Design and implementation of Train Management System at NRIC SE (Q3881402)

From EU Knowledge Graph
Revision as of 18:55, 6 December 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q3881402 in Bulgaria
Language Label Description Also known as
English
Design and implementation of Train Management System at NRIC SE
Project Q3881402 in Bulgaria

    Statements

    0 references
    5,110,200.0 Bulgarian lev
    0 references
    2,606,202.0 Euro
    1 December 2021
    0 references
    6,012,000.0 Bulgarian lev
    0 references
    3,066,120.0 Euro
    1 December 2021
    0 references
    0.85 percent
    0 references
    30 January 2018
    0 references
    30 October 2023
    0 references
    Q3881395 (Deleted Item)
    0 references

    42°36'26.64"N, 25°29'8.38"E
    0 references
    Проектът предвижда изграждане на Система за управление на влаковата работа на ДП НКЖИ за подобряване на планирането и управлението на влаковата работа, а също така и в изпълнение на политиката на Европейската Комисия за изграждане на телематични приложения (Регламенти № 454/2011 и № 1305/2014/EU) в Транс-Европейската конвенционална железопътна система. СУВР има за задача да автоматизира процесите по планиране, прогнозиране, управление и отчитане на влаковата работа, изчисляване на инфраструктурни такси, водене на статистика и подготвяне на данни за анализ в ДП НКЖИ. Системата ще дава възможност на потребителите да получават справки в зависимост от пълномощията им, както и да създават допълнителни такива в зависимост от техните потребности и права за достъп, с възможност за автоматично обновяване на справките с актуални данни.С анекс № 1 от проекта отпадат дейностите, свързани със СМКППЖСД. (Bulgarian)
    0 references
    The project envisages the construction of a Train Management System of NRIC SE to improve the planning and management of train work, as well as in implementation of the policy of the European Commission for the construction of telematic applications (Regulations No 454/2011 and No 1305/2014/EU) in the Trans-European Conventional Rail System. The SVR has the task of automating the processes of planning, forecasting, management and reporting of train work, calculating infrastructure charges, keeping statistics and preparing data for analysis at NRIC SE. The system will allow users to receive reports depending on their mandates, as well as to create additional ones depending on their needs and access rights, with the possibility of automatic updating of the reports with current data. With annex No 1 of the project, activities related to the ICPRZhD are dropped. (English)
    2 December 2021
    0 references
    Le projet prévoit la construction d’un système de gestion des trains de NRIC SE afin d’améliorer la planification et la gestion du travail ferroviaire, ainsi que la mise en œuvre de la politique de la Commission européenne pour la construction d’applications télématiques (règlements no 454/2011 et no 1305/2014/UE) dans le système ferroviaire transeuropéen conventionnel. Le SVR a pour tâche d’automatiser les processus de planification, de prévision, de gestion et de rapport du travail ferroviaire, de calculer les redevances d’infrastructure, de tenir des statistiques et de préparer des données pour analyse à NRIC SE. Le système permettra aux utilisateurs de recevoir des rapports en fonction de leurs mandats, ainsi que d’en créer d’autres en fonction de leurs besoins et de leurs droits d’accès, avec la possibilité d’une mise à jour automatique des rapports avec les données actuelles. (French)
    3 December 2021
    0 references
    Das Projekt sieht den Bau eines Zugmanagementsystems der NRIC SE zur Verbesserung der Planung und Verwaltung der Zugarbeit sowie die Umsetzung der Politik der Europäischen Kommission für den Bau telematischer Anwendungen (Verordnungen Nr. 454/2011 und Nr. 1305/2014/EU) im transeuropäischen konventionellen Eisenbahnsystem vor. Der SVR hat die Aufgabe, die Prozesse der Planung, Prognose, Verwaltung und Berichterstattung von Zugarbeiten zu automatisieren, Infrastrukturgebühren zu berechnen, Statistiken zu führen und Daten für die Analyse bei der NRIC SE zu erstellen. Das System wird es den Nutzern ermöglichen, je nach ihren Mandaten Berichte zu erhalten und je nach Bedarf und Zugriffsrechten zusätzliche Berichte zu erstellen, wobei die Möglichkeit besteht, die Berichte automatisch mit aktuellen Daten zu aktualisieren. Mit Anhang Nr. 1 des Projekts werden die Aktivitäten im Zusammenhang mit dem ICPRZhD eingestellt. (German)
    4 December 2021
    0 references
    България
    0 references

    Identifiers

    BG16M1OP001-4.001-0009
    0 references