Energy modernisation of the accommodation facility “Siemczyno Palace” through the installation of heat pumps and photovoltaic micro-installation. (Q137732)
Jump to navigation
Jump to search
Project Q137732 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy modernisation of the accommodation facility “Siemczyno Palace” through the installation of heat pumps and photovoltaic micro-installation. |
Project Q137732 in Poland |
Statements
1,297,950.5 zloty
0 references
1,659,370.0 zloty
0 references
78.22 percent
0 references
21 August 2018
0 references
12 February 2019
0 references
PAŁAC SIEMCZYNO ADAM ANDZIAK
0 references
Przedmiotem projektu będzie modernizacja energetycznea obiektu noclegowego „Pałac Siemczyno” poprzez montaż nowego, odnawialnego źródła ciepła w technologii rewersyjnych, gruntowych pomp ciepła typu solanka/woda, o nominalnej mocy grzewczej 216 kW na potrzeby C.O. i C.W.U. wraz z instalacją C.O., z aktywnym systemem 7 / 33 Wydruk kontrolny, suma kontrolna: 8a277f6b54 dystrybucji ciepła za pośrednictwem klimakonwektorów w układzie dwururowym w całym obiekcie i instalacją C.W.U. w kotłowni obiektu oraz montaż odnawialnego źródła energii elektrycznej opartego na technologii fotowoltaicznej o nominalnej mocy elektrycznej 39,78 kW. Wykonanie projektu obejmuje zrealizowanie następujących prac: I. Roboty instalacyjno-montażowe – system ogrzewania I.1. Wykonanie pionowego wymiennika gruntowego (dolnego źródło ciepła). I.2. Wykonanie kotłowni. I.3. Wykonanie instalacji dystrybucji ciepła w obiekcie. I.4. Wykonanie instalacji elektrycznej na potrzeby urządzeń C.O. i C.W.U. w budynku. II. Roboty instalacyjno-montażowe - instalacja fotowoltaiczna II.1. Montaż konstrukcji montażowej. II.2. Montaż modułów fotowoltaicznych. II.3. Montaż inwerterów ( falowniki) II.4. Wykonanie dedykowanej instalacji elektrycznej. Za realizację projektu odpowiadać będzie wnioskodawca, który zlecać będzie wykonawstwo poszczególnych elementów projektu wybranym w podstępowaniach ofertowych firmom zewnętrznym. Projekt jest stacjonarny gdyż dotyczy istniejącego obiektu noclegowego. Powstałą infrastrukturą zarządzać będzie i eksploatować będzie wnioskodawca w ramach prowadzonej działalności gospodarczej (usługi turystyczne). Bezpośrednio po realizacji projektu możliwe będzie pełne wykorzystanie funkcjonalności powstałej infrastruktury. (Polish)
0 references
The subject of the project will be the modernisation of the energy facility “Siemczyno Palace” by mounting a new renewable heat source in reverse, ground heat pumps of brine/water type, with nominal heating power of 216 kW for C.O. and C.W.U. together with the C.O. installation, with active system 7/33 Control print, control sum: 8a277f6b54 heat distribution via climateconvectors in a two-tube system throughout the facility and installation of C.W.U. in the boiler room of the facility and installation of a renewable source of electricity based on photovoltaic technology with nominal electrical power of 39,78 kW. The implementation of the project shall include the following works: I. Installation and assembly works – heating system I.1. Construction of a vertical ground heat exchanger (lower heat source). I.2. Construction of the boiler room. I.3. Execution of heat distribution installations in the facility. I.4. Electrical installation for C.O. and C.W.U. equipment in the building. II. Installation and assembly robots – photovoltaic installation II.1. Assembly of the mounting structure. II.2. Installation of photovoltaic modules. II.3. Installation of inverters (inverters) II.4. Execution of a dedicated electrical installation. The project will be carried out by the applicant, who will commission the execution of individual elements of the project selected in the tendering of external companies. The project is stationary as it concerns an existing accommodation facility. The infrastructure will be managed and operated by the applicant as part of the business activity (tourist services). Immediately after the implementation of the project, it will be possible to make full use of the functionalities of the created infrastructure. (English)
21 October 2020
0 references
L’objet du projet sera la modernisation énergétique de l’installation d’hébergement «Pałac Siemczyno» par l’installation d’une nouvelle source de chaleur renouvelable dans la technologie inverse, des pompes à chaleur saumâtre/eau souterraines d’une puissance calorifique nominale de 216 kW aux fins de C.O. et C.W.U. ainsi que l’installation du C.O., avec le système actif 7/33 Control print, vérifier la somme: 8a277f6b54 distribution de chaleur via des bobines à deux tuyaux dans l’ensemble de l’installation et installation de CWU dans la chaufferie de l’installation et installation d’une source d’électricité renouvelable basée sur la technologie photovoltaïque d’une puissance électrique nominale de 39,78 kW. La mise en œuvre du projet implique la réalisation des travaux suivants: I. robots d’installation et d’assemblage — système de chauffage I.1. Construction d’un échangeur vertical de sol (source de chaleur inférieure). I.2. Exécution de la chaufferie. I.3. Réalisation d’une installation de distribution de chaleur dans l’installation. I.4. Installation électrique pour les équipements C.O. et C.W.U. dans le bâtiment. II. Travaux d’installation et d’assemblage — PV installation II.1. Installation de la structure d’assemblage. II.2. Installation de modules photovoltaïques. II.3. Installation des onduleurs (onduleurs) II.4. Exécution de l’installation électrique dédiée. La mise en œuvre du projet incombera au demandeur, qui externalisera l’exécution des différents éléments du projet sélectionnés dans les procédures d’appel d’offres à des entreprises externes. Le projet est stationnaire parce qu’il concerne une installation d’hébergement existante. L’infrastructure qui en résulte sera gérée et exploitée par le demandeur dans le cadre de son activité commerciale (services touristiques). Immédiatement après la mise en œuvre du projet, il sera possible d’utiliser pleinement la fonctionnalité de l’infrastructure qui en résulte. (French)
2 December 2021
0 references
Identifiers
RPZP.02.10.00-32-B020/17
0 references