(10360.14072017.115000101) EFFICIENCY CARDUCCI (Q2057011)

From EU Knowledge Graph
Revision as of 17:40, 23 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in nl, and other parts: Adding Dutch translations)
Jump to navigation Jump to search
Project Q2057011 in Italy
Language Label Description Also known as
English
(10360.14072017.115000101) EFFICIENCY CARDUCCI
Project Q2057011 in Italy

    Statements

    0 references
    189,453.69 Euro
    0 references
    479,629.6 Euro
    0 references
    39.5 percent
    0 references
    29 March 2018
    0 references
    29 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI FUCECCHIO
    0 references
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    L?INTERVENTO RIGUARDA LA REALIZZAZIONE DI ALCUNE OPERE AI FINI DELL?EFFICIENTAMENTO ENERGETICO DELLA SCUOLA PRIMARIA ?G. CARDUCCI? DI FUCECCHIO. LA SCUOLA ? UNICO EDIFICO COSTITUITO, DA UN PUNTO DI VISTA ESCLUSIVAMENTE STRUTTURALE, DA DUE CORPI DI FABBRICA STRUTTURALMENTE INDIPENDENTI E REALIZZATI IN EPOCHE MOLTO DIVERSE (PRIMO IMPIANTO 1899, AMPLIAMENTO 1995). SONO PREVISTI DUE ?MACRO? INTERVENTI: SOSTITUZIONE DI TUTTI GLI INFISSI ESTERNI IN LEGNO DELLA ?PARTE VECCHIA? (AD ECCEZIONE DEI TRE PORTONI PRINCIPALI D'INGRESSO) E SOSTITUZIONE DELLA CALDAIA A SERVIZIO DELL'INTERO EDIFICO (PARTE "VECCHIA" E AMPLIAMENTO) CON NUOVA CALDAIA A CONDENSAZIONE. (Italian)
    0 references
    DOES THE MEASURE CONCERN THE IMPLEMENTATION OF CERTAIN WORKS FOR THE PURPOSE OF THE ENERGY EFFICIENCY OF PRIMARY SCHOOL? G. CARDUCCI? OF FUSNCHIO. SCHOOLS? ONLY IN STRUCTURAL TERMS, IT CONSISTS OF TWO BODIES WHICH ARE STRUCTURALLY INDEPENDENT AND CARRIED OUT AT VARIOUS TIMES (FIRST INSTALLATION 1899, EXTENSION 1995). ARE THERE TWO MACRO????????????????? INTERVENTIONS: A REPLACEMENT OF ALL THE EXTERIOR FIXTURES OF THE OLD SECTION? (WITH THE EXCEPTION OF THE THREE MAIN ENTRY GATES) AND REPLACEMENT OF THE BOILER FOR THE WHOLE BUILDING (“OLD” AND “ENLARGEMENT”) WITH A NEW CONDENSING BOILER. (English)
    0 references
    L’INTERVENTION CONCERNE-T-ELLE LA RÉALISATION DE CERTAINS TRAVAUX POUR L’EFFICACITÉ ÉNERGÉTIQUE DE L’ÉCOLE PRIMAIRE?G. CARDUCCI? DE FUCECCHIO. L’ÉCOLE? BÂTIMENT UNIQUE COMPOSÉ, D’UN POINT DE VUE PUREMENT STRUCTUREL, DE DEUX BÂTIMENTS STRUCTURELLEMENT INDÉPENDANTS ET CONSTRUITS À DES PÉRIODES TRÈS DIFFÉRENTES (PREMIÈRE USINE 1899, ÉLARGISSEMENT 1995). Y A-T-IL DEUX?MACRO? INTERVENTIONS: REMPLACEMENT DE TOUS LES APPAREILS EXTÉRIEURS EN BOIS DE L’ANCIENNE PIÈCE? (À L’EXCEPTION DES TROIS PORTES D’ENTRÉE PRINCIPALES) ET LE REMPLACEMENT DE LA CHAUDIÈRE POUR DESSERVIR L’ENSEMBLE DU BÂTIMENT (L’ANCIENNE PARTIE ET L’EXTENSION) PAR UNE NOUVELLE CHAUDIÈRE À CONDENSATION. (French)
    16 December 2021
    0 references
    HEEFT DE INTERVENTIE BETREKKING OP DE REALISATIE VAN ENKELE WERKEN VOOR DE ENERGIE-EFFICIËNTIE VAN DE BASISSCHOOL?G. CARDUCCI? UIT FUCECCHIO. DE SCHOOL? EEN ENKEL GEBOUW BESTAANDE UIT PUUR STRUCTUREEL OOGPUNT UIT TWEE STRUCTUREEL ONAFHANKELIJKE GEBOUWEN EN GEBOUWD IN ZEER VERSCHILLENDE PERIODES (EERSTE FABRIEK 1899, UITBREIDING 1995). ZIJN ER TWEE?MACRO? INTERVENTIES: VERVANGING VAN ALLE EXTERNE HOUTEN ARMATUREN VAN HET OUDE DEEL? (MET UITZONDERING VAN DE DRIE HOOFDINGANGEN) EN VERVANGING VAN DE KETEL OM HET GEHELE GEBOUW (HET „OUDE” GEDEELTE EN UITBREIDING) TE BEDIENEN DOOR EEN NIEUWE CONDENSATIEKETEL. (Dutch)
    23 December 2021
    0 references

    Identifiers