Modernisation of the entrance to the internal port (in Gdańsk). Stage IIIA (Q85888)

From EU Knowledge Graph
Revision as of 09:26, 7 December 2021 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in de, and other parts: Adding German translations)
Jump to navigation Jump to search
Project Q85888 in Poland
Language Label Description Also known as
English
Modernisation of the entrance to the internal port (in Gdańsk). Stage IIIA
Project Q85888 in Poland

    Statements

    0 references
    132,600,000.0 zloty
    0 references
    31,824,000.0 Euro
    13 January 2020
    0 references
    156,000,000.0 zloty
    0 references
    37,440,000.0 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    21 April 2016
    0 references
    31 March 2021
    0 references
    URZĄD MORSKI W GDYNI
    0 references
    0 references

    54°21'41.0"N, 18°37'41.5"E
    0 references
    Projekt obejmuje następujące prace: 1. Budowa toru wodnego wraz z obrotnicą na Martwej Wiśle; 2. Przebudowa i remont nabrzeża Flisaków (Martwa Wisła); 3. Przebudowa i remont nabrzeża Retmanów (Martwa Wisła); 4. Przebudowa i remont nabrzeża Szyprów (Martwa Wisła); 5. Przebudowa i remont nabrzeża Motławy odcinek nr XVIII; 6. Przebudowa nabrzeża Polski Hak. Projekt obejmuje również wykonanie prac w zakresie usunięcia obiektów podwodnych znajdujących się na dnie toru wodnego na Martwej Wiśle. (Polish)
    0 references
    The project shall include the following works: 1. Construction of a water track with a turntable on the Dead Vistula; 2. Reconstruction and refurbishment of the floating quay (Martwa Wisła); 3. Reconstruction and refurbishment of the Retman quay (Martwa Wisła); 4. Reconstruction and renovation of the skipper’s quay (Martwa Wisła); 5. Reconstruction and refurbishment of the Motława embankment section XVIII; 6. Reconstruction of the wharf of Poland Hook. The project also includes work on removing underwater objects located at the bottom of the Dead Vistula track. (English)
    14 October 2020
    0 references
    Le projet comprend les travaux suivants: 1. Construction d’une voie navigable avec platine tournante sur Martwa Wisła; 2. Reconstruction et rénovation du quai de Flisaków (Martva Vistula); 3. Reconstruction et rénovation du quai de Retman (Martva Vistula); 4. Reconstruction et rénovation du front de mer de Szyprów (Martwa Wisła); 5. Reconstruction et rénovation du quai Motławy no XVIII; 6. Reconstruction du front de mer de Pologne Crochet. Le projet comprend également l’exécution de travaux d’enlèvement d’objets sous-marins situés au fond de la voie navigable sur Martwa Wisła. (French)
    30 November 2021
    0 references
    Das Projekt umfasst folgende Arbeiten: 1. Bau einer Wasserstraße mit Drehscheibe auf Martwa Wisła; 2. Umbau und Renovierung des Flisaków Kais (Martva Vistula); 3. Umbau und Renovierung des Retman’s Kais (Martva Vistula); 4. Wiederaufbau und Renovierung der Uferpromenade von Szyprów (Martwa Wisła); 5. Umbau und Renovierung des Kaiabschnitts Motławy Nr. XVIII; 6. Wiederaufbau der Uferpromenade von Polen Hook. Das Projekt umfasst auch die Durchführung von Arbeiten zur Entfernung von Unterwasserobjekten, die sich am Wasserboden der Martwa Wisła befinden. (German)
    7 December 2021
    0 references

    Identifiers

    POIS.03.02.00-00-0014/17
    0 references