“Reconstruction of district road No 1370N from Siła in km 12+ 300 to DK51 in km 15+ 630 -stage II” (Q4428110)

From EU Knowledge Graph
Revision as of 07:24, 24 October 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding translation)
Jump to navigation Jump to search
Project Q4428110 in Poland
Language Label Description Also known as
English
“Reconstruction of district road No 1370N from Siła in km 12+ 300 to DK51 in km 15+ 630 -stage II”
Project Q4428110 in Poland

    Statements

    0 references
    2,171,598.43 zloty
    0 references
    482,746.33 Euro
    0 references
    2,895,464.58 zloty
    0 references
    643,661.78 Euro
    0 references
    75.0 percent
    0 references
    23 November 2016
    0 references
    31 December 2022
    0 references
    POWIAT OLSZTYŃSKI
    0 references
    0 references
    Przedmiotem projektu jest realizacja inwestycji na obszarze G. Stawiguda. Planowana inwestycja, polegająca na przebudowie drogi powiatowej Nr 1370 N wraz z niezbędną infrastrukturą w miejscowości Tomaszkowo, gm. Stawiguda na odcinku o długości 1,523 km (etap II). Lokalizacja - kilometraż Etapu II-1+600-3+123,21. Nośność drogi do 115kN dla drogi KR2. Zakres robót dla całego zamierzenia budowlanego oraz kolejność realizacji poszczególnych elementów obejmuje: -roboty rozbiórkowe (nawierzchniowe) -roboty ziemne-wykonanie wykopów w gruntach nieskalistych, wykonanie nasypów -wykonanie podbudów-dróg, chodników, zjazdów, wysp kanalizujących -wykonanie nawierzchnia drogi, chodnika, zjazdów, wysp kanalizujących -wykonanie krawężników i obrzeży chodnikowych, -wykonanie oznakowania poziomego, pionowego -wykonanie pobocza-wykonanie pobocza z destruktu pozyskanego z frezowania nawierzchni, -Roboty towarzyszące: Wykonanie ścieków przykrawężnikowych, zabezpieczenie infrastruktury podziemnej, wbudowanie przepustów, Dodatkowo w ramach projektu zaplanowano budowę azyli centralnych w osi jezdni- (dwa azyle centralne na wlocie i wylocie z miejscowości) oraz budowę wyniesionego przejścia dla pieszych. Szczegółowy opis techn. zawarto w dołączonej dok. projektowej. Etapy realizacji projektu: -złożenie wniosku o dof. -podpisanie umowy o dof. -wybór wykonawcy zgodnie z PZP -zawarcie umowy z wykonawcą i rozpoczęcie prac -realizacja prac zgodnie z założonym harmonogramem -promocja projektu -zakończenie projektu i podpisanie protokołu końcowego -końcowe rozliczenie projektu. Projekt wpisuje się w założenia określone w SzOOP RPO WWM 2014-2020 realizując założony cel: Poprawa zewnętrznej dostępności i wewn. spójności transportowej Miejskiego Obszaru Funkcjonalnego Olsztyna. Przedmiotem projektu jest przebudowa drogi lokalnej w miejskim obszarze funkcjonalnym Olsztyna (Mobilny MOF) - droga powiatowa nr 1370N. (Polish)
    0 references
    The subject of the project is the implementation of the investment in the area of G. Stawigud. Planned investment consisting of the reconstruction of the district road No 1370 N together with the necessary infrastructure in the town of Tomaszkowo, Stawiguda on a section of 1.523 km (stage II). Location — mileage Stage II-1 + 600-3 + 123.21. Load capacity of the road up to 115kN for the KR2 road. The scope of works for the entire construction purpose and the order of implementation of individual elements include: demolition robots (surface) -earth robots-execution of excavations in unscathed land, making embankments -construction of substructures-roads, pavements, descents, drainage islands -making the road surface, pavement, exits, draining islands -making curbs and pavement edges, -execution of horizontal, vertical markings -execution of the side-side from the destruction of the surface obtained from the milling of the pavement, -Accompanying works: Implementation of cross-section sewage, securing underground infrastructure, building culverts, Additionally, as part of the project, the construction of central ails in the roadway axis — (two central asylums at the inlet and outlet from the village) and the construction of an elevated pedestrian crossing. A detailed description of the techn. is included in the attached design document. Stages of project implementation: submission of an application for dof. signing an agreement on dof. —selection of the contractor in accordance with the PZP -conclusion of the contract with the contractor and commencement of works -implementation of works according to the planned schedule -promotion of the project -complete the project and signing the final protocol — final settlement of the project. The project is in line with the assumptions set out in the SzOOP ROP WWM 2014-2020 in pursuit of the objective of: Improving the external accessibility and internal transport cohesion of the Olsztyn Municipal Functional Area. The subject of the project is the reconstruction of a local road in the functional urban area of Olsztyn (Mobilny MOF) — district road No 1370N. (English)
    0 references
    WOJ.: WARMIŃSKO-MAZURSKIE, POW.: olsztyński
    0 references

    Identifiers

    RPWM.07.02.01-28-0001/20
    0 references