Construction of access roads to the viaduct within Lotnicza and Wing Streets in Elbląg (Q132702)

From EU Knowledge Graph
Revision as of 19:59, 2 December 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): L’investissement, qui est la deuxième étape du projet «Améliorer le lien entre le quartier de Zatorze (zone d’entrepreneuriat de la zone fonctionnelle d’Elbląski) et le centre-ville par la construction d’un viaduc le long d’ul.Lotnicza et Skrzydlata avec des routes d’accès et l’adaptation des éléments existants du réseau routier», comprend l’amélioration de la connexion du quartier des transports du Golfe, reconnu dans la stratégie de développem...)
Jump to navigation Jump to search
Project Q132702 in Poland
Language Label Description Also known as
English
Construction of access roads to the viaduct within Lotnicza and Wing Streets in Elbląg
Project Q132702 in Poland

    Statements

    0 references
    10,797,548.96 zloty
    0 references
    2,591,411.75 Euro
    13 January 2020
    0 references
    27,490,103.6 zloty
    0 references
    6,597,624.86 Euro
    13 January 2020
    0 references
    39.28 percent
    0 references
    19 January 2017
    0 references
    27 December 2018
    0 references
    GMINA MIASTO ELBLĄG
    0 references
    0 references

    54°11'56.0"N, 19°26'28.0"E
    0 references
    Inwestycja,będąca II etapem przedsięwzięcia "Poprawa powiązania dzielnicy Zatorze (strefy przedsiębiorczości Elbląskiego Obszaru Funkcjonalnego) z centrum Miasta poprzez budowę wiaduktu w ciągu ul.Lotniczej i Skrzydlatej wraz z drogami dojazdowymi i dostosowaniem istniejących elementów sieci drogowej", obejmuje poprawę powiązania komunikacyjnego dzielnicy Zatorze, uznanej w Strategii Rozwoju EOF/ZIT za centrum przedsiębiorczości EOF, z centrum Elbląga. Zakres rzeczowy: -przebudowa ul.Lotniczej jako połączenia drogowego Al.Grunwaldzkiej oraz ul.Skrzydlatej w kl.techn.Z, o szer.pasa ruchu 3,5m wraz z drogą rowerową o szer.2,5m i chodnikiem o szer.2m oraz z zabezpieczeniem niezbędnych potrzeb w zakresie infr.techn, w tym budowę kanalizacji deszcz., budowę kanałów technolog., przebudowę oświetlenia ulicznego, przebudowę istn.uzbrojenia wraz z usunięciem kolizji (sieci wod., sanit., gaz., ciepłow., energet., teletechn.) -budowa 2 łącznic Ł1 i Ł2 w klasie L, o szer.pasa ruchu 3,5m oraz budowę 3 rond (2 o szer.jezdni 5,5m i 1 o szer.jezdni 6m) -przebudowa ul.Kilińskiego (zamknięcie relacji ul.Lotniczej z ul.Kilińskiego poprzez budowę na ul.Kilińskiego placu do zawracania) -przebudowa tzw. starej ul.Lotniczej od projektowanego ronda do jej skrzyżowania z ul.Fredry. W sąsiedztwie torowiska kolejowego tzw.stara ul.Lotnicza przekształcona będzie w dojazdy do nieruchomości z chodnikiem i ścieżką rowerową -przebudowa ul.Fredry w kl.techn.L o szer.pasa ruchu 3m wraz z zabezpieczeniem niezbędnych potrzeb w zakresie infr.techn. -przebudowa ul.Lotniczej od skrzyżowania z ul.Skrzydlatą, o szer.pasa ruchu 3m, drogą rowerową o szer.2m i chodnikiem o szer.2,5m -kompleksowy projekt organizacji ruchu układu komunikacyjnego -urządzenie zieleni wraz z małą architekturą -budowa przejścia dla pieszych pod łącznicą Ł2. Projekt realizuje wprost cel szczeg.Poddz.7.2.2: Poprawa zewnętrznej dostępności i wewnętrznej spójności transportowej miejskiego obszaru funkcjonalnego Elbląga. (Polish)
    0 references
    The investment, which is the second stage of the project “Improving the link between the district of Zatorze (business zone of Elbląski Functional Area) with the city centre by building a viaduct within Lotnicza and Skrzydlata Street with access roads and adapting existing elements of the road network”, includes improving the communication link between the Zatorze district, recognised in the EOF/ZIT Development Strategy as the EOF entrepreneurship centre, with the centre of Elbląg. Material scope: The construction of ul. Lotnicza from Krunwaldzka Street and Skrzydlata Street in C.Z., with a width of traffic of 3.5 m with a bicycle road of 2.5 m wide and a pavement of 2 m wide and with the necessary needs in the scope of infr.technn, including construction of the sewage system, construction of technological canals, reconstruction of street lighting, reconstruction of itn. In the vicinity of the railway track, the so-called old Lotnicza street will be transformed into access to the property with a pavement and a bicycle path – refurbishment of Fredry Street into a C.techn.L wide range of traffic 3 m along with securing the necessary needs in the field of infr.techn. —reconstruction of Lotnicza Street from the junction with Skrzydlata Street, for a width of 3 m, a bicycle road with a width of 2 m and a pavement of 2.5 m -comprehensive project of organisation of traffic of the communication system – greening and small architecture – the construction of a pedestrian crossing under the L2 link. The project directly fulfils the objective of details Subdz.7.2.2: Improve the external accessibility and internal transport coherence of the urban functional area of Elbląg. (English)
    21 October 2020
    0 references
    L’investissement, qui est la deuxième étape du projet «Améliorer le lien entre le quartier de Zatorze (zone d’entrepreneuriat de la zone fonctionnelle d’Elbląski) et le centre-ville par la construction d’un viaduc le long d’ul.Lotnicza et Skrzydlata avec des routes d’accès et l’adaptation des éléments existants du réseau routier», comprend l’amélioration de la connexion du quartier des transports du Golfe, reconnu dans la stratégie de développement de l’EOF/ZIT comme le centre d’affaires du FEOGA, avec le centre d’Elbląg. Champ d’application matériel: — la reconstruction d’ul.Lotnicza comme liaison routière d’Al.Grunwaldzka et d’ul.Skrzydlata dans le kl.techn.Z, avec une largeur de 3,5 m de circulation avec une route cyclable d’une largeur de 2,5 m et une passerelle d’une largeur de 2 m et la sécurisation des besoins nécessaires dans le domaine de l’infr.techn, y compris la construction d’égouts pluviaux., reconstruction de l’éclairage public, reconstruction de l’armement existant avec l’enlèvement des collisions (réseaux d’eau, assainissement, gaz, chauffage, énergie, télétechn.) — la construction de 2 connexions L1 et Ł2 en classe L, d’une largeur de 3,5 m et la construction de 3 ronds-points (2 avec une longueur de chaussée de 5,5 m et une chaussée large de 6 m) — reconstruction d’ul.Kilińskiego (fermeture de la relation entre ul.Lotnicza et ul.Kilińskiego par la construction) sur ul.Kilińskiego une place pour se retourner) — reconstruction de l’ancien ul.Lotnicza du rond-point prévu à son intersection avec la rue Fredry. À proximité de la voie ferrée, la soi-disant vieille rue de l’aéroport sera transformée en accès à la propriété avec un trottoir et une piste cyclable — la reconstruction de la rue Fredry dans le kl.techn.L avec une largeur de trafic de 3 m, ainsi que la sécurisation des besoins nécessaires dans le domaine de infr.techn. — reconstruction d’ul.Lotnicza à partir de l’intersection avec ul.Skrzydlata, d’une largeur de 3 m, d’une route cyclable d’une largeur de 2 m et d’une passerelle d’une largeur de 2,5 m — un projet global pour l’organisation de la circulation d’un système de communication — un dispositif vert avec une petite architecture — construction d’un passage piétonnier sous la liaison Ł2. Le projet poursuit l’objectif de détail. Subdz.7.2.2: Améliorer l’accessibilité externe et la cohérence des transports internes de la zone urbaine fonctionnelle d’Elbląg. (French)
    2 December 2021
    0 references

    Identifiers

    RPWM.07.02.02-28-0001/17
    0 references