
    768,688.34 zloty
    0 references
    184,485.20 Euro
    13 January 2020
    0 references
    1,708,196.33 zloty
    0 references
    409,967.12 Euro
    13 January 2020
    0 references
    45.0 percent
    0 references
    1 November 2016
    0 references
    30 June 2020
    0 references
    „CECHINI ŻEGIESTÓW-ZDRÓJ GŁÓWNY” SP. Z O.O.
    0 references
    0 references
    Aby przywrócić świetność uzdrowisku Żegiestów, konieczne jest wyremontowanie kilku obiektów w tym m.in. Pijalni Anna która jest zamknięta z uwagi na zły stan techniczny budynku. Pijalnia zlokalizowana jest na półn. części uzdrowiska na działce 5805. Obiekt wybudowano w 1945, składa się z części pijalni z ujęciem wody mineralnej przykrytym dachem drewnianym wielospadowym oraz dobudowaną częścią rekreacyjna służąca do spacerów i konsumpcji wody mineralnej. Stąd pijalnia jest budynkiem w kształcie litery L o wym. 32mx12m i 12mx16m. Parametry: powierzchnia zabudowy:666 m2, użytkowa: 532 m2 kubatura: 1.550 m2Projekt obejmie:1. Remont dachu: wymiana pokrycia dachowego z eternitu na blachę dachówkową, zniszczonych obróbek blacharskich z blachy powlekanej, zniszczonych rur spustowych i rynien dachowych, zniszczonego łacenia dachu, zniszczonych elementów konstrukcji dachu, krokwie, płatwie, słupy, murlaty, obicia, podbitki dachu w ilości około 35.2. Remont elewacji kamiennej:wymiana i uzupełnienie zniszczonych elementów kamiennych elewacji, cokołów i murów oporowych, stolarki okiennej i drzwiowej w te same otwory, zniszczonych balustrad stalowych, uzupełnienie ubytków i tynków na elewacji, uzupełnienie i wymiana zniszczonych posadzek tarasowych.3. Remont wewn.: uzupełnienia i wykonanie nowych tynków i malowanie ścian, wymiana i uzupełnienie ścian z kamienia i kamiennej obudowy źródła, zniszczonych instalacji wodkan, C.O i instalacji elektrycznej, wymiana zniszczonych balustrad schodowych.Zakres prac w projekcie jest zgodny z wymogami jakie stawia pijalniom uzdrowiskowym zał. do Rozporządzenia Ministra Zdrowia z 28.07.2005 Źródło http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, zgodnie z którym pijalnie powinny być dostosowane do eksploatacji całorocznej i wyposażone m.in. w instalacje do wydawania i podgrzewania wody, halę spacerową, tablice objaśniające zasady korzystania z urządzeń i charakteryzujące wody. Przewidziano promocję. (Polish)
    0 references
    In order to restore Żegestre’s health spa, it is necessary to renovate several sites including, inter alia, Pijni Anna is closed due to the poor technical condition of the building. The beer is located on a part of the spa resort on parcel 5805. The plant was constructed in 1945, consisting of a portion of the pijni containing the mineral water covered by a wooden multi-estate centre, and a good leisure part serving for the space and the consumption of mineral water. As a result, the beer is a L-neutral building. 32mx12m and 12mx16m. Parameters: surface zabudowy:666 m², in use: 532 m² of volume: 1.550 m2The project will comprise: 1. Renovation of the roof: replacement of roofing roof covering on the roof plate, of destroyed sheet metal sheet from coated sheet, damaged roof pipes and guttering, damaged roof structures, damaged roof structures, croquies, flakes, poles, bricks, lobes, backings of the roof in an amount of around 35.2. Renovation of the façade kamiennej:wymiana and the destruction of damaged stone parts of the façade, of cperch and of retaining walls, window and door frames with the same openings, of damaged steel balustrades, additions to and replacement of the façade, supplement and replacement of the damaged façades. 3. Internal refurbishment: the completion and execution of new plasters and walls, replacing and completing the wall and wall of the source, the damaged water supply walls, the C.O and the electrical installations, replacement of the works of the estuary, the C.O and the electrical installations, replacement of the works affected by the staircase is in line with the requirements set out in the Decree of the Minister for Health (28.07.2005), Source: http:www2.mz.gov.plwwwfilesmastrukturadocszalprojrozp23112005.pdf, according to which beer should be adapted for year-round operation and are equipped with, inter alia, water heating and heating facilities, Spaak Hall, tables explaining the use of equipment and water. Promotion is foreseen. (English)
    0 references

    Identifiers

    RPMP.06.03.01-12-0434/16
    0 references